Fibre optic rollout (FFTH) in Eure-et-Loir (Q142041): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Fibre optic rollout (FFTH) in Eure-et-Loir |
Revision as of 13:58, 12 October 2020
Project in France financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Fibre optic rollout (FFTH) in Eure-et-Loir |
Project in France financed by DG Regio |
Statements
4,900,000.0 Euro
0 references
11,128,482.0 Euro
0 references
44.03 percent
0 references
1 March 2015
0 references
31 December 2018
0 references
EURE ET LOIR NUMÉRIQUE
0 references
28008
0 references
Le Conseil départemental d’Eure-et-Loir a initié un diagnostic Très Haut Débit de son territoire dès la fin 2009. En 2011, l’Assemblée départementale a voté à l’unanimité l’actualisation du SDTAN d’Eure-et-Loir, dont les objectifs directeurs sont les suivants : - Éviter une fracture numérique entre les territoires ruraux et ceux plus urbanisés ou situés en franges franciliennes, - Offrir à 100% des professionnels et des foyers euréliens un accès à un réseau internet avec un débit minimal de 10 Mbits/s, dont 90 % dès 2020. A l’instar des objectifs nationaux, déclinés dans le plan France Très Haut débit, l’objectif d’aménagement très haut débit du département à échéance 2020 est de couvrir 78% de la population en fibre optique à l’abonné (FttH) (dont 39% par l’initiative privée). Le réseau FttH déployé dans le cadre de l’opération objet de la présente demande de financement constitue une phase, autonome et techniquement indépendante d’un réseau plus global déployé par Eure-et-Loir Numérique sur la période 2013-2022 - et qui comporte d’autres déploiements FttH non éligibles, ainsi que des opérations de montées en débit sur les zones les plus rurales (émargeant sur le FEADER). Suite voir rapport d'instruction https://alfresco.regioncentre.fr/share/s/U2CSX5vAS5C5WzH1MLeXgg (French)
0 references
The Departmental Council of Eure-et-Loir initiated a Very High Debit diagnosis of its territory at the end of 2009. In 2011, the Departmental Assembly unanimously voted to update the Eure-et-Loir SDTAN, whose guiding objectives are as follows: — Avoid a digital divide between rural areas and those more urbanised or located in Francilian fringes, – To provide 100 % of Eurelian professionals and households with access to an Internet network with a minimum speed of 10 Mbits/s, 90 % of which from 2020 onwards. Like the national targets, which are set out in the France Très haute débit plan, the objective of the department’s very high-speed development by 2020 is to cover 78 % of the population of fibre optic to subscribers (FttH) (of which 39 % by private initiative). The FttH network deployed as part of the operation covered by the present application for funding is a phase, autonomous and technically independent of a more global network deployed by Eure-et-Loir Numérique over the period 2013-2022 – and which includes other non-eligible FttH deployments, as well as flow-up operations in the most rural areas (starting on the EAFRD). More see instruction report https://alfresco.regioncentre.fr/share/s/U2CSX5vAS5C5WzH1MLeXgg (English)
12 October 2020
0 references
0 references
Identifiers
2434
0 references
5220
0 references