Improving the energy efficiency of school buildings from the municipality of Międzyrzec Podlaski (municipality of Międzyrzec Podlaski) (Q105435): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 858,442.5552 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
858,442.56 Euro
| |||||||||||||||
Property / EU contribution: 858,442.56 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 858,442.56 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 858,442.56 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 22:55, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of school buildings from the municipality of Międzyrzec Podlaski (municipality of Międzyrzec Podlaski) |
Project in Poland financed by DG Regio |
Statements
3,576,843.98 zloty
0 references
4,208,051.75 zloty
0 references
85.0 percent
0 references
14 January 2019
0 references
15 December 2022
0 references
GMINA MIĘDZYRZEC PODLASKI
0 references
Gł. celem P.: Poprawa jakości środowiska naturalnego na terenie Gm. MP wpływająca na wzrost jakości życia społeczności lokalnej oraz zwiększenie konkurencyjności obszaru. C.szczegół. są: 1.Zoptymalizowanie działań zwiększających efektywność energ. sektora publ., 2.Łagodzenie zmian klimatu poprzez ogran. emisji zanieczyszczeń do atmosfery, 3.Zwiększenie wykorzystania energii pochodzącej z OZE. Grupa docel.: użytk. budynku PSP w Kożuszkach, Jelnicy, Rzeczycy, Misiach i Halasy (uczniowie i kadra nauczycielska i obsł. budynku), mieszkańcy i podm. funkcjon. na terenie Gm. MP. Proj. obej. kompleksową termomodernizację bud. publ. o łącznej pow. użytkowej9816,9 m2. Rezultaty: Ilość zaoszczędzonej e. cieplnej-1750,16GJ/rok; Ilość zaoszczędzonej e. elekt.-135,39 MWh/rok, Zmniejszenie rocznego zużycia e. pierwotnej ..(CI32)-748930,54kWh/rok; Szacowany roczny spadek ...(CI34)-197,69tCO2/rok; Produkcja e. cieplnej z instalacji wykorz. OZE -130,13MWht/rok; Prod.e. elektr. z OZE -24,42MWh/rok Dodat. zdolność wytwarzania energii OZE (CI30)-0,38MW. Produkty: Licz.zmoderniz. energetycznie bud.-5szt. Licz. wybudowanych jed. wytwarzania energii cieplnej-2szt.; Licz. wybudowanych jed.energii elektrycznej z OZE-3szt. Zakres prac obejmuje wykon. prac termomoderniz.: *PSP w Halasach: wymiana stolarki okiennej, pompa ciepła 150 kW; wymiana oświetlenia;syst.zarz.eneg. *PSP Jelnica; docieplenie stropu, wymiana stolarki okiennej i drzwiowej, modernizacja systemu grzewczego, wymiana istniejącego oświetlenia, *PSP w Kożuszkach: docieplenie stropu i ścian zewn., wymiana stolarki okiennej i drzwiowej, montaż pompy ciepła 200kW; wymiana istniejącego oświetlenia na LED; *montaż inst. fotowol. 5,12kW, *PSP w Rzeczycy: *modern. instalacji wentylacji, systemu grzewczego, wymiana istniejącego oświetlenia, montaż inst. fotowol.11,52kW; PSP w Misiach: moderniz. instalacji co.,wymiana oświetlenia LED, syst.zarz.eneg.,inst.foto.11,52 kW; zg. z audytami energet. efektywność energet. proj. wzrośnie o 61,68%. (Polish)
0 references
Objective P.: Improving the quality of the environment in the Gm. MP, affecting the quality of life of the local community and increasing the competitiveness of the area. The details of which are: 1.optimising activities to increase the efficiency of the public sector, 2.Mitigating climate change by reducing atmospheric emissions, 3.Increasing the use of energy from renewable energy sources. Target group: the buildings of the PSP in Koj, Jelnicy, the Republic of Poland, the villages and Hallas (students and staff in the building), inhabitants and substations in the Gm. Proj. comprehensive thermal modernisation of construction works of a total usable area of 9 816.9 m². Results: Quantity of saved heating 1750,16GJ/year; Amount of net electricity of 135.39 MWh/year, Reduction of annual primary consumption. (CI32) -748 930.54 kWh/year; Estimated annual decrease... (CI34) -197,69tCO2/rok; Production of heat from the installation. RES -130,13MWt/year; 24.42 MWh/year Additional electricity generation capacity (CI30) -0.38 MW. Products: Number of modernised energy installations: -5 Number of production of thermal energy generation 2; Number of electrical energy built with OZE-3szt. The scope of the work is to be carried out. * Halma PSP: replacement of window frames, heat pump 150 kW; replacement of lighting; systè.zaeskarego * PSP Jelnica; insulation of the ceiling, replacement of window and door frames, modernisation of the heating system, replacement of existing lighting, * PSP in Koajsk: insulation of the ceiling and outer wall, replacement of window and door frames, installation of a heat pump 200 kW; replacement of existing lighting on LED; * Assembly of the photo capital. 5.12 kW, * PSP in the Republic of: * ventilation system, heating system, replacement of existing lighting, installation of fool.11.52 kW; PSP in mix: installation of installations for replacement of LED lighting, replacement of LED lighting, outboard overhead, inst.photo.11.52 kW; subject to energy audits, energy efficiency will be increased by 61.68 %. (English)
0 references
Identifiers
RPLU.05.02.00-06-0106/19
0 references