THERMAL MODERNISATION OF UPPER SECONDARY SCHOOL NO 1 (Q101900): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: EU contribution (P835): 445,224.8208 euro)
Property / EU contribution
445,224.8208 Euro
Amount445,224.8208 Euro
UnitEuro
 
Property / EU contribution: 445,224.8208 Euro / rank
Preferred rank
 
Property / EU contribution: 445,224.8208 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / EU contribution: 445,224.8208 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 22:24, 23 September 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
THERMAL MODERNISATION OF UPPER SECONDARY SCHOOL NO 1
Project in Poland financed by DG Regio

    Statements

    0 references
    1,855,103.42 zloty
    0 references
    2,182,474.61 zloty
    0 references
    523,793.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    29 December 2017
    0 references
    POWIAT ŁĘCZYCKI
    0 references
    0 references

    52°3'16.2"N, 19°11'53.9"E
    0 references
    ZAŁOŻENIEM PROJEKTU JEST GŁĘBOKA TERMOMODERNIZACJA OBIEKTÓW UŻYTECZNOŚCI PUBLICZNEJ NA TERENIE POWIATU ŁĘCZYCKIEGO: BUDYNKÓW ZESPOŁU SZKÓŁ PONADGIMNAZJALNYCH NR 1 W ŁĘCZYCY. POWIATOWE BUDYNKI UŻYTECZNOŚCI PUBLICZNEJ (BUDYNKI OŚWIATOWE) POCHODZĄCE Z KOŃCA LAT 50–TYCH XX WIEKU. WYMAGAJĄ KOMPLEKSOWEJ MODERNIZACJI ENERGETYCZNEJ SKUTKUJĄCEJ POPRAWĄ EFEKTYWNOŚCI ENERGETYCZNEJ INFRASTRUKTURY SEKTORA PUBLICZNEGO O CO NAJMNIEJ 25%. W TYM CELU ZAPLANOWANO MODERNIZACJĘ INSTALACJI C.O., MODERNIZACJĘ INSTALACJI C.W.U. (W TYM MONTAŻ KOLEKTORÓW SŁONECZNYCH), MODERNIZACJĘ OŚWIETLENIA, WYMIANĘ OKIEN I DRZWI, OCIEPLENIE PODŁOGI, OCIEPLENIE STROPODACHU, OCIEPLENIE STROPU PODDASZA, OCIEPLENIE ŚCIAN ZEWNĘTRZNYCH ORAZ OCIEPLENIE ŚCIAN PIWNIC. PROJEKT SPEŁNIA WSZYSTKIE CELE PROGRAMOWE I PRZYCZYNIA SIĘ W SZCZEGÓLNOŚCI DO ZMNIEJSZENIA WARTOŚCI ROCZNEGO ZAPOTRZEBOWANIA NA ENERGIĘ BUDYNKÓW UŻYTECZNOŚCI PUBLICZNEJ, OBNIŻENIA KOSZTÓW ZUŻYCIA ENERGII ORAZ PALIW KONWENCJONALNYCH POPRZEZ REDUKCJĘ LUB OGRANICZENIE ICH ZUŻYCIA ORAZ OGRANICZENIE STRAT CIEPŁA I ZMNIEJSZENIA POZIOMU KOSZTÓW EKSPLOATACYJNYCH. POZA TYM PROJEKT WYKORZYSTUJE I PROMUJE NAJBARDZIEJ WYDAJNE I PROEKOLOGICZNE TECHNOLOGIE, URZĄDZENIA I INSTALACJE GRZEWCZE (KOLEKTORY SŁONECZNE). REALIZACJA PROJEKTU PRZYCZYNI SIĘ PRZEDE WSZYSTKIM DO OGRANICZENIA DEGRADACJI LOKALNEGO ŚRODOWISKA W WYNIKU ZMNIEJSZENIA UDZIAŁU EMISJI ZANIECZYSZCZEŃ (W TYM CO2) DO POWIETRZA. NASTĄPI POPRAWA JAKOŚCI POWIETRZA, CO WPŁYNIE NA KOMFORT ŻYCIA W POWIECIE I WZROST AKTYWNOŚCI SPOŁECZNEJ. POZA PRACAMI TERMOMODERNIZACYJNYMI W PROJEKCIE PRZEWIDZIANO WYKONANIE DOKUMENTACJI PROJEKTOWEJ, NADZÓR INWESTORSKI ORAZ PROMOCJĘ PROJEKTU. PROJEKT SŁUŻYĆ BĘDZIE MIESZKAŃCOM POWIATU ŁĘCZYCKIEGO. Z PROJEKTU SKORZYSTAJĄ 51323 OSOBY, A W SZCZEGÓLNOŚCI BĘDZIE MŁODZIEŻ ORAZ RODZICE I NAUCZYCIELE. (Polish)
    0 references
    THE PROJECT IS A DEEP RENOVATION OF THE PUBLIC UTILITIES IN ŁĘCZYCKI: BUILDINGS OF THE UPPER SECONDARY EDUCATION UNIT NO 1 IN ŁĘŃ. DISTRICT BUILDINGS OF GENERAL INTEREST (EDUCATIONAL BUILDINGS) FROM THE END OF THE 50S. REQUIRE A COMPREHENSIVE ENERGY MODERNISATION THAT IMPROVES THE ENERGY EFFICIENCY OF PUBLIC SECTOR INFRASTRUCTURE BY AT LEAST 25 %. MODERNISATION OF THE INSTALLATION OF C.O. (INCLUDING THE INSTALLATION OF SOLAR COLLECTORS), THE MODERNISATION OF LIGHTING, THE REPLACEMENT OF WINDOWS AND DOORS, THE INSULATION OF THE FLOOR, THE INSULATION OF THE FLOOR, THE INSULATION OF THE FLOOR AND THE WARMING OF THE WALL WALLS AND THE WARMING OF THE BASEMENT WALLS ARE PLANNED FOR MODERNISATION OF THE INSTALLATION (INCLUDING THE INSTALLATION OF SOLAR COLLECTORS). THE PROJECT MEETS ALL THE PROGRAMME OBJECTIVES AND CONTRIBUTES IN PARTICULAR TO REDUCING THE ANNUAL ENERGY DEMAND OF PUBLIC BUILDINGS, REDUCING ENERGY CONSUMPTION COSTS AND CONVENTIONAL FUELS BY REDUCING OR REDUCING THEIR CONSUMPTION AND REDUCING HEAT LOSSES AND OPERATING COSTS. IN ADDITION, THE PROJECT USES AND PROMOTES THE MOST EFFICIENT AND ENVIRONMENTALLY FRIENDLY TECHNOLOGIES, EQUIPMENT AND HEATING INSTALLATIONS (SOLAR COLLECTORS). THE PROJECT WILL PRIMARILY CONTRIBUTE TO REDUCING THE DEGRADATION OF THE LOCAL ENVIRONMENT AS A RESULT OF REDUCING THE SHARE OF POLLUTANT EMISSIONS (INCLUDING CO2) INTO THE AIR. THERE WILL BE AN IMPROVEMENT IN THE QUALITY OF THE AIR, WHICH WILL CONTRIBUTE TO THE COMFORT OF LIVING IN THE DISTRICT AND THE INCREASE IN SOCIAL ACTIVITY. IN ADDITION TO THE WORK OF TERMOMODERINLAND, PROJECT DOCUMENTATION, INVESTOR SUPERVISION AND PROJECT PROMOTION ARE FORESEEN IN THE PROJECT. THE PROJECT WILL SERVE THE INHABITANTS OF ŁĘCZYCKI. THE PROJECT WILL BENEFIT 51323 PEOPLE, IN PARTICULAR YOUNG PEOPLE AND PARENTS AND TEACHERS. (English)
    0 references

    Identifiers

    RPLD.04.02.02-10-0005/16
    0 references