Thermal modernisation, reconstruction and overbuilding of the existing workshop building and economic building of the Municipality of White (Q137626): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 49,642.2864 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 49,642.2864 Euro / rank | |||||||||||||||
Property / EU contribution: 49,642.2864 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 49,642.2864 Euro / qualifier | |||||||||||||||
|
Revision as of 14:38, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation, reconstruction and overbuilding of the existing workshop building and economic building of the Municipality of White |
Project in Poland financed by DG Regio |
Statements
206,842.86 zloty
0 references
243,344.56 zloty
0 references
85.0 percent
0 references
1 December 2018
0 references
30 November 2019
0 references
GMINA BIESIEKIERZ
0 references
Projekt polega na kompletnej modernizacji energetycznej istniejącego obiektu warsztatowo – garażowego Gminy Biesiekierz w miejscowości Biesiekierz. Budynek warsztatowy i gospodarczy Gminy Biesiekierz jest obiektem jednokondygnacyjnym, niepodpiwniczonym, postawionym w konstrukcji murowanej o powierzchni użytkowej 393,30 m2, z której aż 303,9 m2 zajmuje garaż użytkowany przez Gminne Służby Techniczne. Pierwotnie obiekt ten miał pełnić funkcję remizy strażackiej, jednakże ze względu na wystarczającą ilość budynków o tym przeznaczeniu w gminie (W gminie występują cztery Ochotnicze Straże Pożarne, w tym trzy posiadają remizy. Jedna nie posiada na wyposażeniu pojazdu, w związku z czym nie występuje potrzeba). Wykonane będą roboty budowlane, w tym: Roboty rozbiórkowe; Podłoża betonowe i izolacje posadzek; Stolarka i ślusarka drzwiowa i okienna; Posadzki; Elewacje – docieplenia, Roboty elektryczne: Instalacja oświetleniowa; Instalacja odgromowa; Badania i pomiary elektryczne + demontaże, Roboty sanitarne i c.o.: Instalacja wody zimnej - pomieszczenie gospodarcze, Instalacja wody zimnej i ciepłej - pomieszczenie socjalne, Instalacja centralnego ogrzewania. Projekt jest w pełni gotowy do realizacji- posiada niezbędna dokumentację do ogłoszenia przetargu na roboty budowlane. (Polish)
0 references
The project consists of a complete energy modernisation of an existing workshop facility, a garage of the municipality of Biesiekiel in the town of Bieisiel. The workshop building and the economic building of the Municipality of White is a single-storey construction, which is not podpiwek, placed in a masonry structure with a usable surface of 393.30 m², of which as many as 303.9 m² occupy garages operated by the Gminne Technical Services. This facility was originally intended to serve as a firefighter of firefighters, however, due to a sufficient number of buildings to be used in the municipality (there are four Voluntary Fire Centres in the municipality, including three of them. One is not equipped with the vehicle and there is no need for it). Construction work will be carried out, including: Demolition works; Concrete flooring and insulation floors; Doors and shutters; Floor floors; Façade insulation, electrical works: Lighting installation; Lightning protection system; Tests and measurements to be carried out on electrical measurements and measurements: Cold water installation — economic room, installation of cold and cold water — a social room, district heating system. The project is fully operational, with the necessary documentation for the call for tender for construction works. (English)
0 references
Identifiers
RPZP.02.05.00-32-A061/16
0 references