(15988.27102017.119000058) LINS_AMB (Q2059102): Difference between revisions
Jump to navigation
Jump to search
(Created claim: intervention field (P888): Generic productive investment in small and medium–sized enterprises (‘SMEs’) (Q200641), Adding CoI) |
(Created claim: intervention field (P888): Energy efficiency and demonstration projects in SMEs and supporting measures (Q200708), Adding CoI) |
||
Property / intervention field | |||
Property / intervention field: Energy efficiency and demonstration projects in SMEs and supporting measures / rank | |||
Normal rank |
Revision as of 14:36, 24 September 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (15988.27102017.119000058) LINS_AMB |
Project in Italy financed by DG Regio |
Statements
74,110.76 Euro
0 references
148,221.51 Euro
0 references
50.0 percent
0 references
28 February 2018
0 references
29 February 2020
0 references
29 February 2020
0 references
LINSIEME - FILATI - S.R.L.
0 references
SONO PREVISTI 2 INTERVENTI: 1A) SOSTITUZIONE DELLA COPERTURA DELL?INTERO FABBRICATO CON ALTRA AVENTE VALORI DI TRASMITTANZA MIGLIORI, COMPOSTA DA STRUTTURA PORTANTE METALLICA CON ALL?INTRADOSSO TERMOPANNELLI DI LAMIERA E POLIURETANO CON SOVRASTANTE STRATO DI LANA DI VETRO E. ALL?ESTRADOSSO, LASTRA GRECATA IN ALLUMINIO NATURALE CON ISOLANTE POLIURETANICO. 5B) REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO DA CIRCA 122 KWP COLLEGATO ALLA RETE D?UTENZA AZIENDALE PER AUTOCONSUMO. L?ENERGIA PRODOTTA DALL?IMPIANTO SARA PARI A CIRCA 142.000 KWH/ANNO, INFERIORE A QUELLA COMPLESSIVA NECESSARIA AL FABBRICATO ED ALLE LAVORAZIONI SVOLTE AL SUO INTERNO.L'INTERVENTO 5A) PRECEDENTEMENTE INDICATO NON VIENE PIU' RICHIESTO (Italian)
0 references
THERE WILL BE 2 INTERVENTIONS: 1A) REPLACING THE COVER OF THE WHOLE BUILDING WITH ANOTHER OF BETTER TRANSMITTANCE VALUES, MADE UP OF A METAL-BEARING CARRIER STRUCTURE WITH ALL LAYERS OF METAL WOOL WITH ALL OF THE ABOVE LAYERS OF E GLASS WOOL, TO THE POINT OF DEPARTURE, PLATE OF NATURAL ALUMINIUM WITH POLYURETHANE INSULATOR. 5 (B) INSTALLATION OF PHOTOVOLTAIC FACILITIES OF ABOUT 122 KWP CONNECTED TO THE NETWORK D? BUSINESS USERS FOR OWN CONSUMPTION. THE ENERGY PRODUCED BY THE PLANT WILL BE APPROXIMATELY 142.000 KWH/YEAR, LESS THAN THE TOTAL AMOUNT NEEDED FOR THE BUILDING AND PROCESSING CARRIED OUT FOR ITS INTERNO.MEASURE 5A) MENTIONED ABOVE IS NO LONGER REQUIRED. (English)
0 references
Identifiers
G39J17000810009
0 references