Installation of renewable energy sources in public buildings in the Radical community. (Q118512): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 340,311.77999999997 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
340,311.78 Euro
| |||||||||||||||
Property / EU contribution: 340,311.78 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 340,311.78 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 340,311.78 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 10:48, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of renewable energy sources in public buildings in the Radical community. |
Project in Poland financed by DG Regio |
Statements
1,417,965.75 zloty
0 references
1,668,195.0 zloty
0 references
85.0 percent
0 references
20 May 2017
0 references
30 September 2019
0 references
GMINA RADYMNO
0 references
Celem realizacji proj. jest zwiększenie ilości energii pozyskiwanej z OZE, poprawa jakości i ochrony środowiska, zwiększenie efektywności wykorzystania biomasy, energii słonecznej, energii geotermalnej, zmniejszenie emisji gazów cieplarnianych do atmosfery. Projekt dot.:a) wymiany starych olejowych dwóch kotłowni (Zespół Szkół w Duńkowicach oraz Zespół Szkół w Nienowicach) na nowe kotłownie biomasowe. Moc: 251 kW (Duńkwice), 251 kW (Nienowice). Łączna moc: 502 kWb) Instalacja PV o łącznej mocy 91,12 kWp na 10 budynkach użyt. publ. (Zespół Szkół w Duńkowicach: 20x340 Wp=6,8 kWp, Zespół Szkół w Nienowicach: 12 x 340=4,08 kWp, Zespół Szkół w Chotyńcu: 80x340=27,20 kWp; Zespół Szkół w Korczowej: 70 x 340=23,8 kWp; Remizo-Świetlica w Duńkowicach: 16x340Wp=5,44kWp; Remizo-Świetlica w Nienowicach: 20x340Wp=6,8 kWp; Remizo-Świetlica w Chotyńcu: 12 x340 Wp=4,08 kWp; Remizo-Świetlica w Korczowej: 18x340Wp=6,12 kWp; Świetlica w Grabowcu: 12 x 340 Wp=4,08 kWp; Świetlica w Piaskach: 8x340 Wp=2,72 kWp. c) Instalacja pieców akumulacyjnych dla 5 budynków użyt. publ. (Remizo-Świetlica w Duńkowicach: 6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230; R-Ś w Nienowicach:6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, R-Ś w Chotyńcu: 8xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, R-Ś w Korczowej: 8xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, S w Piaskach: 6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230d) Instalacja pomp ciepła dla 2 bud. użyt.publ (Zespół Szkół w Chotyńcu: 2 xPC AW 36,7 kW (A2W35), Zespół Szkół w Korczowej: 1PC AW 67,6 kW (A2W35)Celem proj. jest: 1. Poprawa jakości powietrza w gminie poprzez ograniczenie emisji CO2 o 155,32 Mg CO22. Zwiększenie poziomu produkcji energii z OZE (energii elektrycznej: 0,82 MWhe/rok, energii cieplnej: 492,68 MWht/rok)3. Zwiększenie ilości budynków użyteczności pub. korzystających z odnawialnych źródeł energii poprzez montaż zestawów urządzeń OZE (10 budynków użyteczności pub.)Obiekty na których będą montowane OZE pokryte są blachą. (Polish)
0 references
The objective is to increase the amount of energy from renewable sources, to improve the quality and protection of the environment, to increase the efficiency of the use of biomass, solar energy, geothermal energy, to reduce greenhouse gas emissions. Project concerning (a) the replacement of old oil oils with two boiler houses (the School Complex in Duńkowice and the School Complex in Nienowice) for new biomass boilers. Capacity: 251 kW (Danish flower), 251 kW (dienowice). Total power: 502 NSA) An installation of PV with a total capacity of 91,12 kWp per 10 buildings used in publ. (school assembly in Duńkowicach: 20x340 Wp = 6,8 kWp, School assembly in Vienowice: 12 x 340 = 4,08 kWp, panel of the School in Choytowa: 80x340 = 27,20 kWp; The Korczowa School Complex: 70 x 340 = 23,8 kWp; In Duńkowice: 16x340Wp = 5,44kWp; Liemizo-Sendero in Sienowice: 20x340Wp = 6,8 kWp; Remozoic in Choticów: 12 x 340 Wp = 4,08 kWp; Roots in Korczowa: 18x340Wp = 6,12 kWp; On the scene in Grabovwiec: 12 x 340 Wp = 4,08 kWp; In Piaski: 8x340 Wp = 2,72 kWp (c) Installation of the storage furnaces for the 5 buildings used. Remizo-Sendero in Duńkowice: 6xDOA 20/E with a power output of 2 kW and power distribution 3/N/PE 230; R-Ś in Vienowice: 6xDOA 20/E of 2 kW power and power supply 3/N/PE 230, R-Ś in Choticec: 8xDOA 20/E of 2 kW power and 3/N power/PE 230, R-Ś in Korczowa: 8xDOA 20/E of 2 kW power and 3/N/PE 230, S in Piaski: 6xDOA 20/E of 2 kW and Power Power 3/N/PE 230d) Heat pumps installation for 2 construction works. 2 XU AW 36.7 kW (A2W35), Korczowa School Complex: 1PC AW 67.6 kW (A2W35) In order to: 1. Improve the quality of air in the municipality by reducing CO2 emissions by 155,32 Mg CO22. Increasing the level of production of energy from RES (electricity: 0,82 MWth, thermal energy: 492,68 MWHT/year) 3. Increasing the volume of public buildings using renewable energy sources by assembling sets of RES equipment (10 utility buildings). (English)
0 references
Identifiers
RPPK.03.01.00-18-0096/17
0 references