Reconstruction and renovation of the old part of the school building at ul. 22 in Mońki (Q117026): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 260,000.7288 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
260,000.73 Euro
| |||||||||||||||
Property / EU contribution: 260,000.73 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 260,000.73 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 260,000.73 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 10:42, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and renovation of the old part of the school building at ul. 22 in Mońki |
Project in Poland financed by DG Regio |
Statements
1,083,336.37 zloty
0 references
1,274,513.39 zloty
0 references
85.0 percent
0 references
22 July 2019
0 references
31 December 2020
0 references
POWIAT MONIECKI
0 references
Przedmiotem projektu jest termomodernizacja budynku starej szkoły w Mońkach przy ul. Szkolnej 22. Celem projektu jest poprawa efektywności energetycznej w budynku starej szkoły w Mońkach.Zakres projektu obejmuje termomodernizację budynku części starej szkoły w Mońkach poprzez docieplenie ścian zewnętrznych, wymiana okien i drzwi, docieplenie stropu nad parterem, docieplenie podłogi na gruncie, modernizacja c.o oraz oświetlenia. Dzięki realizacji projektu będzie możliwe zmniejszenie emisji gazów cieplarnianych i innych zanieczyszczeń do atmosfery, redukcja kosztów ogrzewania pozwoli na obniżenie kosztów funkcjonowania instytucji publicznych oraz zwiększenia oszczędności energii w budynku użyteczności publicznej. Grupą docelową w szczególności będą uczniowie i pracownicy szkoły w Mońkach i użytkownicy obiektu, najczęściej korzystający z budynku użyteczności publicznej. Do grupy pośrednich beneficjentów należy także zaliczyć całą społeczność lokalną, która będzie mogła korzystać z obiektu. Realizacja projektu pozwoli na osiągnięcie następujących wskaźników: a)na poziomie produktu: -Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych o 157 780,778 kWh/rok -Szacowany roczny spadek emisji gazów cieplarnianych o 38,839 ton równoważnika CO2,, -Liczba zmodernizowanych energetycznie budynków 1 szt., -Powierzchnia użytkowa budynków poddanych termomodernizacji 316,70 m2, b)na poziomie rezultatu: -Ilość zaoszczędzonej energii elektrycznej 8,176 MWh/rok, -Ilość zaoszczędzonej energii cieplnej 436,10 GJ/rok. Termin realizacji projektu przewidziano od 01.07.2019 r. do 31.12.2020 r. (Polish)
0 references
The project is a thermal renovation of the old school in Mońki Street at ul. School 22. The aim of the project is to improve the energy efficiency of the old school building in Mońces.Scope of the project involves the thermal modernisation of the part of the old school in Mońki by insulation of the outer walls, replacement of windows and doors, insulation of floor over the floor, insulation of the floor on the ground, heating modernisation and lighting. By implementing the project, it will be possible to reduce greenhouse gas emissions and other atmospheric pollutants, reduce heating costs, reduce the cost of running public institutions and increase energy savings in the public building. The target group will in particular be the pupils and staff of the school in the Mońki and the users of the facility, most likely to use the public building. The group of indirect beneficiaries should also include the whole local community, which will be able to benefit from the facility. The implementation of the project will enable the following indicators to be achieved: at product level: — Reduction of annual primary energy consumption in public buildings by 157 780,778 tonnes of CO38,839 equivalent, -Number of energy modernised buildings of 1 tonnes of CO2 equivalent, -Number of energy modernised buildings, -useable area of buildings subject to thermal modernisation of 316.70 m², (b) at result level: — Electricity saved amount of electricity of 8.176 MWh/year — -Amount of saved heat 436,10 GJ/year. The project is scheduled to run from 01.07.2019 to 31.12.2020. (English)
0 references
Identifiers
RPPD.05.03.01-20-0159/18
0 references