Risk analysis of the impact of the former pump station and of the PHM on the drinking water source for the Pičín local primary and parent school and impact on the water manager of the planer (Q62275): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Central Bohemian Region / rank
 
Normal rank

Revision as of 01:35, 17 July 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Risk analysis of the impact of the former pump station and of the PHM on the drinking water source for the Pičín local primary and parent school and impact on the water manager of the planer
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,430,898.5 Czech koruna
    0 references
    57,235.94 Euro
    10 January 2020
    0 references
    1,683,410.0 Czech koruna
    0 references
    67,336.4 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    17 October 2016
    0 references
    13 September 2017
    0 references
    30 September 2017
    0 references
    Kolařík Hluboš, spol. s r.o.
    0 references
    0 references
    0 references

    49°44'44.81"N, 14°3'23.26"E
    0 references
    26225
    0 references
    Předmětem projektu je získání dat a informací o míře a rozsahu kontaminace horninového prostředí, podzemních a povrchových vod v důsledku existence staré ekologické zátěže v místě bývalé čerpací stanice pohonných hmot v areálu společnosti Kolařík Hluboš v Pičíně. (Czech)
    0 references
    The purpose of the project is to obtain data and information on the extent and extent of contamination of the rock environment, groundwater and surface water as a result of the existence of an old environmental ballast in the site of the former fuel station at Kolřík Hluboš in Pisa. (English)
    0 references

    Identifiers

    CZ.05.3.24/0.0/0.0/15_007/0000440
    0 references