Improvement of energy efficiency at MB- Centre of Medicine and Recreation of M. Bykowski J. Bykowski s.c. (Q132145): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Olsztyński / rank | |||
Normal rank |
Revision as of 09:13, 17 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency at MB- Centre of Medicine and Recreation of M. Bykowski J. Bykowski s.c. |
Project in Poland financed by DG Regio |
Statements
643,875.0 zloty
0 references
757,500.0 zloty
0 references
85.0 percent
0 references
5 May 2017
0 references
30 June 2020
0 references
MB-CENTRUM MEDYCYNY I REKREACJI M. BYKOWSKA J. BYKOWSKI S.C.
0 references
Przedmiotem projektu są prac termomod. w budynku (Święta Lipka 16, 11-440 Święta Lipka, nr działki: 24/2, 33/4, 35/7, 35/9, 35/10) zakres: Docieplenie stropu pod nieogrzewanym poddaszem poprzez zastosowanie warstwy izolacji termiczne), Docieplenie podłogi poprzez zastosowanie warstwy izolacji term., Wymiana okien i drzwi na bardziej szczelne i energooszczędne modernizacja instalacji CO poprzez modyfikację kotła gazowego-zastosowanie palnika modulowanego. Modernizacja instalacji CWU poprzez modyfikację kotła gazowego-zastosowanie palnika modulowanego. Modernizacja systemu wentylacji pośrednio realizowana poprzez wymianę stolarki okiennej i drzwiowej. Modernizacja instalacji oświetlenia instalacja PV (150szt, moc 1panela 265W) Montaż kolektorów słon. (40 szt, pow. absorbera:2,35 m2, moc kolektora:560 W/m2) Szczegółowy opis w sw i zał 10. Etapy realizacji projektu: -złożenie wniosku -podpisanie umowy -wybór wykonawcy zgodnie z zasadą konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z harmonogramem -zakończenie projektu i podpisanie prot. końcowego -końcowe rozliczenie Projekt w pełni wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększona efektywność energet. w przedsiębiorstwach. Przedmiotowa inwestycja zmierza do poprawy efekt. przedsiębiorstwa. Prace przewidziane w ramach inwestycji wpisują się w typy projektów przewidzianych do realizacji oraz realizują założone do realizacji wskaźniki. Efektywność energet. (EE) leży u podstaw europejskiej polityki energet. i jest jednym z głównych celów strategii „Europa 2020” na rzecz inteligentnego, zrównoważonego wzrostu sprzyjającego włączeniu społecznemu.Efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gosp.i niskoemisyjnej i walki ze zmianami klimatycznymi. Inwestycja na rzecz efekt. energetycznej w budynku przynosi znaczne oszczędności energii, jednocześnie wspierając wzrost gosp. i zrównoważony rozw. (Polish)
0 references
The project covers the work of thermo-fashion in the building (Holy See Lipka 16, 11-440 St Lipka, parcel number: 24/2, 33/4, 35/7, 35/9, 35/10) Heat insulation of the ceiling by applying the thermal insulation layer of the floor, insulation of the floor by applying a layer of insulation of the floor., replacement of windows and doors for more tight and energy efficient retrofitting of CO by modifying the gas boiler and the application of the modulated burner. Modernisation of the CWU installation by modifying the gas boiler and the application of the modulated burner. Modernisation of the ventilation system indirectly through the replacement of window and door frames. Installation of the installation of the installation PV (150szt, power 1-265HW) Montage of elephant collectors. (40 pt,: absorbera:2,35 m², power kolektora:560 W/m²) Detailed description in sw and zoned 10. The phases of the implementation of the project: — submission of the application — signature of contract — selection of contractor in accordance with the contract rule. Conclusion of the contract with the contractor and start of works, in accordance with the schedule -end of the project and signature of the final bill, the final statement is fully in line with the assumed objective of the project: Increased efficiency in companies. The investment in question aims to improve the impact of the undertaking. The work envisaged within the framework of the investment is in line with the types of projects to be implemented and is carried out in order to implement the indicators. Energy efficiency. (EE) is at the heart of Europe’s energy policy and is one of the main objectives of the Europe 2020 strategy for smart, sustainable and inclusive growth. efficient energy consumption can make a significant contribution to achieving the goal of achieving low carbon and low emissions and combating climate change. The investment in favour of the energy efficiency of the building yields significant energy savings, while supporting growth and sustainability. (English)
0 references
Identifiers
RPWM.04.02.00-28-0016/18
0 references