CONSTRUCTION OF PUBLIC LIGHTING BY MEANS OF ENERGY EFFICIENCY AND ENVIRONMENTAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO, KUNICE, WORK, STONE AND PRUDENCE (Q102022): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 114,427.3608 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
114,427.36 Euro
Amount114,427.36 Euro
UnitEuro
Property / EU contribution: 114,427.36 Euro / rank
 
Preferred rank
Property / EU contribution: 114,427.36 Euro / qualifier
 
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
Property / EU contribution: 114,427.36 Euro / qualifier
 
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:59, 23 September 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF PUBLIC LIGHTING BY MEANS OF ENERGY EFFICIENCY AND ENVIRONMENTAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO, KUNICE, WORK, STONE AND PRUDENCE
Project in Poland financed by DG Regio

    Statements

    0 references
    476,780.67 zloty
    0 references
    114,427.36 Euro
    13 January 2020
    0 references
    561,579.12 zloty
    0 references
    134,778.99 Euro
    13 January 2020
    0 references
    84.9 percent
    0 references
    1 February 2019
    0 references
    20 December 2019
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    51°23'31.2"N, 20°8'23.6"E
    0 references
    PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH ZGODNIE Z KONCEPCJĄ PROJEKTOWANIA UNIWERSALNEGO WG WYTYCZNYCH FU 2014-2020 NA ODCINKACH: • KUNICE: 26 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 28 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED I 2 SZT. ZNAKÓW AKTYWNYCH ZASILANYCH Z MODUŁU FOTOWOLTAICZNEGO • KAMIEŃ: 62 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED • OSTROŻNA: 4 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 120 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KUNICE. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI KAMIEŃ. 4. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI OSTROŻNA. 5. PROMOCJA PROJEKTU. 6. NADZÓR INWESTORSKI. 7. PRZYŁĄCZENIE DO SIECI DYSTRYBUCYJNEJ PGE SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY P (Polish)
    0 references
    THE PROJECT CONSISTS OF BUILDING PUBLIC LIGHTING WITH ENERGY EFFICIENT AND ECOLOGICAL DEVICES IN LINE WITH THE DESIGN FOR UNIVERSAL DESIGN ACCORDING TO THE FU GUIDELINES 2014-2020 ON SECTIONS: • UNICE: 26 POINTS OF LIGHT OF THE TYPE OF LED• WORK: 28 LIGHT POINTS WITH LED AND 2 UNITS. ACTIVE MARKS SUPPLIED BY THE PHOTOVOLTAIC MODULE• STONE: 62 POINTS OF LIGHT OF THE TYPE LED• CAREFUL: THE 4 LIGHT POINTS WITH THE LED COPYRIGHT ON THE COMBINED CONSTRUCTION OF 120 LAMPS WITH LED AND 2 ACTIVE CHARACTERS FROM THE PV MODULE (RES) ARE PART OF A BROADER INFRASTRUCTURE PROJECT, WHICH IS IN PARALLEL IMPLEMENTED AND FINANCED BY THE BENEFICIARY — MORE IN A POINT. 6.6 WD. CURRENT HIGH COSTS OF LIGHT PUBLIC INTEREST: • THEY GENERATE HIGH LIGHTING COSTS• INCREASE ENVIRONMENTAL POLLUTION• THE HIGH COST OF LIGHTING DO NOT INCREASE IN PROPORTION TO THE NEEDS OF NEW INVESTMENTS• THE LACK OF USE OF ENERGY EFFICIENCY AND ENVIRONMENTAL (RES) SYSTEMS. TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING WITH ENERGY-EFFICIENT EQUIPMENT IN THE KUNICE AREA. 2. CONSTRUCTION OF PUBLIC LIGHTING BY MEANS OF ENERGY EFFICIENCY AND ENVIRONMENTAL EQUIPMENT IN THE VILLAGE OF PRYMPUSOVA; 3. CONSTRUCTION OF PUBLIC LIGHTING WITH ENERGY-EFFICIENT EQUIPMENT IN AN STONE. 4. CONSTRUCTION OF PUBLIC LIGHTING WITH ENERGY-EFFICIENT EQUIPMENT IN A VILLAGE. 5. PROJECT PROMOTION. 6. INVESTOR SUPERVISION. 7. THE CONNECTION TO THE PGE DISTRIBUTION NETWORK OF THE DETAILED TECHNICAL REQUIREMENTS. ARE LOCATED IN THE ROZ. 4 AND ANNEX. 3. OBJECTIVES: THANKS TO THE PROJECT, THE MAIN PURPOSE OF THE PROJECT WILL BE FULFILLED. INCREASING ENERGY SAVINGS AND CLEANER AIR IN THE MUNICIPALITY OF SŁAWNO. AUDIENCE: DIRECT: THE RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, MOBILE PEOPLE, USING THE INFRASTRUCTURE P (English)
    0 references

    Identifiers

    RPLD.04.03.02-10-0023/18
    0 references