Energy efficiency improvement (Q134680): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 406,153.8456 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 406,153.8456 Euro / rank | |||||||||||||||
Property / EU contribution: 406,153.8456 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 406,153.8456 Euro / qualifier | |||||||||||||||
|
Revision as of 13:58, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency improvement |
Project in Poland financed by DG Regio |
Statements
1,692,307.69 zloty
0 references
3,076,923.09 zloty
0 references
55.0 percent
0 references
14 September 2018
0 references
26 April 2019
0 references
POJ-KON IMPORT EXPORT MICHAŁOWSKA MARIA MICHAŁOWSKI PIOTR SPÓŁKA JAWNA
0 references
Wnioskodawca jest liderem wśród producentów pojazdów konnych w województwie Wielkopolskim. Projekt ten będzie odnosił się bezpośrednio do głównej działalności Wnioskodawcy. Projekt będzie dotyczył zatem modernizacji procesu produkcji powozów konnych (modyfikacje procesu produkcji pod kątem efektywności energetycznej (a)) oraz termomodernizacji budynku, gdzie ta produkcja się odbywa (b) - kompleksowe modernizacje energochłonnych obiektów działalności przedsiębiorstwModyfikacja obecnego, przestarzałego procesu technologicznego, który odbywa się przy użyciu frezarek oraz wiertarek ręcznych w postaci wymiany tych maszyn na nowoczesną wycinarkę laserową spowoduje znaczne skrócenie czasu produkcji. Wysoka jakość wykonania elementów oraz duża powtarzalność produkcji ma istotny wpływ na prace wykonywane w kolejnych etapach produkcji – spawanie oraz szpachlowanie. Dzięki proponowanej modyfikacji procesu produkcji, która będzie wynikiem zakupu wycinarki laserowej, nastąpi nie tylko przyspieszenie i zmniejszenie zakresu prac na etapie 1, ale także zredukowanie prac spawalniczych oraz szpachlarskich (kolejne etapy produkcji), co doprowadzi to ograniczenia pracy maszyn używanych w tych etapach. Krok ten doprowadzi również do ograniczenia zużycia narzędzi takich jak: wiertła, frezy, wykrojniki, pasy cierne, piły taśmowe oraz konieczności korzystania z podwykonawców.W ramach termomodernizacji budynków Wnioskodawca zamierza zmniejszyć straty przez przenikanie przez ściany zewnętrzne - ocieplenie ścian styropianem. Zmniejszyć straty przez przenikanie przez przegrody - wymiana dwóch bram garażowych. Zmniejszyć straty na podgrzewanie ciepłej wody użytkowej oraz wytwarzanie c.w.u. z pompy ciepła. Podwyższyć sprawności instalacji c.o. Wymienić źródła ciepła wraz z technologią kotłowni. zaizolować przewody.Modernizacja procesu produkcji oraz termomodernizacja budynków firmowych zredukuje emisję dwutlenku węgla. W ramach realizacji projektu oszczędność energii wyniesie powyżej 60%. (Polish)
0 references
The applicant is the leader of the automobile manufacturers in Wielkopolskie Province. The project will refer directly to the applicant’s main business. The project will therefore concern the modernisation of the production process of horse races (modifications to the production process for energy efficiency (a)) and the thermal modernisation of the building, where this production takes place (b), the complex modernisation of the energy-intensive business of business enterprises, the modification of the current, obsolete technological process, which takes place using milling machines and hand-held machines, in the form of replacement of these machines by a modern laser cutting machine, will significantly reduce the production time. The high quality of the performance of the components and the high level of repeatability in production has a significant impact on the works carried out in the following stages of production — welding and the bearing. The proposed modification of the production process, which will result from the purchase of a laser cutting device, will not only accelerate and reduce the scope of the work in step 1, but also reduce welding works and the twine (successive stages of production), thereby reducing the work of the machines used in these stages. This step will also reduce the use of tools such as: drills, milling, shearing belts, friction belts, band saws and the need to use subcontracting. as part of the thermal renovation of buildings, the applicant intends to reduce the loss through external walls — insulation of the styropine wall. Reduce the loss through the partitioning system — exchange of two garage doors. Reduce losses in the heating of domestic hot water and the production of hot water from the heat pump. Increase the efficiency of the heating system. extract the heat source together with the boiler technology. isolate the installation of the production process and the thermal renovation of the company buildings will reduce the carbon emissions. As part of the project, energy savings will be above 60 %. (English)
0 references
Identifiers
RPWP.01.05.03-30-0033/17
0 references