The construction of a glass museum, including the barrier-free approach and the reconstruction of the depository in Kastrana Horch (Q60470): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 1,494,893.0415999999 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
1,494,893.04 Euro
| |||||||||||||||
Property / EU contribution: 1,494,893.04 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 1,494,893.04 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 1,494,893.04 Euro / qualifier | |||||||||||||||
point in time: 1 October 2020
|
Revision as of 17:43, 21 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The construction of a glass museum, including the barrier-free approach and the reconstruction of the depository in Kastrana Horch |
Project in Czech Republic financed by DG Regio |
Statements
37,372,326.04 Czech koruna
0 references
43,967,442.41 Czech koruna
0 references
85.0 percent
0 references
31 December 2020
0 references
Muzeum Šumavy Sušice, příspěvková organizace
0 references
34201
0 references
V objektu čp. 141 v Kašp. Horách vznikne nové sklářské muzeum. Dosavadní expozice už nevyhovuje svým rozsahem ani koncepcí, nedokáže představit sklářskou sbírku v plném rozsahu a sklářskou tematiku ve všech souvislostech historického vývoje. Při rekonstrukci objektu r. 2011 byla už provedena potřebná stavební úprava pro instalaci výtahu, který nyní bude vybudován. V roce 2012 jsme získali také nový objekt depozitáře. Po provedení kompletní rekonstrukce zde vznikne depozitář pro sbírky muzea. (Czech)
0 references
At the building site. 141 in Kashp. A new glass museum will be created by the mountains. The previous exposure is no longer fit for scope or concept and is not able to present a full and glass collection in all its historical context. The construction of the 2011 building has already made the necessary construction work for the installation of the lift, which will now be built. In 2012, we also acquired a new depositary object. Once a full reconstruction has been carried out, a depositary for the collection of the museum will be created. (English)
0 references
Identifiers
CZ.06.3.33/0.0/0.0/17_099/0007840
0 references