(Removed claim: summary (P836): The modernisation of the 35B63 pumps is intended to increase efficiency in relation to its initial efficiency.The investor expects that the equipment of pumps in the new propulsion system will lead to an increase in the efficiency of pumping, the matching of pumps with the required adjustment fields and a reduction in demand for electric power, resulting in a saving in electricity.In addition, it is also important to secure the high reliabilit...) |
(Created claim: summary (P836): The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high r...) |
||||||||||||||
Property / summary | |||||||||||||||
The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high reliability of the operation of modernised pump units and ensuring the customer’s continuity of heat supply. The aim of the project is to: — modernisation of 35B63 pumps with the use of new materials and manufacturing technologies, which will allow to improve the obtained parameters in relation to the factory condition; — replacement of existing ring engines and their collaborative valve cascade systems for cage engines cooperating with frequency converters, which will be implemented by the supply, control and regulation of the NQC15AP101 and NQC25AP101 network water pumps with 800 kW 690 V 50 Hz engines based on frequency converters. (English) | |||||||||||||||
Property / summary: The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high reliability of the operation of modernised pump units and ensuring the customer’s continuity of heat supply. The aim of the project is to: — modernisation of 35B63 pumps with the use of new materials and manufacturing technologies, which will allow to improve the obtained parameters in relation to the factory condition; — replacement of existing ring engines and their collaborative valve cascade systems for cage engines cooperating with frequency converters, which will be implemented by the supply, control and regulation of the NQC15AP101 and NQC25AP101 network water pumps with 800 kW 690 V 50 Hz engines based on frequency converters. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high reliability of the operation of modernised pump units and ensuring the customer’s continuity of heat supply. The aim of the project is to: — modernisation of 35B63 pumps with the use of new materials and manufacturing technologies, which will allow to improve the obtained parameters in relation to the factory condition; — replacement of existing ring engines and their collaborative valve cascade systems for cage engines cooperating with frequency converters, which will be implemented by the supply, control and regulation of the NQC15AP101 and NQC25AP101 network water pumps with 800 kW 690 V 50 Hz engines based on frequency converters. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 13:02, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the system of 35B63 network water pumps at PGE GiEK S.A. Oddział Elektrociepłownia Kielce |
Project in Poland financed by DG Regio |
Statements
1,050,000.0 zloty
0 references
1,400,000.0 zloty
0 references
75.0 percent
0 references
24 April 2018
0 references
30 April 2019
0 references
PGE ENERGIA CIEPŁA SPÓŁKA AKCYJNA
0 references
Modernizacja parametrowa pomp 35B63 ma na celu podniesienie sprawności w stosunku do jej pierwotnej sprawności fabrycznej. Inwestor oczekuje, że wyposażenie pomp w nowe układy napędowe doprowadzi do wzrostu sprawności pompowania, dopasowania pracy pomp do wymaganych pól regulacji oraz obniżenia zapotrzebowania na moc elektryczną, co w efekcie końcowym przełoży się na oszczędność energii elektrycznej. Dodatkowo duże znaczenie przykłada się też do uzyskania wysokiej niezawodności pracy zmodernizowanych zespołów pompowych oraz zapewnienia odbiorcy ciągłości dostaw ciepła. Celem Projektu jest: - modernizacja pomp 35B63 z zastosowaniem nowych materiałów i technologii wykonania, co umożliwi poprawienie uzyskiwanych parametrów względem stanu fabrycznego; - wymiana istniejących silników pierścieniowych i współpracujących z nimi układów kaskad zaworowych na silniki klatkowe współpracujące z przemiennikami częstotliwości, które zostaną zrealizowane przez wykonanie układu zasilania, sterowania i regulacji pomp wody sieciowej NQC15AP101 i NQC25AP101 z silnikami 800 kW 690 V 50 Hz w oparciu o przemienniki częstotliwości. (Polish)
0 references
The parameter modernisation of 35B63 pumps is intended to increase efficiency in relation to its original factory efficiency. The investor expects the pumps to be equipped with new propulsion systems to increase the efficiency of pumping, adjust the operation of pumps to the required adjustment fields and reduce the demand for electrical power, resulting in savings in electricity. In addition, high importance is also attached to achieving high reliability of the operation of modernised pump units and ensuring the customer’s continuity of heat supply. The aim of the project is to: — modernisation of 35B63 pumps with the use of new materials and manufacturing technologies, which will allow to improve the obtained parameters in relation to the factory condition; — replacement of existing ring engines and their collaborative valve cascade systems for cage engines cooperating with frequency converters, which will be implemented by the supply, control and regulation of the NQC15AP101 and NQC25AP101 network water pumps with 800 kW 690 V 50 Hz engines based on frequency converters. (English)
14 October 2020
0 references
Identifiers
POIS.01.02.00-00-0008/18
0 references