Construction of water and sanitation infrastructure in Dorohusk — Phase II (Q105573): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 737,527.008 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 737,527.008 Euro / rank | |||||||||||||||
Property / EU contribution: 737,527.008 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 737,527.008 Euro / qualifier | |||||||||||||||
|
Revision as of 22:41, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of water and sanitation infrastructure in Dorohusk — Phase II |
Project in Poland financed by DG Regio |
Statements
3,073,029.2 zloty
0 references
3,615,328.5 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
30 November 2019
0 references
GMINA DOROHUSK
0 references
Przedmiotem projektu jest budowa sieci wodociągowej na terenie gminy Dorohusk. Trasa sieci infrastruktury przebiegać będzie przez 7 miejscowości objętych projektem: Dobryłówka, Ludwinów, Okopy, Okopy Kolonia, Rozkosz, Wólka Okopska i Zamieście. Projektem zostaną objęci mieszkańcy (grupa docelowa projektu), którzy nie mają dostępu do sieci wodociągowej, zaopatrujący się w wodę we własnym zakresie (przydomowe studnie kopane lub głębinowe). Większość mieszkańców korzysta z pozyskania wody pasami transmisyjnymi- co nie spełnia warunków sanitarnych i jest uciążliwe w warunkach zimowych. Niski stan wyposażenia gminy w infrastrukturę wodociągową prowadzi do pogorszenia warunków życia mieszkańców, obniżenia atrakcyjności inwestycyjnej gminy oraz pogorszenia stanu środowiska naturalnego. Zakładane rezultaty projektu to przede wszystkim: 13 598,5m nowo wybudowanej sieci wodociągowej, dostęp 64 mieszkańców gminy do bieżącej wody, podniesienie atrakcyjności gminy dla przyszłych inwestorów jak i turystów, poprawa środowiska naturalnego. Zaplanowane zadania w projekcie polegają na przeprowadzeniu prac budowlanych dotyczących rozbudowy nowej sieci wodociągowej, uruchomienie serwisów, za pośrednictwem których użytkownicy będą mogli dokonywać transakcji on-line (w tym zawieranie umów, odczyty liczników, pobieranie opłat, stan rozliczeń, uwagi i skargi, zapytania, dostępność dotychczasowych i nowych usług itp. w ramach istniejącego systemu ICT funkcjonującego w gminie). Wszystkie prace zostaną przeprowadzone w sposób zapewniający zachowanie równowagi środowiska naturalnego. Wnioskodawca informuje, iż na terenie objętym projektem funkcjonuje prawidłowe zagospodarowanie powstałych nieczystości - przydomowe oczyszczalnie ścieków. (Polish)
0 references
The project is the construction of a water mains network in the municipality of Dorohusk. The infrastructure network will run through 7 project localities: Dobrylka, Ludwins, trenches, Kolonia, rozosz, Wólka Okopska and Zatown. The project will be targeted at the inhabitants (target group) who do not have access to the water supply network, which supplies themselves to the water themselves (domestic fossil or deep-water wells). The majority of the population is using transmission belts for transmission, which does not meet the sanitary conditions and is burdensome in the winter. The low state of equipment of a municipality in water supply infrastructure leads to a deterioration in the living conditions of the inhabitants, a reduction in the attractiveness of the municipality’s investment and a deterioration in the state of the environment. The project’s expected results are mainly: 13 598.5 m newly built water supply network, access of 64 inhabitants of the municipality to tap water, increasing the attractiveness of the municipality to future investors and tourists, improving the environment. The planned tasks of the project consist of building works for the extension of the new water supply network, the provision of services through which users will be able to carry out on-line transactions (including the conclusion of contracts, reading of meters, collection of fees, situation of settlements, observations and complaints, requests, availability of existing and new services, etc., within the existing ICT system in place in the municipality). All works will be carried out in such a way that the balance of the environment is preserved. The applicant points out that the project site is responsible for the correct management of the uncontaminated waste water treatment plants. (English)
0 references
Identifiers
RPLU.06.04.00-06-0001/17