Energy savings in multi-family buildings — ul. Sadova No. 604, 605 and 606 (Q75226): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Removed claim: EU contribution (P835): 301,127.0472 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 301,127.0472 Euro / rank | |||||||||||||||
Property / EU contribution: 301,127.0472 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 301,127.0472 Euro / qualifier | |||||||||||||||
|
Revision as of 13:08, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings in multi-family buildings — ul. Sadova No. 604, 605 and 606 |
Project in Czech Republic financed by DG Regio |
Statements
7,528,176.18 Czech koruna
0 references
23,307,047.0 Czech koruna
0 references
32.3 percent
0 references
12 September 2016
0 references
31 March 2018
0 references
31 March 2018
0 references
Statutární město Frýdek-Místek
0 references
73801
0 references
Předmětem projektu je modernizace bytových domů na ul. Sadová č.p. 604, 605 a 606. Jde o soubor obytných devítipodlažních panelových domů (blok A, B) propojených jedno (blok D) a dvoupodlažními objekty (blok C). V rámci stavby dojde k zateplení obvodového a střešního pláště včetně výměny oken a dveří a k rekonstrukci balkónů včetně montáže nového zábradlí. Bude provedena oprava okapového chodníku, rekonstrukce hromosvodu a další související práce. V objektu je celkem 156 bytových jednotek. (Czech)
0 references
The purpose of the project is the modernisation of apartment buildings on ul. Sadova no. 604, 605 and 606. It is a population of nine floors housing (block A, B) connected with one (block D) and twin floors (Block C). The construction works on the insulation of the perimeter of the roof and the roof, including the exchange of windows and doors and the reconstruction of the balconies, including the mounting of the new guard rails. A repair will be made to the bonnet pavement, the reconstruction of the lightning conductor and the other related work. There are a total of 156 housing units at the premises. (English)
0 references
Identifiers
CZ.06.2.11/0.0/0.0/15_018/0001201
0 references