Deep energy renovation of public buildings district of Strzyżów (Q118732): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 482,018.1144 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
482,018.11 Euro
| |||||||||||||||
Property / EU contribution: 482,018.11 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 482,018.11 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 482,018.11 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 11:12, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Deep energy renovation of public buildings district of Strzyżów |
Project in Poland financed by DG Regio |
Statements
2,008,408.81 zloty
0 references
2,362,833.95 zloty
0 references
85.0 percent
0 references
10 March 2016
0 references
31 October 2018
0 references
POWIAT STRZYŻOWSKI
0 references
Projekt dotyczy modernizacji energetycznej dwóch budynków użyteczności publicznej zlokalizowanych w Strzyżowie przy ul. Parkowej 7 na dz. ewid.nr 818/6, 818/8, 821/2, 822/1, 829/16, 829/6 oraz w Dobrzechowie na dz. ewid. nr 1190/35 i 1190/36. 1. W budynku w Strzyżowie zaplanowano: - wymianę instalacji c.o. oraz kotłów olejowych o mocach 140 kW każdy, na moduł gazowy kogeneracyjny o mocy termicznej 15kW i mocy elektrycznej do 6kW wraz z dwoma kotłami gazowymi kondensacyjnymi z zamkniętą komorą spalania o mocy 63 kW każdy, pompa ciepła powietrze – powietrze dla potrzeb instalacji wentylacji mechanicznej oraz instalacja fotowoltaiczna o mocy 28 kWp umieszczona na dachu wraz z przystosowaniem instalacji elektrycznej budynku do zasilania urządzeń, w celu zapewnienia źródła odnawialnej energii dla zasilania pompy ciepła, system inteligentnego zarządzania ogrzewaniem, - system przygotowania cieplej wody użytkowej (zasobnik cwu ogrzewany z kotłowni gazowej), - ocieplenia ścian, fundamentów, stropodachów; - wymiany stolarki okiennej i drzwiowej. 2. W budynku w Dobrzechowie zaplanowano: - wymianę instalacji c.o. oraz kotła węglowego na kocioł gazowy kondensacyjny z zamkniętą komorą spalania o mocy 63kW, system inteligentnego zarządzania ogrzewaniem wraz z przystosowaniem instalacji elektrycznej; - ocieplenia ścian, fundamentów, stropodachów; - wymiany stolarki okiennej i drzwiowej. Realizacja inwestycji pozwoli na uzyskanie: a) w budynku przy ul. Parkowa 7 w Strzyżowie wskaźnika EP na poziomie 166,61 [kWh/(m2 · rok)] (dane ze Świadectwa energetycznego - po termomodernizacji str. 3) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 83,61 % (dane z Audytu energetycznego str. 4). b) w budynku w Dobrzechowie uzyskać wskaźnik EP na poziomie 189,42 [kWh/(m2 · rok)] (dane ze Świadectwa energetycznego - po termomodernizacji str. 3) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 90,09 % (dane z Audytu energetycznego str. 4). (Polish)
0 references
The project concerns the energy upgrade of two public buildings located in Strzyżów at ul. Parkowa 7, ref. no 818/6, 818/8, 821/2, 822/1, 829/16, 829/6, and in Dobrzechines nos. no 1190/35 and 1190/36. 1. The building in Strzyżów is planned to: — replacement of fuel boilers with a capacity of 140 kW each, on a cogeneration gas module with a thermal power of 15 kW and an electrical capacity of up to 6 kW with two condensing gas boilers with a closed combustion chamber with a power of 63 kW, each, a heat pump for mechanical ventilation systems and a 28 kWp photovoltaic installation on the roof, with an adaptation of the electrical installation of the building to supply the equipment, to provide a source of renewable energy for the heat pump, a smart heating management system, a system for preparing hot water for use in the heating system, warming of walls, foundations, floor space; — the replacement of window and door frames. 2. The building in Dobrzechów is planned to: — the replacement of a boiler heater and a carbon boiler on a condenser gas condensing boiler with a closed combustion chamber of 63 kW, a smart heating management system with an adaptation of the electrical installation; Warming of walls, foundations, tuning; — the replacement of window and door frames. The implementation of the investment will enable the following to be achieved: (a) in the building at ul. Part 7 in Strzyżów of the indicator EP at level 166,61 [kWh/(m²· year)] (data from the energy certificate — after thermal modernisation on str. 3) and a reduction in demand for energy consumption by 83.61 % (energy audit data on pages). (4). (b) In the Dobrzechów building, score EP at level 189,42 [kWh/(m²· year)] (data from the energy certificate — after thermal modernisation on page. 3) and a reduction in demand for energy consumption by 90.09 % (energy audit data on pages). EUR 4). (English)
0 references
Identifiers
RPPK.03.02.00-18-0106/16
0 references