Thermal modernisation of public buildings located in the towns of Płock — Bragamura and Płock — Cologne (Q109057): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 217,943.06639999998 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 217,943.06639999998 Euro / rank | |||||||||||||||
Property / EU contribution: 217,943.06639999998 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 217,943.06639999998 Euro / qualifier | |||||||||||||||
|
Revision as of 07:16, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings located in the towns of Płock — Bragamura and Płock — Cologne |
Project in Poland financed by DG Regio |
Statements
908,096.11 zloty
0 references
1,135,120.14 zloty
0 references
80.0 percent
0 references
1 December 2015
0 references
30 December 2017
0 references
GMINA PŁONIAWY-BRAMURA
0 references
Projekt zakłada termomodernizację budynków położonych w miejscowościach Płoniawy-Bramura i Płoniawy-Kolonia, znajdujących się na terenie gminy wiejskiej Płoniawy-Bramura. Budynki objęte niniejszym projektem to Szkoła Podstawowa w Płoniawach-Bramurze i Przedszkole w Płoniawach-Bramurze. Głównym problemem w projekcie jest niska efektywność energetyczna budynków oraz niski standard cieplny i obniżona funkcjonalność. Zakres planowanych prac podyktowany jest następującymi potrzebami: ocieplenia ścian, podłóg, stropodachów i stropów, wymiany stolarki drzwiowej, modernizacji instalacji grzewczej oraz instalacji przygotowania ciepłej wody użytkowej, modernizacji instalacji oświetleniowej, zwiększenie udziału odnawialnych źródeł energii w bilansie energetycznym, poprawy estetyki budynków, ograniczenie emisji zanieczyszczeń do powietrza atmosferycznego. W związku z powyższym, obecny stan techniczny wymaga podjęcia działań termomodernizacyjnych. Zakres projektu będzie kompleksową odpowiedzią na zidentyfikowane potrzeby i problemy. Przedmiotem projektu jest: ocieplenie ścian zewnętrznych i fundamentowych oraz ścian piwnicy, ocieplenie stropodachów i stropów, ocieplenie podłóg, wymiana drzwi zewnętrznych, montaż zaworów podpionowych i zaworów termostatycznych oraz liczników ciepła, instalacje kolektorów słonecznych do przygotowywania ciepłej wody użytkowej wraz z montażem liczników, wymiana oświetlenia na energooszczędne, montaż paneli fotowoltaicznych. Beneficjentem końcowym projektu jest Gmina Płoniawy-Bramura, a beneficjentem ostatecznym są wszyscy mieszkańcy Gminy, a także pracownicy i użytkownicy budynków. Głównym celem projektu jest poprawa jego efektywności energetycznej oraz wykorzystanie odnawialnych źródeł energii. Za poszczególne etapy projektu, tj. złożenie wniosku, zamówienia publiczne, monitoring, rozliczanie, nadzór odpowiadać będą pracownicy Urzędu Gminy Płoniawy-Bramura (Inspektor Urzędu Gminy). Za eksploatacje odpowiedzialna będzie Dyrekcja Zespołu Szkół. (Polish)
0 references
The project involves the thermal modernisation of the buildings located in the towns of P³onium-Bramuira and Płoni-Cologne, located in the village of Płock rural municipality. The buildings covered by this project are the Primary School in Płock, Poland, and the School in Płock. The main problem in the project is the poor energy efficiency of buildings and a low heating standard and functionality. The scope of the work envisaged is dictated by the following needs: warming of walls, floors, costumes and ceilings, replacement of doors for doors, modernisation of heating systems and installation of hot water supply, modernisation of lighting installations, increasing the share of renewable energy sources in the energy balance, improving the aesthetics of buildings, reducing emissions to ambient air. In the light of the above, the current technical condition requires the adoption of the thermomodernisation measures. The scope of the project will be a comprehensive response to the identified needs and problems. The project involves: insulation of external and fundamental walls and basement walls, insulation of floors and ceilings, insulation of floors, replacement of external doors, fitting of vertical valves and thermostatic valves and heat meters, solar collectors installations for hot water storage, replacement of lighting panels, installation of solar panels. The final beneficiary of the project is the Municipality of Płock — Bramuira and the final beneficiary is all inhabitants of the municipality, as well as the staff and users of the buildings. The main objective of the project is to improve its energy efficiency and the use of renewable energy sources. For the various stages of the project, i.e. the submission of the application, public procurement, monitoring, clearance, supervision will be carried out by the staff of the Office of the Municipality of Płock Bramura (Inspector of the Municipal Office). The Division of the Group of Schools will be responsible for the operations. (English)
0 references
Identifiers
RPMA.04.02.00-14-5406/16
0 references