(10360.14072017.115000205) (Q2057089): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
Property / intervention field
 
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank
 
Normal rank

Revision as of 14:35, 24 September 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000205)
Project in Italy financed by DG Regio

    Statements

    0 references
    582,186.91 Euro
    0 references
    1,455,467.28 Euro
    0 references
    40.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PONTE BUGGIANESE
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    I LAVORI IN OGGETTO INTERESSANO L'EFFICIENTAMENTO ENERGETICO DELLA SCUOLA PRIMARIA RODARI, SCUOLA SECONDARIA DI PRIMO GRADO PADRE CECCHI, FACENTI PARTE DELL?ISTITUTO COMPRENSIVO DON MILANI, IN VIA TOSCANINI 11. IL PLESSO COMPRENDE DUE EDIFICI SCOLASTICI, COSTRUITI IN EPOCHE DIVERSE, UNA PALESTRA ED UNA BIBLIOTECA DI RECENTE COSTRUZIONE, CON AL PIANO PRIMO DELLA MEDESIMA LE AULE DELLA SCUOLA ELEMENTARE.L?INTERVENTO DI ISOLAMENTO TERMICO DELLE STRUTTURE RIGUARDA LA COPERTURA DELL?EDIFICIO DESTINATO A SCUOLA SECONDARIA DI PRIMO GRADO PADRE CECCHI. TALE INTERVENTO ? NECESSARIO VISTA LA PRECARIET? DELLA STRUTTURA, RISCONTRATA ANCHE NELLA SCUOLA PRIMARIA G. RODARI, DOVE CI SONO ALCUNI DISTACCAMENTI DELL?INTONACO DELL?INTRADOSSO. SI PREVEDE LA RIMOZIONE DELL?ATTUALE COPERTURA E DEL MANTO DI IMPERMEABILIZZAZIONE, IL LORO RIFACIMENTO, LA POSA DI CANALI E SCOSSALINE, LA TINTEGGIATURA DELL?INTRADOSSO. L?ISOLANTE TERMICO SARA` EPS 14 CM TIPO STIFERITE GT.L?INTERVENTO DI SOSTITUZIONE DEGLI INFISSI (Italian)
    0 references
    THIS WORK RELATES TO THE ENERGY EFFICIENCY OF THE PRIMARY SCHOOL RODARI, SECONDARY SCHOOL AT FIRST INSTANCE, THE FATHER CECCHI, WHICH IS PART OF THE INSTITUTE COMPRISING DON MILANI, IN VIA TOSCANINI 11. THE PLAN COMPRISES TWO SCHOOL BUILDINGS, BUILT IN VARIOUS TIMES, A GYM AND A NEWLY BUILT LIBRARY, WITH THE FIRST FLOOR OF THE SCHOOL, THE CLASSROOMS OF THE ELEAMENTARE.L? INTERVENTION OF THERMAL INSULATION OF THE STRUCTURES CONCERNS THE COVER OF THE FIRST SECONDARY SCHOOL BUILDING, THE FATHER CECCHI. DO YOU REALLY WANT TO DO THIS? IS IT NECESSARY IN VIEW OF THE PRESCARET? OF THE STRUCTURE, ALSO FOUND IN THE PRIMARY SCHOOL G. RODARI, WHERE THERE ARE SOME SECONDMENTS OF THE RENDERING? INTRADOSO. THE REMOVAL OF THE CURRENT COVER AND THE SURFACE OF THE WATERPROOFING, THE RESTORATION OF THE CHANNELS AND THE SALTPANS, THE PAINTING OF THE INTRADOSO IS EXPECTED TO BE REMOVED. THE THERMAL INSULATION WILL BE EPS 14 CM (English)
    0 references

    Identifiers