Replacement of lignite boilers + accessories (Q61457): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: EU contribution (P835): 15,455.472 euro)
Property / EU contribution
15,455.472 Euro
Amount15,455.472 Euro
UnitEuro
 
Property / EU contribution: 15,455.472 Euro / rank
Preferred rank
 
Property / EU contribution: 15,455.472 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / EU contribution: 15,455.472 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 21:26, 22 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Replacement of lignite boilers + accessories
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    386,386.8 Czech koruna
    0 references
    643,978.0 Czech koruna
    0 references
    25,759.12 Euro
    10 January 2020
    0 references
    60 percent
    0 references
    1 December 2019
    0 references
    Josef Fajtl
    0 references
    0 references

    49°57'52.16"N, 17°37'46.92"E
    0 references
    79312
    0 references
    Předmětem dotace je výměna stávajícího ručně plněného kotle za automatický kotel splňující parametry Ekodesignu.Dále se v rámci dotace předpokláda dokončení otopné soustavy v prostorách provozovny, které nejsou v současné době vytápěny a kde nejsou instalovány ani rozvody ani radiátory.Současně by proběhla i částečná rekonstrukce otopné soustavy ve stávajících vytápěných prostorách. Národní třída 302, 793 12 Horní Benešov, parcelní číslo 1180/1 (Czech)
    0 references
    The subject of the subsidy is the replacement of an existing hand-filled boiler as an automatic boiler meeting the parameters of eco-design. Furthermore, as part of the subsidy, the planned completion of the heating system at the premises of the establishment, which is currently not heated and where no distribution or distribution is made, would be carried out. at the same time, partial refurbishment of the heating system in existing heated areas would also take place. National Classes 302, 793 12 Upper Benešov, parcel No 1180/1 (English)
    0 references

    Identifiers

    CZ.05.2.28/0.0/0.0/19_136/0009953
    0 references