(Removed claim: summary (P836): The scope of the project involves the reconstruction of the GPZ 110/15 kV substation in order to enable the development of renewable energy.The station is part of the 110 kV distribution network where the 15 kV electricity transition is performed.The 110/15 kV Station plant is located at ul.Cooperative 14 in the town of Grzmica municipality on plots Nos 4/23 and 4/25, 0013-Grzmicing area.The land is owned by ENERGA-OPERATOR SA (KO1I/00029281/4...) |
||
Property / summary | |||
Property / summary: The scope of the project involves the reconstruction of the GPZ 110/15 kV substation in order to enable the development of renewable energy.The station is part of the 110 kV distribution network where the 15 kV electricity transition is performed.The 110/15 kV Station plant is located at ul.Cooperative 14 in the town of Grzmica municipality on plots Nos 4/23 and 4/25, 0013-Grzmicing area.The land is owned by ENERGA-OPERATOR SA (KO1I/00029281/4 and KO1I/00022121/6).The total real estate on which the station is located is 1.0425 ha.The municipality of Grzmiórze is located in the eastern part of the Zachodniopomorskie province in the district of caulceckim.The municipality of Grzmienia is one of the 9 municipalities of the district of szczecinecki.It is adjacent to the municipalities of Szczecinek, Barwice (Mr. Barwice), Bobolice (Mr Białogard) and Mr Tychowo.The direct objective of the project is to increase the capacity to connect renewable energy sources to the grid and to increase the reliability of electricity supply in the project area.The project indirectly aims to:• To improve the energy provision of the energy supplied,• to contribute, by increasing the possibility to integrate more RES energy into the grid, to reduce the need for conventional energy production, thus reducing fuel consumption and, consequently, to reduce emissions of pollutants into the atmosphere,• to improve the efficiency of the operation of the distribution system.The purpose of the project at product level is to:modernisation of 1 stations, (b) additional capacity for connecting renewable sources to the electricity grid of 8.36 MW.The purpose of the project is to:decrease in greenhouse gas emissions.This will be achieved by increasing the network’s capacity to connect renewable energy sources.The purpose of the project at the level of impact is to:prop up (English) / rank | |||
Revision as of 13:01, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of 110/15 kV Station in order to enable the development of renewable energy |
Project in Poland financed by DG Regio |
Statements
2,255,663.47 zloty
0 references
3,095,000.0 zloty
0 references
72.88 percent
0 references
20 December 2018
0 references
30 September 2020
0 references
ENERGA-OPERATOR SPÓŁKA AKCYJNA
0 references
Zakres Projektu obejmuje przebudowę stacji elektroenergetycznej GPZ 110/15 kV Grzmiąca celem umożliwienia rozwoju energetyki odnawialnej. Stacja stanowi element sieci dystrybucyjnej na napięciu 110 kV, na której odbywa się transformacja energii elektrycznej na napięcie 15 kV. Stacja 110/15 kV Grzmiąca zlokalizowana jest przy ul. Spółdzielczej 14 w miejscowości Grzmiąca (gmina Grzmiąca) na działkach nr 4/23 i 4/25, obręb 0013-Grzmiąca. Grunt znajduje się w użytkowaniu wieczystym ENERGA-OPERATOR SA (KO1I/00029281/4 i KO1I/00022121/6). Powierzchnia łączna nieruchomości, na których zlokalizowana jest stacja wynosi 1,0425 ha. Gmina Grzmiąca jest położona we wschodniej części województwa zachodniopomorskiego w powiecie szczecineckim. Gmina Grzmiąca jest jedną z 9 gmin powiatu szczecineckiego. Sąsiaduje z gminami Szczecinek, Barwice (p. szczecinecki), Bobolice (p. białogardzki) i Tychowo (p. koszaliński). Celem bezpośrednim Projektu jest zwiększenie potencjału dla przyłączania źródeł energii odnawialnej do sieci, a także zwiększenie niezawodności dostaw energii elektrycznej na obszarze oddziaływania projektu. Celami pośrednimi projektu są: • poprawa parametrów energetycznych dostarczanej energii, • przyczynienie się, poprzez zwiększenie możliwości przyjęcia do sieci większej ilości energii z OZE, do ograniczenia zapotrzebowania na produkcję energii ze źródeł konwencjonalnych, a tym samym zmniejszenie zużycia paliw i, w konsekwencji, obniżenie emisji zanieczyszczeń do atmosfery, • poprawa efektywności pracy systemu dystrybucyjnego. Celem Projektu na poziomie produktu jest: a) modernizacja 1 stacji elektroenergetycznej, b) dodatkowa zdolność przyłączania źródeł odnawialnych do sieci elektroenergetycznej w wysokości 8,36 MW. Celem Projektu na poziomie rezultatu jest: spadek emisji gazów cieplarnianych. Cel ten zostanie osiągnięty poprzez zwiększenie zdolności przyłączania źródeł energii odnawialnej do sieci. Celem Projektu na poziomie oddziaływania jest: popra (Polish)
0 references
Identifiers
POIS.01.01.02-00-0005/18