Reducing the energy intensity of beer production (Q15675): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: budget (P474): 328,158.16000000003 euro) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 328,158.16000000003 Euro / rank | |||||||||||||||
Property / budget: 328,158.16000000003 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 328,158.16000000003 Euro / qualifier | |||||||||||||||
|
Revision as of 22:58, 24 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of beer production |
Project in Czech Republic financed by DG Regio |
Statements
3,281,581.6 Czech koruna
0 references
8,203,954.0 Czech koruna
0 references
40 percent
0 references
6 June 2017
0 references
27 August 2018
0 references
Měšťanský pivovar Havlíčkův Brod a.s.
0 references
58001
0 references
Komplexní modernizace a rekonstrukce technologií souvisejících s výrobou, rozvodem a spotřebou energie při výrobě piva ( výroba a rozvod páry a teplé vody, rekuperace tepla, vzduchotechnika, výroba chladu ) včetně stavebních opatření na snižování energetické náročnosti budov ( zateplení, výměna oken) a modernizace systémů měření a regulace. Záměr se týká 80% areálu společnosti (je ve vlastnictví žadatele). a. (Czech)
0 references
Comprehensive modernisation and reconstruction of technology related to energy production, distribution and consumption of energy in beer production (production and distribution of steam and hot water, heat recovery, ventilation, cold production) including building measures to reduce the energy performance of buildings (insulation, replacement of windows) and the modernisation of measurement and control systems. The project concerns 80 % of the company’s site (it is owned by the applicant). (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0002917
0 references