ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018 (Q2074841): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Province of Treviso / rank
 
Normal rank

Revision as of 06:55, 17 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018
Project in Italy financed by DG Regio

    Statements

    0 references
    44,436.68 Euro
    0 references
    88,873.37 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    11 July 2019
    0 references
    14 December 2018
    0 references
    MASCHIETTO MARIO EREDI S.R.L.
    0 references
    0 references
    0 references

    45°53'26.70"N, 12°20'1.82"E
    0 references
    INTERVENTI FINALIZZATI ALLA RIDUZIONE DEI CONSUMI ENERGETICI E DELLE EMISSIONI DI GAS CLIMALTERANTI DELL'IMPRESA CON PRIORITA' ALLE TECNOLOGIE AD ALTA EFFICIENZA COMPRENDENTE: - INSTALLAZIONE DI SISTEMA COGENERATORE DI 100 KW ELETTRICI; - SOSTITUZIONE DELLE LAMPADE ESISTENTI CON LAMPADE EQUIVALENTI A LED; - INSTALLAZIONE DI SISTEMA DI MONITORAGGIO CONSUMI E PRODUZIONE PUNTUALE; - INSTALLAZIONE DI NR. 2 ECONOMIZZATORI DI RETE; - INSTALLAZIONE DI IMPIANTO SOLARE FOTOVOLTAICO; - INSTALLAZIONE DI SISTEMA DI RIFASAMENTO. (Italian)
    0 references
    MEASURES TO REDUCE ENERGY CONSUMPTION AND EMISSIONS OF CLIMATE-CHANGING GASES INTO HIGH-EFFICIENCY TECHNOLOGIES INCLUDING: — CHP SYSTEM INSTALLATION OF 100 KW; REPLACING EXISTING LAMPS WITH EQUIVALENT LED LAMPS; — INSTALLATION OF DETAILED CONSUMPTION AND PRODUCTION MONITORING SYSTEM; — INSTALLATION OF 2 ECONOMISERS; INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM; — RECASTING SYSTEM INSTALLATION. (English)
    0 references

    Identifiers

    B37B18000110009
    0 references