DESIGN AND CONTROL OF PRODUCTION (Q2072419): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Aosta Valley / rank
 
Normal rank

Revision as of 07:31, 16 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
DESIGN AND CONTROL OF PRODUCTION
Project in Italy financed by DG Regio

    Statements

    0 references
    7,000.0 Euro
    0 references
    14,000.0 Euro
    0 references
    50.0 percent
    0 references
    11 April 2019
    0 references
    31 October 2019
    0 references
    VALLEE TRAFOR SRL
    0 references
    0 references

    45°44'13.52"N, 7°19'10.78"E
    0 references
    IL PROGETTO PROPOSTO HA COME SCOPO LA REALIZZAZIONE DI UN SISTEMA DI PIANIFICAZIONE E CONTROLLO DELLA PRODUZIONE. L¿OBIETTIVO PRIMARIO RISULTA ESSERE L¿OTTIMIZZARE DELL¿UTILIZZO DELLE RISORSE UMANE ALLO SCOPO DI MASSIMIZZARE IL LIVELLO DI SERVIZIO AI CLIENTI IN TERMINI DI RAPIDITà, FLESSIBILITà E RISPETTO DELLE DATE DI CONSEGNA.IL SISTEMA DI PIANIFICAZIONE PRODUTTIVA RIVESTE UN RUOLO FONDAMENTALE DI COLLEGAMENTO TRA I CLIENTI ED IL SISTEMA PRODUTTIVO, E DEVE ASSICURARE CHE LE RISORSE PRODUTTIVE ESISTENTI, TENENDO CONTO DEI LORO LIMITI E DEI LORO VINCOLI, SIANO SFRUTTATE IN MODO OTTIMALE.UN EFFICACE SISTEMA DI PIANIFICAZIONE DELLA PRODUZIONE HA COME OBIETTIVI:-RECEPIRE RAPIDAMENTE GLI ORDINI DI PRODUZIONE-SCHEDULARE GLI ORDINI DI LAVORO SULLE RISORSE PRODUTTIVE IN ACCORDO CON I VINCOLI INTERNI (TEMPI DI ATTRAVERSAMENTO, CAPACITà PRODUTTIVA E COLLI DI BOTTIGLIA ETC.)-MONITORARE L¿AVANZAMENTO REALE RISPETTO A QUELLO PIANIFICATO-CONTROLLARE IL RISPETTO DELLE DATE DI CONSEGNA PAT (Italian)
    0 references
    THE AIM OF THE PROPOSED PROJECT IS TO SET UP A SYSTEM OF PRODUCTION CONTROL AND PLANNING. THIS AIM IS TO ENSURE THAT THE PRODUCTION PLANNING SYSTEM PLAYS A KEY ROLE IN CONNECTING CUSTOMERS AND THE PRODUCTION SYSTEM, AND TO ENSURE THAT EXISTING PRODUCTION RESOURCES, TAKING ACCOUNT OF THEIR LIMITS AND CONSTRAINTS, ARE BEING EXPLOITED IN AN INTEGRAL WAY, TAKING ACCOUNT OF THEIR LIMITS AND CONSTRAINTS, AND THAT THE PRODUCTION PLANNING SYSTEM IS AN EFFICIENT SYSTEM OF PRODUCTION PLANNING, HAS AS ITS OBJECTIVE: -RECEPARING THE ORDERS FOR WORKING ON PRODUCTIVE RESOURCES IN ACCORDANCE WITH THE INTERNAL CONSTRAINTS (CROSSING TIMES, PRODUCTION CAPACITIES AND BOTTLENECKS, ETC.) -MONITORING TOWARDS REAL PROGRESS COMPARED TO THE OBJECTIVES OF THE IMPLEMENTATION OF THE DATES OF DELIVERY OF THE PROVINCE OF TRENTO. (English)
    0 references

    Identifiers

    B69J19000050007
    0 references