Management of rainwater and mites, including the retention of water in the Municipality of Starogard Gdański (Q85055): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 1,937,611.5335999997 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,937,611.5335999997 Euro / rank | |||||||||||||||
Property / EU contribution: 1,937,611.5335999997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,937,611.5335999997 Euro / qualifier | |||||||||||||||
|
Revision as of 06:42, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Management of rainwater and mites, including the retention of water in the Municipality of Starogard Gdański |
Project in Poland financed by DG Regio |
Statements
8,073,381.39 zloty
0 references
9,498,095.76 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
31 March 2021
0 references
GMINA MIEJSKA STAROGARD GDAŃSKI
0 references
Zadanie 1.1. Budowa systemu kanalizacji deszczowej zbierającej wody opadowe w rejonie ul. Iwaszkiewicza do planowanego zbiornika retencyjnego Planowana inwestycja ma na celu odciążenie kanalizacji deszczowej w analizowanej zlewni oraz opóźnienie spływu powierzchniowego. Budowa nowego kolektora kanalizacji deszczowej, do którego przyłączona zostanie istniejąca sieć odwodnieniowa pozwoli na odprowadzenie wód opadowych i roztopowych do budowanego zbiornika retencyjnego. Zbiornik retencyjny przepływowy zostanie wyposażony w armaturę i system sterowania umożliwiające sterowanie odpływem. Sterowanie ma na celu zatrzymanie wód opadowych kierowanych do zbiornika w celu ich wykorzystania. W celu zagospodarowania wód opadowych na terenach inwestycyjnych oraz zmniejszenia dotychczasowych odpływów chwilowych systemu kanalizacji deszczowej funkcjonującej na terenie miasta Starogard Gdański przewidziano: zastosowanie retencjonowania wód deszczowych w otwartym zbiorniku (nowobudowanym), budowę nowych kanałów deszczowych, budowę nowych wpustów deszczowych, budowę podczyszczalni ścieków deszczowych wprowadzanych do odbiorników, przebudowę istniejącego rowu melioracyjnego, odtworzenie progów na odcinku ujściowym rowu melioracyjnego do rzeki Kochanki, budowę dodatkowych wylotów do odbiornika, instalację systemu sterowania odpływem ze zbiornika. Inwestycja obejmuje roboty budowlano-montażowe. Podstawowy zakres robót obejmuje: budowę nowych kanałów deszczowych o długości 1210 mb, budowę zbiornika retencyjnego przepływowego o pojemności 8600 m3, budowę urządzeń podczyszczających wody deszczowej odprowadzanych do odbiorników (2 szt separatorów lamelowych). Zbiornik retencyjny będzie w stanie pomieścić wody deszczowe w ilości maksymalnej ok. 8600 m3. Wody będą oczyszczane, a następnie wprowadzane do odbiorników. Oczyszczone wody zgromadzone w zbiorniku planuje się wykorzystać na potrzeby podlewania zieleni miejskiej i cele przeciwpożarowe. Zadanie zostało zaplanowane na podstawie inwentary (Polish)
0 references
Target 1.1.Construction of storm water collecting system in the area ul.The aim of the planned retention reservoir of Ivashkevich to the planned retention reservoir is to ease the flow of the storm water in the catchment area under consideration and to delay the run-off of the surface run-off.Construction of a new rainwater collector to which an existing drainage system will be connected will permit rainwater and mites to drain into the water storage reservoir.The flow retention reservoir shall be equipped with a cannon and a control system capable of controlling the effluent.The purpose of control-command and signalling is to stop the rainwater that is sent to the container for use.In order to manage the rain water on the investment areas, and to reduce the run-off water flows already flowing from the storm water system operating in the city of Starogard Gdański, the following are foreseen:the application of storm-water retention in an open reservoir (newly built), the construction of new rainwater drains, the construction of new rain drains, the construction of pre-treatment rainwater drains, the reconstruction of the existing drainage ditch and the setting of thresholds on the drainage stretch of the drainage ditch to the river Kochanka, the construction of additional outlets to the receiver, the installation of an outlet control system.The investment shall cover construction and assembly works.The basic scope of the works shall be to:construction of new rainwater canals with a length of 1210 mb, building a flow-through reservoir with a capacity of 8 600 m³, construction of storm water cleaning facilities discharged into receivers (2 units of the light separators).The storage reservoir shall be capable of accommodating rainwater in a maximum quantity.8 600 m³.The water will be cleaned and then applied to the receiver.The cleaned water collected in the tank is planned to be used for the purposes of watering down the green spaces and fire objectives.The task has been planned on the basis of inventories (English)
0 references
Identifiers
POIS.02.01.00-00-0007/18
0 references