Polelavovice — Školje pavements — pavements of the streets of Školni, II. Stage (Q63008): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 56,972.412000000004 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
56,972.41 Euro
Amount56,972.41 Euro
UnitEuro
Property / EU contribution: 56,972.41 Euro / rank
 
Preferred rank
Property / EU contribution: 56,972.41 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / EU contribution: 56,972.41 Euro / qualifier
 
point in time: 1 October 2020
Timestamp+2020-10-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:25, 21 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Polelavovice — Školje pavements — pavements of the streets of Školni, II. Stage
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,424,310.3 Czech koruna
    0 references
    56,972.41 Euro
    1 October 2020
    0 references
    1,499,274.0 Czech koruna
    0 references
    59,970.96 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    1 January 2018
    0 references
    31 October 2018
    0 references
    31 October 2018
    0 references
    Městys Polešovice
    0 references
    0 references

    49°1'53.8"N, 17°19'45.5"E
    0 references
    68737
    0 references
    Předmětem projektu je rekonstrukce stávajících chodníků a jimi vyvolané stavební úpravy místní komunikace. V rámci stavby je navržena šířková úprava chodníku na minimální hodnotu 1,50 m a nový povrch z betonové zámkové dlažby. Celkem budou rekonstruovány chodníky v délce 320,2 m a ploše 480,3 m2. Prioritou stavby je zajistit bezpečné propojení komunikačních tras pro pěší na přístupové cestě k základní škole. (Czech)
    0 references
    The project involves the reconstruction of existing pavements and the ensuing development of local roads. As part of a construction work, a 1.50 m minimum width of the walkway and a new surface made of concrete captions would be made. The total of 320.2 m and 480.3 m² will be rebuilt. The priority of building is to ensure that communication routes are securely connected to a primary school on the path of access to a primary school. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0008494
    0 references