Rehabilitation of the rock wall of Hroška (Q58798): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 407,183.0808 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
407,183.08 Euro
| |||||||||||||||
Property / EU contribution: 407,183.08 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 407,183.08 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 407,183.08 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 21:19, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Rehabilitation of the rock wall of Hroška |
Project in Czech Republic financed by DG Regio |
Statements
10,179,577.02 Czech koruna
0 references
11,975,972.97 Czech koruna
0 references
85.0 percent
0 references
17 July 2018
0 references
1 August 2019
0 references
30 September 2019
0 references
Obec Bílý Újezd
0 references
51801
0 references
Obsahem projektu je sanace skalní stěny v Bílém Újezdě, místní části Hroška. Stabilizace skalní stěny proběhne tak, aby byla zajištěna bezpečnost obyvatel domů situovaných v těsné blízkosti pod skalní stěnou. Zároveň je řešena technická ochrana objektů a nemovitostí. (Czech)
0 references
The project content is the rehabilitation of the rock wall in Bíá Úří Úří, the local part of Hroška. The stabilisation of the rock wall shall be carried out in such a way as to ensure the safety of the inhabitants of homes situated in close proximity to the rocky wall. At the same time, the technical protection of buildings and buildings is addressed. (English)
0 references
Identifiers
CZ.05.1.24/0.0/0.0/17_062/0005906
0 references