Construction finishes BD Č.p. 662, Bílovec (Q76081): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 71,128.9656 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 71,128.9656 Euro / rank | |||||||||||||||
Property / EU contribution: 71,128.9656 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 71,128.9656 Euro / qualifier | |||||||||||||||
|
Revision as of 19:01, 21 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction finishes BD Č.p. 662, Bílovec |
Project in Czech Republic financed by DG Regio |
Statements
1,778,224.14 Czech koruna
0 references
4,445,560.35 Czech koruna
0 references
40 percent
0 references
1 May 2017
0 references
3 October 2018
0 references
5 October 2018
0 references
xxx
0 references
74283
0 references
Projekt řeší:-zateplení obvodového pláště-zateplení soklu-zateplení podlahy na zemině-zateplení stropu nad 2NP-výměna oken a dveří-výměna vnitřního rozvodu teplé vody-výměna zdroje vytápění-výměna rozvodu vytápění-výměna zdroje TUV-instalace podlahového vytápění-stavební a přípravné práce-klempířské práce-výstavba lešení vč.záchytných sítí-bourací stavební práce (Czech)
0 references
The project deals with: the insulation of the perimeter retractable of the open-floor sun containment station at the ceiling above 2NP-exchange of windows and door interchange of the internal distribution of the domestic hot water distribution system, the exchange of a source for the exchange of a source for the replacement of a heat exchange source with building and preparatory work, building on the construction of leopard works, and the construction of a reduction in the attachment of building work. (English)
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0007022
0 references