Increasing energy efficiency in the buildings of Primary Schools No 1 and 2 in Gołdapi (Q132270): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Ełcki / rank
 
Normal rank

Revision as of 09:27, 17 July 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing energy efficiency in the buildings of Primary Schools No 1 and 2 in Gołdapi
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    3,469,106.19 zloty
    0 references
    832,585.4855999999 Euro
    13 January 2020
    0 references
    4,759,306.62 zloty
    0 references
    1,142,233.59 Euro
    13 January 2020
    0 references
    72.89 percent
    0 references
    24 July 2018
    0 references
    30 September 2020
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    Modernizacja energetyczna 2 budynków Gminy Gołdap: 1. Szkoła Podstawowa nr 1 z Oddziałami Integracyjnymi im. Mikołaja Kopernika w Gołdapi (Gołdap, ul Szkolna 4) 2. Szkoła Podst. 2 im. Marsz. Józefa Piłsudskiego w Gołdapi (Gołdap, ul 1 Maja 25) Budynki odp. z 1903 r. i 1990 r., wybudowane w techn. tradycyjnej, niespełniające standardów termoizolacji Roboty termomodernizacyjne obejmują m.in: -ocieplenie ścian zewn. i dachu -wymianę drzwi zewn.i okien -wymianę/modernizację instalacji c.o. i wentylacji -montaż pomp ciepła -wymianę oświetlenia -montaż paneli fotowoltaicznych; Wytworzona energia na potrzeby własne Gminy Identyfik. optymalnych działań wzrostu efektywn. energet.obiektów na podst. audytów energetycznych. Skala Projektu optymalna pod względem techniczno–technologicznym, ekonom. i środowiskowym Termomodernizacja w oparciu o dok. techniczną Etapy i sposób wdrażania projektu przez Urząd Miejski w Gołdapi 1.Oprac. programu inwestycji, audytu energet ex-ante, dokumentacji techn. i studium wykonalności 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, nadzór inwestorski, promocja, audyt ex-post 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończenie proj. i audyt ex-post 7.Finans. rozliczenie proj. Proj. zgodny m.in. z: -Planem Gospodarki Niskoemisyjnej Gminy Gołdap -Ponadlokalnym programem rewitalizacji sieci miast Cittaslow Woj. Warm–Maz -SzOOP RPO WiM– cel temat.4 Wspieranie przejścia na gosp. niskoemisyjną(..), priorytet inwest.4c: Wspieranie efektywności energet.,inteligentnego zarządz. energią i wykorzyst.OZE w infrastrukturze publ.,(..), cel szczegółowy: Zwiększona efektywność energet. w budynkach użyteczności publ. Inwestycja służy wsparciu efektywności energet. w budynkach Gminy Gołdap. Zakres proj. zg. z typem wspieranych projektów i przyjętych wskaź: zmniejszenie zużycia energii w budynkach, oszczędność energii elektr. i cieplnej, redukcji gazów cieplarnianych (Polish)
    0 references
    Energy renovation of the 2 buildings of Gołdap: 1. Primary School No. 1 of the Mikołaja Kopernik Integrated Departments in Gołdapi (Gołdap, ul. school 4) 2. Subschool. 2 March. Józef Piłsudskiego w Gołdai (Gołdap, ul. 1 May 25) Buildings 1903 and 1990, built in traditional, sub-standard thermal insulation works, include: — insulation of external walls and roof — replacement of external doors and windows — replacement/modernisation of heating and ventilation installations — heat pump installation -replacement of lighting — installation of solar panels — installation of solar panels; Energy generated for own account by the Municipality. optimal measures to increase the efficiency of the energy efficiency of the facilities, based on energy audits. The scale of the project in terms of technical and technological terms of design, economic and environmental design for Termoelectrica based on the technical design stage (s) of the project and the way in which the project is implemented by the Municipal Office in Gołdawill 1.OD, an investment programme, an ex-ante energy audit, technical documentation and feasibility study 2. 3.Selection of contractors according to PZP- construction work, investor supervision, promotion, ex-post audit of the 4.Implementation of work in accordance with the schedule for funding. 5.Taking delivery (minutes) of 6.Conclusion and ex-post audits of 7.Financial. In accordance with, inter alia: — Town of Gołdap Economy Plan — Transnational programme for the regeneration of the city of Cittaslow Woj. Warm-Maz — SzoOP ROP WiM- Thematic Objective 4 Supporting the transition to a low-carbon economy (...), priority for investment.4c: The promotion of energy efficiency., a smart label of energy and use in public infrastructures, (..), a specific objective: Increased efficiency in public buildings. The investment supports the energy efficiency of the municipality of Gołdap. Range of projects supported and accepted by: reducing energy consumption in buildings, saving electricity and heat, reducing greenhouse gases (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0029/18
    0 references