A comprehensive structure of the collecting system for the distribution of the distribution system in the agglomeration of Lipce Reyassembly — Stage III (Q102059): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 1,426,712.004 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
1,426,712.00 Euro
| |||||||||||||||
Property / EU contribution: 1,426,712.00 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 1,426,712.00 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 1,426,712.00 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 22:00, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | A comprehensive structure of the collecting system for the distribution of the distribution system in the agglomeration of Lipce Reyassembly — Stage III |
Project in Poland financed by DG Regio |
Statements
5,944,633.35 zloty
0 references
6,993,686.29 zloty
0 references
85.0 percent
0 references
29 March 2019
0 references
31 December 2021
0 references
GMINA LIPCE REYMONTOWSKIE
0 references
Projekt polega na budowie w aglomeracji Lipce Reymontowskie sieci kanalizacji sanitarnej (8883m+3256m) i wodociągowej (1648m+155m) położonych w miejscowościach Lipce Reymontowskie i Mszadla oraz rozbudowie i przebudowie części technologicznej oczyszczalni ścieków w Lipcach Reymontowskich. Projekt jest realizowany na obszarze aglomeracji od 2 do poniżej 10 tys. RLM. Realizacja inwestycji pozwoli dostosować stan infrastruktury wodociągowej i kanalizacyjnej w aglomeracji do polskich i unijnych standardów oraz przepisów prawnych dotyczących stałości dostawy oraz jakości wody pitnej. Rozbudowa systemu kanalizacji sanitarnej zwiększy liczbę mieszkańców podłączonych do zbiorczego systemu odbioru ścieków, co wpłynie na ograniczenie niekontrolowanego zrzutów ścieków bytowo – gospodarczych z nieskanalizowanych terenów. Przebudowana oczyszczalnia ścieków w zakresie zmiany technologii odwadniania osadów ściekowych pozwoli na poprawę jakości osadów, co pozwoli na ich ponowne użytkowanie rolnicze (racjonalna gospodarka osadami ściekowymi). Projekt przyczyni się znacznie do poprawy jakości środowiska i jakości życia mieszkańców. Celem głównym projektu jest kompleksowe uporządkowanie systemu zbiorczej kanalizacji rozdzielczej w aglomeracji Lipce Reymontowskie poprzez podniesienie poziomu wyposażenia Gminy w sieć kanalizacji sanitarnej, sieć wodociągową oraz przebudowę części technologicznej istniejącej oczyszczalni ścieków. Poprawie ulegnie stan zdrowia ludności dzięki spożywaniu zdrowej wody. Liczba osób, które skorzystają z ulepszonego oczyszczania ścieków – 1501 osób, w tym 441 w nowo podłączonych gospodarstwach. Projekt został przygotowany w zgodzie z założeniami koncepcji projektowania uniwersalnego. Oczyszczalnia, do której będą odprowadzane ścieki, spełnia wymogi określone w zał. I.B do Dyrektywy nr 91/271/EWG. Projekt wynika z Tabeli głównej Master Planu dla dyrektywy Rady 91/271/EWG, zgodnie z którą RLM rzeczywiste dla aglomeracji Lipce Reymontowskie wynosi 2074 (Polish)
0 references
The project consists of the construction, in the agglomeration of the agglomeration of Lipce, of a sewage system (8 883 m + 3 256 m) and a water supply (1 648 m + 155 m) located in the municipalities of Lipce Reymontowskie and Murad, and the extension and reconstruction of the technological part of the wastewater treatment plant in the Reymontowy area. The project is carried out in an area of agglomerations of between 2 and less than 10. P.E. The implementation of the investment will make it possible to adapt the state of water and sewage infrastructure in the agglomeration to the Polish and EU standards and legal provisions on the constancy of supply and the quality of drinking water. The development of the sewage system will increase the number of inhabitants who are connected to the collective collecting system, which will have the effect of reducing uncontrolled discharges of waste water from the land. The wastewater treatment plant restructured for changing the drainage technology of the sewage sludge will improve the quality of the sludge in order to allow them to be used again (rational management of sewage sludge). The project will contribute significantly to improving the quality of the environment and the quality of life of the inhabitants. The aim of the project is to provide a comprehensive structure for the collecting system for the distribution of the sewerage system in the agglomeration of Lipce Reyassembly by increasing the level of equipment of the municipality in the sewerage network, the water supply network and the upgrading of the technological component of the existing waste water treatment plant. The health of the population will be improved by eating a healthy water. Number of people who benefit from improved wastewater treatment — 1501 people, including 441 in newly connected farms. The project has been prepared in line with the design of the universal design concept. The treatment plant to which the waste water will be discharged complies with the requirements laid down in the Annex. I.B to Directive 91/271/EEC. The project results from the Master Plan Master Plan for Council Directive 91/271/EEC according to which the actual p.e. for the agglomeration of Leipzig Reymontane is 2074. (English)
0 references
Identifiers
RPLD.05.03.02-10-0002/19
0 references