(10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE (Q2056970): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Florence / rank | |||
Normal rank |
Revision as of 03:23, 17 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE |
Project in Italy financed by DG Regio |
Statements
468,784.15 Euro
0 references
1,186,795.31 Euro
0 references
39.5 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
AMMINISTRAZIONE PROVINCIALE DI SIENA
0 references
IL PROGETTO PREVEDE INTERVENTI DI MIGLIORAMENTO IN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE DI SERRAMENTI E INFISSI DEL LOTTO 1.L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELLE FINESTRE A UW=1,5W/M2K E DELLE PORTEFINESTRE A UW =1,615W/M2K.LE LAVORAZIONI SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO PREVISTO NELL?INTERVENTO N.1, SMONTAGGIO INFISSI, RIMONTAGGIO NUOVI INFISSIINTERVENTO N.2: ISOLAMENTO TERMICO SOLAIO DI COPERTURA DEL LOTTO 1. L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,188 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.06 W/M2K. IL PROGETTO PREVEDE LA POSA DI 18 CM DI LANA DI ROCCIA AD ALTA DENSIT? E SUCCESSIVA POSA DI GUAINA IMPERMEABILIZZANTE. VISTA L?ESTENSIONE DELLE COPERTURE,LE STESSE SI POSSONO SUDDIVIDERE IN 6 ZONE IN BASE ALL?ALTEZZA E SUPERFICIE.LE ZONE DEFINIRANNO LE FASI TEMPORALI DELL?INTERVENTO CHE SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO, DEMOLIZIONE VECCHIA GUAI (Italian)
0 references
DOES THE PROJECT ENVISAGE IMPROVEMENT MEASURES IN PARTICULAR: INTERVENTON.1: WINDOW FRAMES AND WINDOW FRAMES OF 1.L? OBJECTIVE? TO REDUCE LOSSES BY BRINGING THE TRANSMITTANCE OF WINDOWS INTO UW = 1,5W/M2K AND WINDOWS AT UW = 1,615W/M2K.WERE FURTHER COS? TO SUMMARISE: INSTALLATION OF SCAFFOLDING, WHICH MUST BE ENCLOSED? MEASURE NO 1, DISMANTLING OF FIXTURES AND FITTINGS, REASSEMBLING NEW FIXTURES AND FITTINGS, AND 2: STANDARD HEAT INSULATION OF THE COVER OF LOT 1. OBJECTIVE? REDUCE LOSSES BY BRINGING THE TRANSMITTANCE AT 0,188 W/M2K, AND THE SUMMER THERMAL LOSSES BY BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.06 W/M2K. DOES THE PROJECT INVOLVE 18 CM OF SHAPIT WOOL? AND SUBSEQUENT RELEASE OF A WATERPROOF CASING. IN VIEW OF THE EXTENSION OF THE COVER, CAN THEY BE DIVIDED INTO 6 ZONES ACCORDING TO THE HEIGHT AND SUPERIFIEI ZONES WILL DEFINE THE TIME STAGES OF THE OPERATION, WHICH CAN BE COS? TO SUMMARISE: SCAFFOLDING, DEMOLITION AND DEMOLITION (English)
0 references
Identifiers
B62G18000240005
0 references