Improving the energy performance and the reconstruction of the housing of the Petr Bezruče 369, Lower Benešov (Q75252): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: budget (P474): 80,612.31480000001 euro)
Property / budget
80,612.31480000001 Euro
Amount80,612.31480000001 Euro
UnitEuro
 
Property / budget: 80,612.31480000001 Euro / rank
Preferred rank
 
Property / budget: 80,612.31480000001 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / budget: 80,612.31480000001 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 22:17, 24 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improving the energy performance and the reconstruction of the housing of the Petr Bezruče 369, Lower Benešov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    604,592.36 Czech koruna
    0 references
    24,183.69 Euro
    10 January 2020
    0 references
    2,015,307.87 Czech koruna
    0 references
    30.0 percent
    0 references
    1 September 2016
    0 references
    12 May 2017
    0 references
    30 September 2017
    0 references
    Stavební bytové družstvo Petra Bezruče Dolní Benešov
    0 references
    0 references

    49°55'15.2"N, 18°6'16.6"E
    0 references
    74722
    0 references
    Komplexní rekonstrukce bytového domu spočívající zejména vZateplení obvodového pláštěOprava bleskosvodůRenovace balkónů v rámci opatření spojených se zateplením obvodového pláště budovyOprava hydroizolace spodní části domu v přímé souvislosti se zateplením obv. Konstrukcí (Czech)
    0 references
    A complex reconstruction of the apartment building, consisting of particular of the insulation of the perimeter of the building envelope of the building envelope, as part of the measures connected to the fitting-out of the inner coat of arms by the renovation of the lower part of the house in direct connection with the dissection of the house in a straight line. Structures (English)
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0001626
    0 references