Road corridor in the Street — New Sedlo (Q63723): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 94,970.5404 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
94,970.54 Euro
Amount94,970.54 Euro
UnitEuro
Property / EU contribution: 94,970.54 Euro / rank
 
Preferred rank
Property / EU contribution: 94,970.54 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / EU contribution: 94,970.54 Euro / qualifier
 
point in time: 1 October 2020
Timestamp+2020-10-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:22, 21 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Road corridor in the Street — New Sedlo
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,374,263.51 Czech koruna
    0 references
    94,970.54 Euro
    1 October 2020
    0 references
    2,499,224.75 Czech koruna
    0 references
    99,968.99 Euro
    1 October 2020
    0 references
    95.0 percent
    0 references
    31 December 2020
    0 references
    Město Nové Sedlo
    0 references
    0 references

    50°12'24.8"N, 12°44'8.5"E
    0 references
    35734
    0 references
    Stavba chodníku je navržena podél komunikace III/ 209 8 a podél místní komunikace v Hornické Kolonii. Na komunikaci je obousměrný provoz, povolená rychlost je 50km/h. Bude též zrekonstruováno veřejné osvětlení, které bude osazeno úspornými LED svítidly. V Hornické Kolonii bude dešťová kanalizace zrekonstruována v celé délce a v Loketské ulici bude komunikace odvodněna pomocí nových bočních ul. vpustí a kanalizace bude v případě potřeby opravena. Bude provedeno osvětlené místo pro přecházení. (Czech)
    0 references
    The building of the pavement is designed along communication III/209 8 and along a local road in a mining colony. For communication, the two-way operation is two-way, the speed allowed is 50 km/h. it will also be reconstructed of public lighting which will be fitted with energy-saving LED lamps. In a mining colony, the drainage system will be remodelled in its entirety and the communication will be drained through the new lateral ul. it will leave and the drain will be corrected if necessary. An illuminated place for crossing shall be provided. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0011126
    0 references