Construction of the sanitary sewerage network in Koniecfield ul. Slovak (Q124256): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 98,280.8688 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 98,280.8688 Euro / rank | |||||||||||||||
Property / EU contribution: 98,280.8688 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 98,280.8688 Euro / qualifier | |||||||||||||||
|
Revision as of 11:59, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the sanitary sewerage network in Koniecfield ul. Slovak |
Project in Poland financed by DG Regio |
Statements
409,503.62 zloty
0 references
481,882.36 zloty
0 references
84.98 percent
0 references
26 April 2017
0 references
5 May 2017
0 references
GMINA KONIECPOL
0 references
Projekt polega na budowie sieci kanalizacji sanitarnej grawitacyjnej, tłocznej, przyłączy kanalizacji sanitarnej oraz przepompowni ścieków - 2 kpl. Dokumentacja techniczna i decyzje dotyczą szerszego zakresu inwestycji. Przedmiotowa inwestycja wykonana zostanie tylko dla ul. Słowackiego w Koniecpolu. Celem projektu jest zwiększony odsetek ludności gminy Koniecpol korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych poprzez rozwój systemu kanalizacji sanitarnej w gminie Koniecpol. W wyniku realizacji przedsięwzięcia zwiększy się liczba osób korzystających z systemu kanalizacji. Docelowo nasta?pi ograniczenie presji na s´rodowisko naturalne poprzez zmniejszenie ilos´ci s´cieko´w nieoczyszczonych wprowadzanych do środowiska, a takz˙e zwie?kszenie odsetka oczyszczonych s´cieko´w komunalnych. (Polish)
0 references
The project consists of the construction of a gravitational sewage system, compressor stations, sanitary sewerage connections and sewage pumping stations — 2 kpl. The technical documentation and decisions concern a wider range of investments. The investment in question will be carried out only at ul. Slovak in Koniecfield. The aim of the project is to increase the percentage of the population of Koniecpol benefiting from a wastewater treatment system compliant with the Urban Waste Water Directive through the development of a sewage system in the municipality of Koniecpol. As a result of the project, there will be an increase in the number of people using the sewerage system. The objective of the PI is to reduce the pressure on s’ natural environment by reducing the ratio of the number of those seconds’ in the raw material entering the environment, and the reduction of the percentage of the percentage of purified s’ in the urban area. (English)
0 references
Identifiers
RPSL.05.01.02-24-0794/16
0 references