Thermal modernisation of the School Team in Łubianka (Q98377): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 304,519.9392 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 304,519.9392 Euro / rank | |||||||||||||||
Property / EU contribution: 304,519.9392 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 304,519.9392 Euro / qualifier | |||||||||||||||
|
Revision as of 21:50, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the School Team in Łubianka |
Project in Poland financed by DG Regio |
Statements
1,268,833.08 zloty
0 references
1,586,041.36 zloty
0 references
80.0 percent
0 references
8 April 2016
0 references
31 March 2018
0 references
GMINA ŁUBIANKA
0 references
Wnioskodawca - Gmina Łubianka od wielu lat prowadzi działania zmierzające do poprawy jakości środowiska naturalnego poprzez zmniejszanie emisji zanieczyszczeń (głównie CO2) z terenu Gminy. W tym zakresie przeprowadziła kilka projektów, które znacząco zmniejszyły emisję zanieczyszczeń, jak również obniżyły koszty operacyjne funkcjonowania Gminy. Kolejną składową zaplanowanych działań w tym zakresie jest, wynikająca również z Planu Gospodarki Niskoemisyjnej dla Gminy Łubianka, termomodernizacja budynku Zespołu Szkół w Łubiance. W celu odpowiedniego przygotowania projektu, jednym z pierwszych etapów było opracowanie audytu energetycznego. Wnioski płynące z tego dokumentu stały się podstawą do opracowania projektu kompleksowej, głębokiej termomodernizacji budynku użyteczności publicznej jakim jest Zespół Szkół w Łubiance. Ostatecznym zakresem rzeczowym projektu zostały wszystkie działania wskazane w audycie energetycznym, do których należą:1. docieplenie stropodachów styropapą gr. 22 cm;2. docieplenie połaci dachów wełną mineralną gr. 15 cm poprzez jej ułożenie na stropach;3. wymiana istniejącej instalacji c.o. obejmująca: demontaż istniejącej i montaż nowej instalacji grzewczej c.o., przyłączenie projektowanej instalacji c.o. do źródła ciepła – pompa ciepła zlokalizowana w podpiwniczeniu budynku, roboty budowlane i remontowe związane z projektowanymi robotami instalacyjnymi;4. budowa kaskady trzech pomp ciepła z dolnym źródłem zasilania, która pracować będzie na potrzeby ogrzewania i przygotowania c.w.u. dla przedmiotowego budynku;5. demontaż istniejącej instalacji oświetlenia (z wyłączeniem oświetlenia w 6 lokalach mieszkalnych), montaż nowej instalacji oświetlenia wewnętrznego podstawowego i awaryjnego oraz częściowa wymiana instalacji elektrycznej, w tym gniazd wtykowych i tablic elektrycznych piętrowych.Działania te pozwolą na zwiększenie efektywności energetycznej budynku o ponad 80% oraz redukcję emisji CO2 o blisko 170 Mg/rok. (Polish)
0 references
The applicant — Łubianka in many years has worked to improve the quality of the environment by reducing emissions of pollutants (mainly CO2) from the municipality. In this respect, it has carried out several projects which have significantly reduced pollution emissions as well as the operating costs of the municipality. Another component of the planned activities in this area is also linked to the Low Carbon Economy Plan for the Municipality of Łubianka, thermal modernisation of the School Team in Łubianka. In order to prepare the project properly, one of the first stages was the development of an energy audit. The conclusions of this document formed the basis for the development of a comprehensive, deep energy renovation of the public building, which is the School Complex in Łubianka. The final scope of the project was all the actions identified in the energy audit, such as 1th tuning of the 15-cm style of stills, 22 cm; 2. the insulation of the cm mineral wool roofs by laying them on the ceilings; (3) the replacement of an existing c.o system consisting of: the dismantling of the existing and the installation of a new heating system for the heating system and the installation of a new heating system for heating — a heat pump located in the building’s podpiwek, construction and renovation works connected with the projected works works; 4. construction of a cascade of three heat pumps with a lower power supply for heating and preparing for the building in question; 5. dismantling of the existing lighting installation (excl. lighting in 6 housing), installation of a new lighting installation for the interior and emergency and partial replacement of electrical installations, including plug-in sockets and electric chassis plates. these measures will help to improve the energy efficiency of the building by more than 80 % and to reduce CO2 emissions by nearly 170 tonnes/year. (English)
0 references
Identifiers
RPKP.03.05.01-04-0046/17
0 references