Property / intervention field
 
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank
 
Normal rank

Revision as of 14:34, 24 September 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000154) ENERGIFROUND
Project in Italy financed by DG Regio

    Statements

    0 references
    237,723.55 Euro
    0 references
    609,547.55 Euro
    0 references
    39.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CARRARA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    L'INTERVENTO CONSISTE IN : ISOLAMENTO TERMICO DELLE PARETI OPACHE VERTICALI OVVERO LE MURA. QUESTO TIPO DI INTERVENTO CONSENTE, OLTRE AD ADEGUARE LA TRASMITTANZA TERMICA DELLE PARETI AI LIMITI DI LEGGE PREVISTI AL 2021, ANCHE DI ELIMINARE I PONTI TERMICI PRESENTI;ISOLAMENTO DELLA COPERTURA PIANA, PREVIA RIMOZIONE DI GUAINA BITUMINOSA, VERIFICA DEL SOTTOFONDO, POSA IN OPERA DI ISOLANTE DELLA STESSA TIPOLOGIA DEL CAPPOTTO, COPERTURA CON MASSETTO ALLEGGERITO A PROTEZIONE DEL'ISOLANTE E PER L'AUMENTO DELLA MASSA VOLUMICA PER LO SFASAMENTO TERMICO, IMPERMEABILIZZAZIONE DI GUAINA LIQUIDA APPOSITA PER IMPERMEABILIZZAZIONE DELLE SUPERFICI PIANE; SOSTITUZIONE DI FINESTRE E PORTEFINESTRE IN ALLUMINIO, CON PROFILATI A TAGLIO TERMICO, COMPRENSIVI DI VETROCAMERA SIGILLATA TRAMITE GUARNIZIONI IN GOMMA, SENZA USO DI SILICONE, PROFILI FERMAVETRO AD INCASTRO, CON TRASMITTANZA TERMICA MINIMA PREVISTA DALLA NORMATIVA VIGENTE PER LA ZONA CLIMATICA D.CENTRALE TERMICA: IL RIFACIMENTO DELLA CENTRALE TER (Italian)
    0 references
    THE INTERVENTION CONSISTS OF: THERMAL INSULATION OF VERTICAL OPAQUE WALLS OR WALLS. THIS TYPE OF INTERVENTION ALLOWS, IN ADDITION TO ADJUSTING THE THERMAL TRANSMITTANCE OF THE WALLS TO THE LEGAL LIMITS LAID DOWN IN 2021, ALSO TO ELIMINATE THE THERMAL BRIDGES PRESENT; THE INSULATION OF FLAT COVER, AFTER REMOVAL OF A BITUMINOUS SHEATH, VERIFICATION OF THE SUB-BASE, THE INSULATION OF THE SAME TYPE AS THE JACKET, THE INSULATION OF THE SAME TYPE AS THE JACKET, AND THE INCREASE IN THE DENSITY DENSITY FOR THE THERMAL PROCESS; REPLACEMENT OF WINDOWS AND PORTEWINDOWS MADE OF ALUMINIUM, WITH HEAT CUT SECTIONS INCLUDING RUBBER SEALED WITH RUBBER, WITHOUT THE USE OF SILICONE, AND WITH RECESSED STOP PROFILES, WITH A MINIMUM THERMAL TRANSMITTANCE SET OUT IN THE REGULATIONS IN FORCE FOR THE THERMAL CENTRAL HEATING ZONE: THE REBUILDING OF THE POWER PLANT (English)