Insulation of façades and roofs of the School of SŠGS in New Pace (Q72557): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 113,726.944 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
113,726.94 Euro
| |||||||||||||||
Property / EU contribution: 113,726.94 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 113,726.94 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 113,726.94 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 07:17, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation of façades and roofs of the School of SŠGS in New Pace |
Project in Czech Republic financed by DG Regio |
Statements
2,843,173.6 Czech koruna
0 references
7,107,934.0 Czech koruna
0 references
40 percent
0 references
26 May 2017
0 references
31 March 2019
0 references
Střední škola gastronomie a služeb, Nová Paka, Masarykovo nám. 2
0 references
50901
0 references
Předmětem projektu je snížení energetické náročnosti budovy SŠGS Nová Paka na adrese Masarykovo nám. 2, 509 01 Nová Paka. Uživatelem objektu a také žadatelem o podporu je příspěvková organizace Královéhradeckého kraje Střední škola gastronomie a služeb, Nová Paka. V rámci technického řešení rekonstrukce je navrženo kompletní zateplení obálky budovy (fasáda, sokl, střecha), instalace rekuperační jednotky, instalace soustavy LED svítidel a výměna zbývajících původních výplní. (Czech)
0 references
The project concerns the improvement of the energy performance of the SŠGS Nová Pak building at Masarykovo y. 2, 509 01 Nová Paka. The owner of the premises and the applicant for support are the state-funded organisation of the Hradec Králové Region of the Central School of gastronomy and services, Nová Paka. As part of the technical solution, the renovation is designed to complete the insulation of the building envelope (facade, sculpture, roof), installation of the regenerative unit, installation of the LED lighting system, and replacement of the remaining initial stock. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001910
0 references