Thermal modernisation of the building of the rural community in Drągowinie. (Q100310): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Zielonogórski / rank | |||
Normal rank |
Revision as of 04:52, 16 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building of the rural community in Drągowinie. |
Project in Poland financed by DG Regio |
Statements
632,097.1 zloty
0 references
743,643.71 zloty
0 references
85.0 percent
0 references
3 April 2017
0 references
31 December 2019
0 references
GMINA NOWOGRÓD BOBRZAŃSKI
0 references
Przedmiotem projektu jest głęboka termomodernizacja budynku świetlicy wiejskiej w miejscowości Drągowina. Projekt obejmuje: ocieplenie ścian i stropodachu, wykonanie utwardzenia wokół budynku świetlicy, wymiana obróbek blacharskich, wymiana stolarki okiennej, wykonanie instalacji CO i CW wraz z zasilaniem i montażem pomp ciepła, wykonanie instalacji rekuperacji wraz z rekuperatorem, montaż automatyki do sterowania systemem c.o z wykorzystaniem TIK, wymianę oświetlenia na oświetlenie LED. Gr. docelowe: mieszkańcy G. Nowogród Bobrzański, użytkownicy świetlicy wiejskiej w Drągowinie, władze G. Nowogród Bobrzański, instytucje systemu ochrony środowiska. Główny cel: Poprawa efektywności energetycznej w sektorze budynków użyteczności publicznej na obszarze Gminy Nowogród Bobrzański poprzez optymalizację gospodarki energetycznej w budynkach publicznych w m. Drągowina. Cele szczeg: Zmniejszenie zapotrzebowania na energię pierwotną; Redukcja emisji CO2; Optymalizacja zużycia energii elektrycznej; Zwiększenie wykorzystania OZE. W. produktu: L. zmodern. energetycznie bud.: 1 szt. Dod. zdolność wyt. e. c. ze źr. odnawialnych: 0,02 MWt Dod. zdolność wyt. e. el. ze źr. odnawialnych: 0,005 MWe L. podm. wykorzystujących techn. inform.-komun.: 1 szt. L. wyb. jednostek wytw. e. cieplnej z OZE: 1 szt. L. wyb. jednostek wytw. e. elektrycznej z OZE: 1 szt. L. zmodern. źr. ciepła: 1 Szt. Pow. użytkowa bud. poddanych termomod.: 323,41 mkw Udz. proj. w odn. do obszaru objętego progr. rewit.: 0,00345% W. rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 53,13 t. równ. CO2/rok Zmn. rocznego zużycia e. pierw. w bud. publ. (CI 32): 471 700,00 kWh/rok Il. zaoszczę. e. cieplnej: 474,71 GJ/rok Il. zaoszcz. e. elektrycznej: 5,36 MWh/rok Prod. e. c. z nowo wybud. inst. wyk. OZE: 454,25 MWht/rok Prod. e. ele. z nowo wybud. inst. wyk. OZE: 5,00 MWhe/rok Zmn. zużycia e. końcowej w wyniku real. proj.: 427,08 GJ/rok Wzr. zatr.: 1 EPC Wzr. zatr.– kobiety: 0 EPC · Wzr. zatr. (Polish)
0 references
The object of the project is the deep thermal renovation of the building of the rural community in the municipality of Drągowina. The project includes: insulation of walls and flat wall, construction of hardened wall around the building centre, replacement of glazing frames, replacement of window frames, performance of CO and CW installations with supply and installation of heat pumps, installation of recuperation facilities including a recuperator, installation of automation at the control of the telecommunication system using ICT, replacement of lighting on LED lighting. GR. target: residents of G. Novgorod Bobrzański, users of the village community in Drągowyn, authorities of G. Novgorod Bobrzański, authorities of the environmental protection system. Main objective: Improvement of energy efficiency in the public buildings sector in the Bobrzański Municipality area through the optimisation of the energy economy in public buildings in the Community. The objectives of the following are: Reducing the demand for primary energy; Reduction of CO2 emissions; Optimisation of electricity consumption; Increased use of RES. The product: L. energy budget: 1 units Addition: 0,02 MWt added. 0,005 MWe L., using technn. inform-communal: 1 units L. Releases of renewable heating units: 1 units L. Releases of electricity from RES: 1 units L. of moderation of heat: 1 unit. Formulation used. 323.41 mm for renewal area for the area covered by the project: 0.00345 % W. result: Estimated annual reduction in emissions of g. (CI 34): 53.13 t plain. CO2/rok annual consumption reductions were made in public pul. (CI 32): 471 700.00 kWh/year. 474,71 GJ/year Quantities saved. 5.36 MWh/year. e c. rebuilt. RES: 454,25 MWHT/year. e. e. green. RES: 5,00 MWhe/year of consumption. final as a result of the action: 427,08 GJ/year 1 EPC Standard for women: 0 FTE· r. (English)
0 references
Identifiers
RPLB.03.02.01-08-0026/18
0 references