ECO-INNOVATION FOR GARBS MUNICIPALITY — PHASE II (Q104648): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 864,241.9199999999 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 864,241.9199999999 Euro / rank | |||||||||||||||
Property / EU contribution: 864,241.9199999999 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 864,241.9199999999 Euro / qualifier | |||||||||||||||
|
Revision as of 22:45, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ECO-INNOVATION FOR GARBS MUNICIPALITY — PHASE II |
Project in Poland financed by DG Regio |
Statements
3,601,008.0 zloty
0 references
4,236,480.0 zloty
0 references
85.0 percent
0 references
1 April 2016
0 references
31 July 2019
0 references
GMINA GARBÓW
0 references
Projekt (P.) zlokaliz. będzie na ter. woj. lubel., w pow. lubelskim., w gm. Garbów(GW).Teren P. obejmuje wszystkie miejsc. w GW. Zakres P. zakłada instalację 444 szt. zestaw. kol. słon. 443szt w obiekt. prywat. i 1szt ob. publ. do podgrz. CWU o sum. mocy 1,8054 MW. P. przewid. również zaprojekt. i wykon. portalu internet., który będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna liczba mieszk. GW korzyst. (GRUPA DOCELOWA) z efektów realiz. P. wyniesie ponad 1700 w 444 obiekt. Instalacje, będące przez cały okres trwałości (5lat) własn. partnerów, zost. usytuow. na budyn. stanow. własn. osób prywat., z którymi GW. podpisała um. użycz. oraz PL. GŁÓWNYM CELEM P. jest zwiększ. stosow. OZE na terenie GW. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarz. czystej energii wśród mieszk. poprzez powsz. montaż OZE na terenie gminy [1,8054 MW w 2019r.].; CEL 2: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. Indy wid. Instal. wykorzysta. OZE [764,64Mwht/rok od 2020r.]; CEL 3: Reduk. zanieczyszcz. powietrza atmosf. poprzez zmniejsz. emisji związków szkodl. dzięki zwiększ. udziału energii ze źródeł odnawialnych [260,76 t. ekwiwal. CO2 / rok od 2020r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL, tj. podn. konkurencyj. regionu w oparciu o wewn. potencj., sprzyjaj. zwiększ. spójn. społ. i terytor. P., obok korz. społ. i gosp. będzie wpływ. na skuteczniejsze przeciwdzi. zmianom klimatu. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. Informac. [uruch. Serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GW. Usytuow. jest w (OSI): Nowoczes. wieś. P. realizow. będzie poza obsz. Nat.2000. GW. dysponuje niezbędną dok. oraz opiniami adm. (Polish)
0 references
The project (P) will be located in. The scope of P. requires the installation of 444 units. 443hlet for public. and 1ht citizen publ. CCU with a total capacity of 1.8054 MW. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GW use. (DOCELOWA group) on the effects of implementation. P will be more than 1700 in 444 sites. Installations which have, over the lifetime of (5 years), the ownership of the partners, be placed on the building. The main objectives of the CEM are increased. RES in GW. Specific objectives: OBJECTIVE 1: The use of renewable energy technology in the municipality of [1.8054 MW in 2019]; OBJECTIVE 2: A minority of the burden of financing social networks, thanks to the work. IndY wid. Installation. RES [764,64Mwht/year since 2020]; OBJECTIVE 3: Reductions in air pollution by reducing the emissions of compounds by virtue of the increase in the share of energy from renewable sources [260.76 t. CO2/rok since 2020]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. The ROP ROP, i.e. the region’s competitiveness on the basis of a major major player, who is conducive to increased social and territorial cohesion. P., together with the social and economic roots, will be influential in tackling climate change in a more effective way. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Social matters Information. [Uruguayan. WWW, in the stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. GW. It is a location in (OSI): Romania’s village. This will be done in addition to you. Nat.2000. GW has the necessary documents and opinions. (English)
0 references
Identifiers
RPLU.04.01.00-06-0022/16
0 references