MUNICIPALITY OF CASAMGOVE — COMPLETION AND FUNCTIONAL UPGRADING OF THE WATER DISTRIBUTION SYSTEM ON MUNICIPAL TERRITORY — 1° — COMPLETION OF A TANK (Q2023100): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Caserta / rank | |||
Normal rank |
Revision as of 14:14, 15 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MUNICIPALITY OF CASAMGOVE — COMPLETION AND FUNCTIONAL UPGRADING OF THE WATER DISTRIBUTION SYSTEM ON MUNICIPAL TERRITORY — 1° — COMPLETION OF A TANK |
Project in Italy financed by DG Regio |
Statements
1,398,246.42 Euro
0 references
1,398,246.42 Euro
0 references
100.0 percent
0 references
1 December 2013
0 references
16 December 2015
0 references
COMUNE DI CASAGIOVE
0 references
IL COMUNE DI CASAGIOVE AVVIò LA COSTRUZIONE DI UN SERBATOIO DI ACCUMULO A MONTE DEI POZZI ESISTENTI IN LOCALITà MONTECUPO. IL SERBATOIO POSTO ALLA QUOTA DI CIRCA 115.00 MT GARANTIRà , UNA VOLTA COMPLETATI, IL CARICO IDRAULICO NECESSARIO ANCHE AI PUNTI PIù ALTI PRESENTI SUL TERRITORIO COMUNALE. IL SERBATOIO Ê COMPOSTO DA UNA UNICA VASCA CON UN VOLUME D'ACQUA SFRUTTABILE COMPLESSIVO DI CIRCA 2.000 MC AVREBBE DOVUTO SVOLGERE LE FUNZIONI DI ACCUMULO E COMPENSAZIONE DEL CONSUMO NELLE ORE DI PUNTA. IL SERBATOIO DOVEVA ESSERE ALIMENTATO DAI POZZI ATTUALMENTE IN FUNZIONE ED UBICATI ALLA BASE DELLO STESSO. ATTUALMENTE IL MANUFATTO Ê STATO COMPLETATO NELLA STRUTTURA PORTANTE E PER TALE MOTIVO NON Ê MAI ENTRATO IN FUNZIONE LASCIANDO INALTERATI I PROBLEMI DELLA RETE IDRICA DI CASAGIOVE. CON IL PRESENTE PROGETTO SI PROVVEDERà A COMPLETARE LE OPERE EDILI DEL SERBATOIO, COLLEGARE LO STESSO AI POZZI E ALLA RETE ESISTENTE, INSTALLARE LE APPARECCHIATURE DI SOLLEVAMENTO NONCHé QUELLE DI GESTIONE (Italian)
0 references
THE MUNICIPALITY OF CASAGIOVE AVVIò THE CONSTRUCTION OF AN ACCUMULATION TANK UPSTREAM OF THE EXISTING WELLS IN LOCALITING MONTECUPO. THE TANK FOR THE SHARE OF APPROXIMATELY 115.00 MT WILL ENSURE, ONCE COMPLETED, THE HYDRAULIC LOAD WHICH IS ALSO REQUIRED AT THE TOP SECTIONS OF THE MUNICIPALITY. THE WHOLE BODY OF THE TANK IS COMPOSED OF A SINGLE TANK WITH AN OVERALL VOLUME OF APPROXIMATELY 2.000 M³ OF WATER. IT SHOULD HAVE PERFORMED THE FUNCTIONS OF ACCUMULATION AND BALANCING OF CONSUMPTION DURING PEAK HOURS. THE TANK WAS TO BE FED BY THE WELLS CURRENTLY IN OPERATION AND LOCATED AT THE BOTTOM OF THE TANK. AT THE MOMENT, THE BODY HAS BEEN COMPLETED IN THE FRAME AND FOR THIS REASON THAT IT HAS NEVER ENTERED INTO OPERATION, LEAVING THE PROBLEMS OF THE WATER NETWORK IN CASANIOVE UNCHANGED. WITH THIS PROJECT WE WILL COMPLETE THE BUILDING WORKS OF THE TANK, CONNECT THE EQUIPMENT TO THE EXISTING WELLS AND THE EXISTING NETWORK, INSTALL THE EQUIPMENT FOR LIFTING AND RUNNING THE EQUIPMENT © MANAGEMENT EQUIPMENT. (English)
0 references
Identifiers
I74F14000000002
0 references