Construction of a photovoltaic farm with the necessary infrastructure in Izdebki (Q118536): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 166,380.4296 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 166,380.4296 Euro / rank | |||||||||||||||
Property / EU contribution: 166,380.4296 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 166,380.4296 Euro / qualifier | |||||||||||||||
|
Revision as of 10:45, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic farm with the necessary infrastructure in Izdebki |
Project in Poland financed by DG Regio |
Statements
693,251.79 zloty
0 references
815,590.35 zloty
0 references
85.0 percent
0 references
1 January 2018
0 references
31 December 2020
0 references
PARK ENERGII SŁONECZNEJ PARAFII RZYMSKOKATOLICKIEJ ZWIASTOWANIA PAŃSKIEGO W IZDEBKACH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Celem realizacji projektu jest zwiększanie ilości energii pozyskiwanej ze źródeł odnawialnych, a w efekcie poprawa jakości i ochrony środowiska, zmniejszanie emisji gazów cieplarnianych do atmosfery. Projekt dotyczy budowy farmy fotowoltaicznej wraz z niezbędną infrastrukturą w miejscowości Izdebki. Podstawowe parametry instalacji fotowoltaicznej: 1. Moc-199,68kW 2. Ilość energii wyprodukowanej -179,71kWhe/rok 3. Szacowany roczny spadek emisji CO2-148,26 Mg/rok Budowa farmy fotowoltaicznej polegać będzie na montażu i instalacji następujących elementów: -stelażu pod panele fotowoltaiczne-768 paneli słonecznych o mocy jednostkowej 260Wp i łącznej mocy 199,68kW-6 szt. falowników(inwerterów) o mocy 30kW-prąd stały (DC-direct current), prąd przemienny (AC-alternating current),-stacji transformatorowej monitorowanej na słupie o mocy 250kVA,- kabli stałoprądowych od paneli do falowników,-kabli zmiennoprądowych od falowników do transformatora,-kabla od transformatora do sieci średniego napięcia( przyłącz średniego napięcia),-szaf rozdzielczych niskiego i średniego napięcia,-urządzeń zabezpieczających i pomiarowych,- instalacja do monitoringu,-instalacja oświetleniowa. (Polish)
0 references
The project aims at increasing the amount of energy from renewable sources and, as a result, improving the quality and protection of the environment, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Izdebki. Basic parameters of the photovoltaic installation: 1. Moc-199.68 kW 2. The amount of energy produced -179,71kWhe/year 3. The estimated annual drop in CO2-148,26 Mg/year Construction of the PV farm will consist of the installation and installation of the following elements: A set of solar panels under 768Wp panels and 260 kW-6 solar panels with a combined capacity of 199,68Wp and a total power of kW- inverters (inverters) with a power of 30 kW-DC (DC-direct current), alternating current (AC-alpha current), -transformer station monitored on the power line 250kVA, -DC power cables from inverters and -cable transformer station to medium voltage network (mean voltage link), low and medium voltage distribution cabinets, and safety and measuring equipment, — monitoring installation, installation of lighting. (English)
0 references
Identifiers
RPPK.03.01.00-18-0227/17
0 references