THERMO-MODERNISATION OF TWO SP BUILDINGS SP ZOZ HOSPITAL DISTRICT HOSPITAL. (Q101973): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 542,637.2352 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 542,637.2352 Euro / rank | |||||||||||||||
Property / EU contribution: 542,637.2352 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 542,637.2352 Euro / qualifier | |||||||||||||||
|
Revision as of 22:16, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMO-MODERNISATION OF TWO SP BUILDINGS SP ZOZ HOSPITAL DISTRICT HOSPITAL. |
Project in Poland financed by DG Regio |
Statements
2,260,988.48 zloty
0 references
2,862,010.74 zloty
0 references
79.0 percent
0 references
18 November 2016
0 references
30 December 2019
0 references
SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ SZPITAL POWIATOWY IM. EDMUNDA BIERNACKIEGO W OPOCZNIE
0 references
Założeniem projektu jest poprawa efektywności energetycznej w sektorze publicznym poprzez głęboką termomodernizację budynków użyteczności publicznej Szpitala Powiatowego im. E. Biernackiego w Opocznie. Budynki pochodzą z lat 60–tych XX w. Nieekonomiczna energochłonna instalacja grzewcza z przestarzałą hydrauliką bez izolacji termicznej, wyeksploatowane drzwi i okna oraz ściany zewnętrzne i dach bez właściwej izolacji cieplnej powodują duże straty ciepła, wysokie koszty zużycia energii i w efekcie wysoką emisję zanieczyszczeń. Budynek wymaga modernizacji energetycznej skutkującej poprawą efektywności energetycznej infrastruktury sektora publicznego o co najmniej 25%. W tym celu planuje się w budynkach B i C: ocieplenie stropodachu, ocieplenie ścian zewnętrznych, wymianę okien i drzwi zewnętrznych, modernizację instalacji C.O., instalacji C.W.U., instalacji wentylacyjnej, wymianę oświetlenia na energooszczędne, wdrożenie systemu zarządzania energią, montaż liczników ciepła i C.W.U., termostatów i zaworów podpionowych. Wykonana zostanie również instalacja fotowoltaiczna na budynkach B i C. Projekt spełnia wszystkie cele programowe i przyczynia się do zmniejszenia wartości rocznego zapotrzebowania na energię budynków, obniżenia kosztów zużycia energii oraz paliw konwencjonalnych poprzez redukcję lub ograniczenie ich zużycia oraz ograniczenie strat ciepła i zmniejszenia poziomu kosztów eksploatacyjnych. Projekt wykorzystuje i promuje najbardziej wydajne i proekologiczne technologie, urządzenia i instalacje grzewcze. W projekcie uwzględnione zostały założenia koncepcji projektowania uniwersalnego. Realizacja projektu przyczyni się do ograniczenia degradacji lokalnego środowiska w wyniku zmniejszenia udziału emisji zanieczyszczeń (w tym CO2) do powietrza. Nastąpi poprawa jakości powietrza, co wpłynie na komfort życia w Gminie Opoczno i powiecie opoczyńskim oraz wzrost aktywności społecznej. Projekt służyć będzie pacjentom Szpitala – 35 246 os. (mieszkańcy woj. łódzkiego). (Polish)
0 references
The purpose of the project is to improve energy efficiency in the public sector through the deep renovation of the public buildings of the public hospital of the district heating company. The buildings are from the 60s of the 20th century apart from the fact that an energy intensive heating installation with an outdated hydraulic system, with no thermal insulation, operated doors and windows and outside walls and roof without proper thermal insulation result in high heat losses, high energy costs and high pollution emissions. The building requires an energy modernisation that improves the energy efficiency of public sector infrastructure by at least 25 %. To this end, it is planned to do so in B and C: insulation of the roof, insulation of external walls, replacement of windows and external doors, modernisation of the installation of the C.O., service of the hot-water system, ventilation system, replacement of lighting on energy efficient, implementation of the energy management system, installation of heat meters and hot service water, thermostats and sub-vertical valves. A photovoltaic installation on B and C buildings will also be constructed. the project meets all the objectives of the programme and contributes to reducing the annual energy demand of buildings, reducing the cost of energy consumption and conventional fuels by reducing or reducing their consumption and reducing heat and operating costs. The project uses and promotes the most efficient and environmentally friendly technologies, equipment and heating installations. The project takes into account the assumptions of the concept of universal design. The project will contribute to reducing the degradation of the local environment as a result of reducing the share of pollutant emissions (including CO2) into the air. There will be an improvement in the quality of the air, which will affect the quality of life in the area of Opoeczno and district of rest, and the increase in social activity. The project will be aimed at patients in the hospital of 35 246 persons. (residents of Łódzkie Province). (English)
0 references
Identifiers
RPLD.04.02.02-10-0072/17
0 references