Increasing the efficiency of medical services for anaesthetics and intensive care by investing in infrastructure and equipment at the coast of the Medical Centre. (Q115631): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Nyski / rank | |||
Normal rank |
Revision as of 04:29, 17 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the efficiency of medical services for anaesthetics and intensive care by investing in infrastructure and equipment at the coast of the Medical Centre. |
Project in Poland financed by DG Regio |
Statements
3,652,342.44 zloty
0 references
4,296,873.46 zloty
0 references
1,031,249.6303999999 Euro
0.24 Euro
13 January 2020
0 references
85.0 percent
0 references
2 January 2018
0 references
31 December 2019
0 references
SP ZOZ BRZESKIE CENTRUM MEDYCZNE
0 references
Planowana inwestycja realizowana będzie na Oddziale anestezjologii i intensywnej terapii w Brzeskim Centrum Medycznym. Przedmiotem projektu będzie: 1. Przebudowa OAIiT, stworzenie odrębnego pomieszczenia magazynowego (magazyn sprzętu i aparatury, magazyn bielizny czystej), 2. Przebudowa istniejącej infrastruktury oddziału oraz modernizacja i dostosowanie instalacji wewnętrznych do nowych warunków, 3. Zakup na oddział niezbędnego sprzętu medycznego, 4. Zwiększenie ilości łóżek na oddziale z 4 do 6 sztuk. Efektem projektu będzie: 1. Zwiększenie ilości łóżek na Oddziale 4 na 6, w tym 1 łóżko w izolatce, dzięki czemu oddział zostanie dostosowany do wymogów prawnych (Rozporządzenie Ministra Zdrowia z dnia 20 grudnia 2012 r. w sprawie standardów postępowania medycznego w dziedzinie anestezjologii i intensywnej terapii dla podmiotów wykonujących działalność leczniczą (Dz. U. z 2013 r. poz. 15), zaleceń z Mapy potrzeb zdrowotnych w zakresie lecznictwa szpitalnego (dla OAiIT) oraz rzeczywistych potrzeb szpitala i mieszkańców powiatu brzeskiego oraz ościennych powiatów (powiat kluczborski i namysłowski, na terenie których nie funkcjonują oddziały OIOM). 2. Stworzenie odrębnego pomieszczenia magazynowego, dotychczas nie posiadanego przez OAiIT, przyczyni się do usprawnienie funkcjonowania oddziału, optymalizacji pracy, poprawy warunków pracy oraz warunków higienicznych. 3. Wzrost bezpieczeństwa i komfortu korzystania z usług zdrowotnych oraz jakość otrzymywanej opieki zdrowotnej, który nastąpi dzięki modernizacji OAiIT oraz wyposażeniu go w wysokiej klasy aparaturę medyczną. 4. Możliwość wykonania natychmiastowych, precyzyjnych, wstępnych badań diagnostycznych oraz większa różnorodność wykonywanych procedur medycznych, dzięki nowej aparaturze medycznej. Produkty projektu: Liczba wspartych podmiotów leczniczych - 1 szt. Nakłady inwestycyjne na zakup aparatury medycznej - 3 546 134,78 PLN Liczba szpitali objętych wsparciem w programie świadczących usługi zdrowotne (Polish)
0 references
The planned investment will be carried out at the Medical Service of anaesthetics and intensive care. The project will: 1. Reconstruction of the OAimitT, creation of a separate storage facility (storage of equipment and apparatus, warehouse of clean linen), 2. Rebuilding of the existing infrastructure of the branch and upgrading and adapting the internal installation to the new conditions, 3. Purchase of necessary medical equipment to a branch, 4. Increasing the number of beds in the branch from 4 to 6 units. The result of the project will be to: 1. Increasing the number of beds per 4 for 6, including 1 bed in solitary confinement, which will make the branch compatible with the legal requirements (Regulation of the Minister for Health of 20 December 2012 on medical treatment standards in anaesthetics and intensive care (Dz. (Polish Journal of Laws of 2013, item 15), the hospital hospital care needs recommendations (for OAiIT) and the real needs of the hospital and residents of the Brest district and the surrounding districts (the district of the central and reflection districts over which they do not have their respective branches). 2. The creation of a separate storage facility, so far not owned by OAiIT, will help to improve the functioning of the branch, optimise work, improve working conditions and hygiene conditions. 3. Increase the safety and comfort of the use of health services and the quality of the healthcare received, which will be facilitated by the upgrading of OAiIT and equipping it with high quality medical equipment. 4. The possibility to carry out immediate, precise, initial diagnostic tests and a greater variety of medical procedures, with a new medical apparatus. Products of the project: Number of healthcare establishments supported — 1 Investment in the purchase of medical equipment — PLN 3 546 134,78 Number of hospital assisted hospitals (English)
0 references
Identifiers
RPOP.10.01.01-16-0006/17
0 references