Thermal modernisation of educational buildings in the municipality of Siedlce (Q108938): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Siedlecki / rank | |||
Normal rank |
Revision as of 16:44, 16 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of educational buildings in the municipality of Siedlce |
Project in Poland financed by DG Regio |
Statements
5,476,705.92 zloty
0 references
6,845,882.41 zloty
0 references
80.0 percent
0 references
23 December 2015
0 references
15 December 2018
0 references
GMINA SIEDLCE
0 references
Projekt obejmuje zadania inwestycyjne polegające na wykonaniu prac termomodernizacyjnych w siedmiu budynkach użyteczności publicznej w: ZO-W w Białkach, ZO w Golicach, ZO w Nowych Iganiach, ZO w Pruszynie, ZO w Stoku Lackim, ZO-W w Strzale, ZO w Żelkowie - Kolonii znajdujących się na terenie Gminy Siedlce, w powiecie siedleckim, woj. mazowieckim. Obecny stan techniczny budynków objętych projektem jest zły, występują duże straty ciepła i gmina ponosi wysokie koszty ogrzewania oraz wysokie koszty opłat ze energię elektryczną. W każdym z Zespołów Oświatowych przewidziano następujące prace: docieplenie obiektu- przegród zewnętrznych, w tym ścian zewnętrznych, dachów lub stropodachów, wymianę okien, wymianę drzwi zewnętrznych, instalację OZE w postaci paneli fotowoltaicznych w 5 Zespołach oraz wymianę opraw i źródeł światła na energooszczędne LED. Ponadto w ZO Golicach, Pruszynie, Strzale przewidziano docieplenie podłogi na gruncie. W wyniku realizacji projektu 7 budynków o łącznej kubaturze 49 645,73 m3, zostanie poddane pracom głębokiej termomodernizacji. W wyniku podjętych prac zaoszczędzone zostanie 2571263 kWh/rok energii. Projekt będzie realizowany w formule zaprojektuj i wybuduj. Wybór wykonawcy zostanie dokonany zgodnie z ustawą PZP. Po podpisaniu umowy przystąpi on do przygotowania dokumentacji projektowej, uzyska wymagane prawem pozwolenia, a następnie przystąpi do wykonania prac budowlanych. Zgodnie z ustawą PZP nastąpi wybór inspektora nadzoru, który będzie na bieżąco nadzorował prowadzone prace i odpowiadał za prawidłową realizację projektu. Ze strony gminy zostanie wyznaczony pracownik merytoryczny, który będzie nadzorował prawidłowy przebieg prac wykonawcy i inspektora. Grupą docelową projektu zgodnie z SZOOP RPO WM 2014-2020 będą mieszkańcy województwa mazowieckiego, w tym z terenu gminy Siedlce oraz siedem Zespołów Oświatowych znajdujących się na terenie gminy Siedlce zainteresowanych poprawą efektywności energetycznej infrastruktury publicznej. (Polish)
0 references
The project covers investment tasks consisting of the completion of thermal modernisation works in seven public buildings: ZO-W in proteins, the GA in Goliice, the GA in the New Igaów, the GA in Pruszynie, the ZO W in Lackim, ZO-W on the arrows, the GA in Żelków — Cologne located in the municipality of Siedlce, in the county of Siedlce, Mazowieckie province. The current technical state of the buildings covered by the project is poor, there are large heat losses and the municipality has high heating costs and high costs of heating charges. The following works are foreseen in each OWG: thermal insulation of the circuits, including external walls, roofs or tuning, replacement of windows, replacement of external doors, RES installation in the form of solar panels in 5 teams and replacement of luminaires and light sources on energy-efficient LED. In addition, in the GA Golicice, Pruszynie, the arrows were designed to provide a floor on the ground. As a result of the project, 7 buildings with a total volume of 49 645.73 m³ will undergo deep thermal modernisation. As a result of the work undertaken, 2 571 263 kWh/year will be saved. The project will be carried out in design and demolition. The contractor will be selected in accordance with the Law of the Public Procurement Act. Once the contract is signed, it will enter into the preparation of the project documentation, obtain the authorisation required by law and then proceed to the construction of the works. According to the Law of the Public Procurement Act, a supervisory inspector will be selected and will monitor the work carried out and be responsible for the correct implementation of the project. On the part of the municipality, a policy officer will be appointed to supervise the proper conduct of the contractor and the inspector. The target group of the project in accordance with the SZOOP ROP MP 2014-2020 will be for the inhabitants of the Mazowieckie Region, including the municipality of Siedlce and seven OWWTS located in the municipality of Siedlce interested in improving the energy efficiency of the public infrastructure. (English)
0 references
Identifiers
RPMA.04.02.00-14-4536/16
0 references