Construction of the Bydgoszcz West – Piła Krzewina line with the extension of the station in this line (Q84409): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project included the construction of a two-track line 400 kV Bydgoszcz West – Piła Krzewina and the expansion of Bydgoszcz West station. The line route is located in the voivodships: Wielkopolskie and Kujawsko-Pomorskie, communes: White Mud, Sicienko, Notebook, Dark, Sadki, Wyrzysk, Białośliwie, High, Krajeńskie Town, Ducks. Power station 220/110 kV Bydgoszcz West is located in Lipniki in the Białe Błota commune, in Bydgoszcz County, Kujawsk...)
(‎Changed label, description and/or aliases in pt)
 
(27 intermediate revisions by 2 users not shown)
label / enlabel / en
Construction of the Bydgoszcz West Piła Krzina line together with the extension of the station within that line.
Construction of the Bydgoszcz West Piła Krzewina line with the extension of the station in this line
label / frlabel / fr
 
Construction de la ligne Bydgoszcz Zachód — Piła Krzewina ainsi que l’agrandissement de la gare de cette ligne
label / delabel / de
 
Bau der Linie Bydgoszcz Zachód – Piła Krzewina zusammen mit der Erweiterung des Bahnhofs in dieser Linie
label / nllabel / nl
 
Bouw van de Bydgoszcz Zachód — Piła Krzewina lijn samen met de uitbreiding van het station in deze lijn
label / itlabel / it
 
Costruzione della linea Bydgoszcz Zachód — Piła Krzewina insieme all'ampliamento della stazione in questa linea
label / eslabel / es
 
Construcción de la línea Bydgoszcz Zachód — Piła Krzewina junto con la ampliación de la estación en esta línea
label / dalabel / da
 
Opførelse af Bydgoszcz Zachód — Piła Krzewina linje sammen med udvidelsen af stationen i denne linje
label / ellabel / el
 
Κατασκευή της γραμμής Bydgoszcz Zachód — Piła Krzewina μαζί με την επέκταση του σταθμού σε αυτή τη γραμμή
label / hrlabel / hr
 
Izgradnja linije Bydgoszcz Zachód – Piła Krzewina uz proširenje postaje u ovoj liniji
label / rolabel / ro
 
Construcția liniei Bydgoszcz Zachód – Piła Krzewina împreună cu extinderea stației în această linie
label / sklabel / sk
 
Výstavba linky Bydgoszcz Zachód – Piła Krzewina spolu s rozšírením stanice na tejto linke
label / mtlabel / mt
 
Kostruzzjoni tal-linja Bydgoszcz Zachód — Piła Krzewina flimkien mal-espansjoni tal-istazzjon f’din il-linja
label / ptlabel / pt
 
Construção da linha Bydgoszcz West – Piła Krzewina com a extensão da estação nesta linha
label / filabel / fi
 
Bydgoszcz Zachód – Piła Krzewina -linjan rakentaminen sekä aseman laajentaminen tällä linjalla
label / sllabel / sl
 
Gradnja linije Bydgoszcz Zachód – Piła Krzewina skupaj s širitvijo postaje v tej liniji
label / cslabel / cs
 
Výstavba linky Bydgoszcz Zachód – Piła Krzewina spolu s rozšířením stanice v této lince
label / ltlabel / lt
 
Bydgoszcz Zachód – Piła Krzewina linijos tiesimas kartu su stoties plėtra šioje linijoje
label / lvlabel / lv
 
Bydgoszcz Zachód — Piła Krzewina līnijas būvniecība kopā ar stacijas paplašināšanu šajā līnijā
label / bglabel / bg
 
Изграждане на линията Bydgoszcz Zachód — Piła Krzewina заедно с разширяването на станцията в тази линия
label / hulabel / hu
 
A Bydgoszcz Zachód – Piła Krzewina vonal építése, valamint az állomás bővítése ebben a vonalban
label / galabel / ga
 
Tógáil an líne Bydgoszcz Zachód — Piła Krzewina chomh maith le leathnú an stáisiúin sa líne seo
label / svlabel / sv
 
Byggandet av Bydgoszcz Zachód – Piła Krzewina linjen tillsammans med utbyggnaden av stationen i denna linje
label / etlabel / et
 
Bydgoszcz Zachód-Piła Krzewina liini ehitamine koos jaama laiendamisega sellel liinil
description / endescription / en
Project in Poland financed by DG Regio
Project Q84409 in Poland
description / pldescription / pl
Projekt w Polsce finansowany przez DG Regio
Projekt Q84409 w Polsce
description / bgdescription / bg
 
Проект Q84409 в Полша
description / hrdescription / hr
 
Projekt Q84409 u Poljskoj
description / hudescription / hu
 
Projekt Q84409 Lengyelországban
description / csdescription / cs
 
Projekt Q84409 v Polsku
description / dadescription / da
 
Projekt Q84409 i Polen
description / nldescription / nl
 
Project Q84409 in Polen
description / etdescription / et
 
Projekt Q84409 Poolas
description / fidescription / fi
 
Projekti Q84409 Puolassa
description / frdescription / fr
 
Projet Q84409 en Pologne
description / dedescription / de
 
Projekt Q84409 in Polen
description / eldescription / el
 
Έργο Q84409 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q84409 sa Pholainn
description / itdescription / it
 
Progetto Q84409 in Polonia
description / lvdescription / lv
 
Projekts Q84409 Polijā
description / ltdescription / lt
 
Projektas Q84409 Lenkijoje
description / mtdescription / mt
 
Proġett Q84409 fil-Polonja
description / ptdescription / pt
 
Projeto Q84409 na Polônia
description / rodescription / ro
 
Proiectul Q84409 în Polonia
description / skdescription / sk
 
Projekt Q84409 v Poľsku
description / sldescription / sl
 
Projekt Q84409 na Poljskem
description / esdescription / es
 
Proyecto Q84409 en Polonia
description / svdescription / sv
 
Projekt Q84409 i Polen
Property / EU contributionProperty / EU contribution
17,124,517.99 Euro
Amount17,124,517.99 Euro
UnitEuro
15,861,584.79 Euro
Amount15,861,584.79 Euro
UnitEuro
Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / beneficiary name (string)
POLSKIE SIECI ELEKTROENERGETYCZNE S.A
 
Property / beneficiary name (string): POLSKIE SIECI ELEKTROENERGETYCZNE S.A / rank
Normal rank
 
Property / summary: The project included the construction of a two-track line 400 kV Bydgoszcz West – Piła Krzewina and the expansion of Bydgoszcz West station. The line route is located in the voivodships: Wielkopolskie and Kujawsko-Pomorskie, communes: White Mud, Sicienko, Notebook, Dark, Sadki, Wyrzysk, Białośliwie, High, Krajeńskie Town, Ducks. Power station 220/110 kV Bydgoszcz West is located in Lipniki in the Białe Błota commune, in Bydgoszcz County, Kujawsko-Pomorskie Voivodeship. The project is implemented in a less developed area. (English) / qualifier
 
readability score: 0.7181822574081379
Amount0.7181822574081379
Unit1
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Polskie Sieci Elektroenergetyczne / rank
Normal rank
 
Property / budgetProperty / budget
17,124,517.99 Euro
Amount17,124,517.99 Euro
UnitEuro
15,861,584.79 Euro
Amount15,861,584.79 Euro
UnitEuro
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Sicienko / rank
 
Normal rank
Property / contained in Local Administrative Unit: Sicienko / qualifier
 
Property / summary
 
Dans le cadre du projet, la construction d’une ligne à deux voies de 400 kV Bydgoszcz Zachód — Piła Krzewina et l’extension de la station Bydgoszcz Zachód. L’itinéraire de la ligne est situé dans les voïvodies: Wielkopolski et Kujawsko-Pomorskie, municipalités: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La centrale électrique 220/110 kV Bydgoszcz Zachód est située à Lipniki, dans la municipalité de Białe Błota, dans le district de Bydgoszcz, dans la voïvodie de Kujawsko-Pomorskie. Le projet est mis en œuvre dans une zone moins développée. (French)
Property / summary: Dans le cadre du projet, la construction d’une ligne à deux voies de 400 kV Bydgoszcz Zachód — Piła Krzewina et l’extension de la station Bydgoszcz Zachód. L’itinéraire de la ligne est situé dans les voïvodies: Wielkopolski et Kujawsko-Pomorskie, municipalités: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La centrale électrique 220/110 kV Bydgoszcz Zachód est située à Lipniki, dans la municipalité de Białe Błota, dans le district de Bydgoszcz, dans la voïvodie de Kujawsko-Pomorskie. Le projet est mis en œuvre dans une zone moins développée. (French) / rank
 
Normal rank
Property / summary: Dans le cadre du projet, la construction d’une ligne à deux voies de 400 kV Bydgoszcz Zachód — Piła Krzewina et l’extension de la station Bydgoszcz Zachód. L’itinéraire de la ligne est situé dans les voïvodies: Wielkopolski et Kujawsko-Pomorskie, municipalités: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La centrale électrique 220/110 kV Bydgoszcz Zachód est située à Lipniki, dans la municipalité de Białe Błota, dans le district de Bydgoszcz, dans la voïvodie de Kujawsko-Pomorskie. Le projet est mis en œuvre dans une zone moins développée. (French) / qualifier
 
point in time: 30 November 2021
Timestamp+2021-11-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Im Rahmen des Projekts wurde der Bau einer zweigleisigen Linie 400 kV Bydgoszcz Zachód – Piła Krzewina und der Ausbau des Bahnhofs Bydgoszcz Zachód durchgeführt. Die Strecke befindet sich in den Woiwodschaften: Wielkopolski und Kujawsko-Pomorskie, Gemeinden: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Enten. Das Kraftwerk 220/110 kV Bydgoszcz Zachód befindet sich in Lipniki in der Gemeinde Białe Błota, im Bezirk Bydgoszcz, in der Woiwodschaft Kujawsko-Pomorskie. Das Projekt wird in einem weniger entwickelten Bereich umgesetzt. (German)
Property / summary: Im Rahmen des Projekts wurde der Bau einer zweigleisigen Linie 400 kV Bydgoszcz Zachód – Piła Krzewina und der Ausbau des Bahnhofs Bydgoszcz Zachód durchgeführt. Die Strecke befindet sich in den Woiwodschaften: Wielkopolski und Kujawsko-Pomorskie, Gemeinden: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Enten. Das Kraftwerk 220/110 kV Bydgoszcz Zachód befindet sich in Lipniki in der Gemeinde Białe Błota, im Bezirk Bydgoszcz, in der Woiwodschaft Kujawsko-Pomorskie. Das Projekt wird in einem weniger entwickelten Bereich umgesetzt. (German) / rank
 
Normal rank
Property / summary: Im Rahmen des Projekts wurde der Bau einer zweigleisigen Linie 400 kV Bydgoszcz Zachód – Piła Krzewina und der Ausbau des Bahnhofs Bydgoszcz Zachód durchgeführt. Die Strecke befindet sich in den Woiwodschaften: Wielkopolski und Kujawsko-Pomorskie, Gemeinden: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Enten. Das Kraftwerk 220/110 kV Bydgoszcz Zachód befindet sich in Lipniki in der Gemeinde Białe Błota, im Bezirk Bydgoszcz, in der Woiwodschaft Kujawsko-Pomorskie. Das Projekt wird in einem weniger entwickelten Bereich umgesetzt. (German) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Als onderdeel van het project, de bouw van een twee-spoor lijn 400 kV Bydgoszcz Zachód — Piła Krzewina en uitbreiding van het station Bydgoszcz Zachód. De route van de lijn bevindt zich in de voivodships: Wielkopolski en Kujawsko-Pomorskie, gemeenten: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Bydgoszcz Zachód is gelegen in Lipniki in de gemeente Białe Błota, in het district Bydgoszcz, in het woiwodschap Kujawsko-Pomorskie. Het project wordt uitgevoerd in een minder ontwikkeld gebied. (Dutch)
Property / summary: Als onderdeel van het project, de bouw van een twee-spoor lijn 400 kV Bydgoszcz Zachód — Piła Krzewina en uitbreiding van het station Bydgoszcz Zachód. De route van de lijn bevindt zich in de voivodships: Wielkopolski en Kujawsko-Pomorskie, gemeenten: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Bydgoszcz Zachód is gelegen in Lipniki in de gemeente Białe Błota, in het district Bydgoszcz, in het woiwodschap Kujawsko-Pomorskie. Het project wordt uitgevoerd in een minder ontwikkeld gebied. (Dutch) / rank
 
Normal rank
Property / summary: Als onderdeel van het project, de bouw van een twee-spoor lijn 400 kV Bydgoszcz Zachód — Piła Krzewina en uitbreiding van het station Bydgoszcz Zachód. De route van de lijn bevindt zich in de voivodships: Wielkopolski en Kujawsko-Pomorskie, gemeenten: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Bydgoszcz Zachód is gelegen in Lipniki in de gemeente Białe Błota, in het district Bydgoszcz, in het woiwodschap Kujawsko-Pomorskie. Het project wordt uitgevoerd in een minder ontwikkeld gebied. (Dutch) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Nell'ambito del progetto, la costruzione di una linea a due binari da 400 kV Bydgoszcz Zachód — Piła Krzewina e l'ampliamento della stazione di Bydgoszcz Zachód. Il percorso della linea si trova nei voivodati: Wielkopolski e Kujawsko-Pomorskie, comuni: Fango bianco, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Città di campagna, Anatra. La centrale elettrica 220/110 kV Bydgoszcz Zachód si trova a Lipniki nel comune di Białe Błota, nel distretto di Bydgoszcz, nel Voivodato di Kujawsko-Pomorskie. Il progetto è in fase di realizzazione in un'area meno sviluppata. (Italian)
Property / summary: Nell'ambito del progetto, la costruzione di una linea a due binari da 400 kV Bydgoszcz Zachód — Piła Krzewina e l'ampliamento della stazione di Bydgoszcz Zachód. Il percorso della linea si trova nei voivodati: Wielkopolski e Kujawsko-Pomorskie, comuni: Fango bianco, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Città di campagna, Anatra. La centrale elettrica 220/110 kV Bydgoszcz Zachód si trova a Lipniki nel comune di Białe Błota, nel distretto di Bydgoszcz, nel Voivodato di Kujawsko-Pomorskie. Il progetto è in fase di realizzazione in un'area meno sviluppata. (Italian) / rank
 
Normal rank
Property / summary: Nell'ambito del progetto, la costruzione di una linea a due binari da 400 kV Bydgoszcz Zachód — Piła Krzewina e l'ampliamento della stazione di Bydgoszcz Zachód. Il percorso della linea si trova nei voivodati: Wielkopolski e Kujawsko-Pomorskie, comuni: Fango bianco, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Città di campagna, Anatra. La centrale elettrica 220/110 kV Bydgoszcz Zachód si trova a Lipniki nel comune di Białe Błota, nel distretto di Bydgoszcz, nel Voivodato di Kujawsko-Pomorskie. Il progetto è in fase di realizzazione in un'area meno sviluppata. (Italian) / qualifier
 
point in time: 16 January 2022
Timestamp+2022-01-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Como parte del proyecto, la construcción de una línea de dos vías 400 kV Bydgoszcz Zachód — Piła Krzewina y ampliación de la estación de Bydgoszcz Zachód. La ruta de la línea se encuentra en los voivodatos: Wielkopolski y Kujawsko-Pomorskie, municipios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La central eléctrica 220/110 kV Bydgoszcz Zachód se encuentra en Lipniki, en el municipio de Białe Błota, en el distrito de Bydgoszcz, en el Voivodato de Kujawsko-Pomorskie. El proyecto se está ejecutando en un área menos desarrollada. (Spanish)
Property / summary: Como parte del proyecto, la construcción de una línea de dos vías 400 kV Bydgoszcz Zachód — Piła Krzewina y ampliación de la estación de Bydgoszcz Zachód. La ruta de la línea se encuentra en los voivodatos: Wielkopolski y Kujawsko-Pomorskie, municipios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La central eléctrica 220/110 kV Bydgoszcz Zachód se encuentra en Lipniki, en el municipio de Białe Błota, en el distrito de Bydgoszcz, en el Voivodato de Kujawsko-Pomorskie. El proyecto se está ejecutando en un área menos desarrollada. (Spanish) / rank
 
Normal rank
Property / summary: Como parte del proyecto, la construcción de una línea de dos vías 400 kV Bydgoszcz Zachód — Piła Krzewina y ampliación de la estación de Bydgoszcz Zachód. La ruta de la línea se encuentra en los voivodatos: Wielkopolski y Kujawsko-Pomorskie, municipios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La central eléctrica 220/110 kV Bydgoszcz Zachód se encuentra en Lipniki, en el municipio de Białe Błota, en el distrito de Bydgoszcz, en el Voivodato de Kujawsko-Pomorskie. El proyecto se está ejecutando en un área menos desarrollada. (Spanish) / qualifier
 
point in time: 19 January 2022
Timestamp+2022-01-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Som en del af projektet, opførelsen af en tosporet linje 400 kV Bydgoszcz Zachód — Piła Krzewina og udvidelse af Bydgoszcz Zachód station. Linjens rute er placeret i voivodskaberne: Wielkopolski og Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ands. Kraftværket 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota i bydelen Bydgoszcz i Kujawsko-Pomorskie Voivodeship. Projektet gennemføres i et mindre udviklet område. (Danish)
Property / summary: Som en del af projektet, opførelsen af en tosporet linje 400 kV Bydgoszcz Zachód — Piła Krzewina og udvidelse af Bydgoszcz Zachód station. Linjens rute er placeret i voivodskaberne: Wielkopolski og Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ands. Kraftværket 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota i bydelen Bydgoszcz i Kujawsko-Pomorskie Voivodeship. Projektet gennemføres i et mindre udviklet område. (Danish) / rank
 
Normal rank
Property / summary: Som en del af projektet, opførelsen af en tosporet linje 400 kV Bydgoszcz Zachód — Piła Krzewina og udvidelse af Bydgoszcz Zachód station. Linjens rute er placeret i voivodskaberne: Wielkopolski og Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ands. Kraftværket 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota i bydelen Bydgoszcz i Kujawsko-Pomorskie Voivodeship. Projektet gennemføres i et mindre udviklet område. (Danish) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Στο πλαίσιο του έργου, η κατασκευή μιας διπλής γραμμής γραμμής 400 kV Bydgoszcz Zachód — Piła Krzewina και η επέκταση του σταθμού Bydgoszcz Zachód. Η διαδρομή της γραμμής βρίσκεται στα βοεβοδάτα: Wielkopolski και Kujawsko-Pomorskie, δήμοι: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Ο σταθμός παραγωγής ηλεκτρικής ενέργειας 220/110 kV Bydgoszcz Zachód βρίσκεται στο Lipniki του δήμου Białe Błota, στην περιφέρεια Bydgoszcz, στο Voivodeship Kujawsko-Pomorskie. Το έργο υλοποιείται σε λιγότερο ανεπτυγμένη περιοχή. (Greek)
Property / summary: Στο πλαίσιο του έργου, η κατασκευή μιας διπλής γραμμής γραμμής 400 kV Bydgoszcz Zachód — Piła Krzewina και η επέκταση του σταθμού Bydgoszcz Zachód. Η διαδρομή της γραμμής βρίσκεται στα βοεβοδάτα: Wielkopolski και Kujawsko-Pomorskie, δήμοι: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Ο σταθμός παραγωγής ηλεκτρικής ενέργειας 220/110 kV Bydgoszcz Zachód βρίσκεται στο Lipniki του δήμου Białe Błota, στην περιφέρεια Bydgoszcz, στο Voivodeship Kujawsko-Pomorskie. Το έργο υλοποιείται σε λιγότερο ανεπτυγμένη περιοχή. (Greek) / rank
 
Normal rank
Property / summary: Στο πλαίσιο του έργου, η κατασκευή μιας διπλής γραμμής γραμμής 400 kV Bydgoszcz Zachód — Piła Krzewina και η επέκταση του σταθμού Bydgoszcz Zachód. Η διαδρομή της γραμμής βρίσκεται στα βοεβοδάτα: Wielkopolski και Kujawsko-Pomorskie, δήμοι: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Ο σταθμός παραγωγής ηλεκτρικής ενέργειας 220/110 kV Bydgoszcz Zachód βρίσκεται στο Lipniki του δήμου Białe Błota, στην περιφέρεια Bydgoszcz, στο Voivodeship Kujawsko-Pomorskie. Το έργο υλοποιείται σε λιγότερο ανεπτυγμένη περιοχή. (Greek) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Kao dio projekta, izgradnja dvokolosiječne linije 400 kV Bydgoszcz Zachód – Piła Krzewina i proširenje postaje Bydgoszcz Zachód. Ruta linije nalazi se u voivodships: Wielkopolski i Kujawsko-Pomorskie, općine: Bijelo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Visoka, Country Town, Patke. Elektrana 220/110 kV Bydgoszcz Zachód nalazi se u mjestu Lipniki u općini Białe Błota, u okrugu Bydgoszcz, u Kujawsko-pomorskom vojvodstvu. Projekt se provodi u manje razvijenim područjima. (Croatian)
Property / summary: Kao dio projekta, izgradnja dvokolosiječne linije 400 kV Bydgoszcz Zachód – Piła Krzewina i proširenje postaje Bydgoszcz Zachód. Ruta linije nalazi se u voivodships: Wielkopolski i Kujawsko-Pomorskie, općine: Bijelo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Visoka, Country Town, Patke. Elektrana 220/110 kV Bydgoszcz Zachód nalazi se u mjestu Lipniki u općini Białe Błota, u okrugu Bydgoszcz, u Kujawsko-pomorskom vojvodstvu. Projekt se provodi u manje razvijenim područjima. (Croatian) / rank
 
Normal rank
Property / summary: Kao dio projekta, izgradnja dvokolosiječne linije 400 kV Bydgoszcz Zachód – Piła Krzewina i proširenje postaje Bydgoszcz Zachód. Ruta linije nalazi se u voivodships: Wielkopolski i Kujawsko-Pomorskie, općine: Bijelo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Visoka, Country Town, Patke. Elektrana 220/110 kV Bydgoszcz Zachód nalazi se u mjestu Lipniki u općini Białe Błota, u okrugu Bydgoszcz, u Kujawsko-pomorskom vojvodstvu. Projekt se provodi u manje razvijenim područjima. (Croatian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Ca parte a proiectului, construirea unei linii cu două linii 400 kV Bydgoszcz Zachód – Piła Krzewina și extinderea stației Bydgoszcz Zachód. Traseul liniei este situat în voievodate: Wielkopolski și Kujawsko-Pomorskie, comune: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Centrala electrică 220/110 kV Bydgoszcz Zachód este situată în Lipniki, în comuna Białe Błota, în districtul Bydgoszcz, în Voievodatul Kujawsko-Pomorskie. Proiectul este implementat într-o zonă mai puțin dezvoltată. (Romanian)
Property / summary: Ca parte a proiectului, construirea unei linii cu două linii 400 kV Bydgoszcz Zachód – Piła Krzewina și extinderea stației Bydgoszcz Zachód. Traseul liniei este situat în voievodate: Wielkopolski și Kujawsko-Pomorskie, comune: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Centrala electrică 220/110 kV Bydgoszcz Zachód este situată în Lipniki, în comuna Białe Błota, în districtul Bydgoszcz, în Voievodatul Kujawsko-Pomorskie. Proiectul este implementat într-o zonă mai puțin dezvoltată. (Romanian) / rank
 
Normal rank
Property / summary: Ca parte a proiectului, construirea unei linii cu două linii 400 kV Bydgoszcz Zachód – Piła Krzewina și extinderea stației Bydgoszcz Zachód. Traseul liniei este situat în voievodate: Wielkopolski și Kujawsko-Pomorskie, comune: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Centrala electrică 220/110 kV Bydgoszcz Zachód este situată în Lipniki, în comuna Białe Błota, în districtul Bydgoszcz, în Voievodatul Kujawsko-Pomorskie. Proiectul este implementat într-o zonă mai puțin dezvoltată. (Romanian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Súčasťou projektu je výstavba dvojkoľajovej trate 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšírenie stanice Bydgoszcz Zachód. Trasa linky sa nachádza vo vojvodstvách: Wielkopolski a Kujawsko-Pomorskie, obce: Biely bahno, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektráreň 220/110 kV Bydgoszcz Zachód sa nachádza v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorskom vojvodstve. Projekt sa realizuje v menej rozvinutej oblasti. (Slovak)
Property / summary: Súčasťou projektu je výstavba dvojkoľajovej trate 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšírenie stanice Bydgoszcz Zachód. Trasa linky sa nachádza vo vojvodstvách: Wielkopolski a Kujawsko-Pomorskie, obce: Biely bahno, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektráreň 220/110 kV Bydgoszcz Zachód sa nachádza v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorskom vojvodstve. Projekt sa realizuje v menej rozvinutej oblasti. (Slovak) / rank
 
Normal rank
Property / summary: Súčasťou projektu je výstavba dvojkoľajovej trate 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšírenie stanice Bydgoszcz Zachód. Trasa linky sa nachádza vo vojvodstvách: Wielkopolski a Kujawsko-Pomorskie, obce: Biely bahno, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektráreň 220/110 kV Bydgoszcz Zachód sa nachádza v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorskom vojvodstve. Projekt sa realizuje v menej rozvinutej oblasti. (Slovak) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Bħala parti mill-proġett, il-kostruzzjoni ta’ linja b’żewġ linji 400 kV Bydgoszcz Zachód — Piła Krzewina u l-estensjoni tal-istazzjon Bydgoszcz Zachód. Ir-rotta tal-linja tinsab fil-voivodships: Wielkopolski u Kujawsko-Pomorskie, muniċipalitajiet: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Pajjiż Town, Ducks. L-impjant tal-enerġija 220/110 kV Bydgoszcz Zachód jinsab f’Lipniki fil-muniċipalità ta’ Białe Błota, fid-distrett ta’ Bydgoszcz, fil-Kujawsko-Pomorskie Voivodeship. Il-proġett qed jiġi implimentat f’żona inqas żviluppata. (Maltese)
Property / summary: Bħala parti mill-proġett, il-kostruzzjoni ta’ linja b’żewġ linji 400 kV Bydgoszcz Zachód — Piła Krzewina u l-estensjoni tal-istazzjon Bydgoszcz Zachód. Ir-rotta tal-linja tinsab fil-voivodships: Wielkopolski u Kujawsko-Pomorskie, muniċipalitajiet: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Pajjiż Town, Ducks. L-impjant tal-enerġija 220/110 kV Bydgoszcz Zachód jinsab f’Lipniki fil-muniċipalità ta’ Białe Błota, fid-distrett ta’ Bydgoszcz, fil-Kujawsko-Pomorskie Voivodeship. Il-proġett qed jiġi implimentat f’żona inqas żviluppata. (Maltese) / rank
 
Normal rank
Property / summary: Bħala parti mill-proġett, il-kostruzzjoni ta’ linja b’żewġ linji 400 kV Bydgoszcz Zachód — Piła Krzewina u l-estensjoni tal-istazzjon Bydgoszcz Zachód. Ir-rotta tal-linja tinsab fil-voivodships: Wielkopolski u Kujawsko-Pomorskie, muniċipalitajiet: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Pajjiż Town, Ducks. L-impjant tal-enerġija 220/110 kV Bydgoszcz Zachód jinsab f’Lipniki fil-muniċipalità ta’ Białe Błota, fid-distrett ta’ Bydgoszcz, fil-Kujawsko-Pomorskie Voivodeship. Il-proġett qed jiġi implimentat f’żona inqas żviluppata. (Maltese) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O projeto incluiu a construção de uma linha de duas vias de 400 kV Bydgoszcz West – Piła Krzewina e a expansão da estação de Bydgoszcz West. O traçado da linha situa-se nos voivodatos: Wielkopolskie e Kujawsko-Pomorskie, comunas: Lama branca, Sicienko, Caderno, Escuro, Sadki, Wyrzysk, Białośliwie, Alto, Cidade de Krajeńskie, Patos. A central elétrica 220/110 kV Bydgoszcz West está localizada em Lipniki, na comuna de Białe Błota, no distrito de Bydgoszcz, voivodia de Kujawsko-Pomorskie. O projeto é executado numa área menos desenvolvida. (Portuguese)
Property / summary: O projeto incluiu a construção de uma linha de duas vias de 400 kV Bydgoszcz West – Piła Krzewina e a expansão da estação de Bydgoszcz West. O traçado da linha situa-se nos voivodatos: Wielkopolskie e Kujawsko-Pomorskie, comunas: Lama branca, Sicienko, Caderno, Escuro, Sadki, Wyrzysk, Białośliwie, Alto, Cidade de Krajeńskie, Patos. A central elétrica 220/110 kV Bydgoszcz West está localizada em Lipniki, na comuna de Białe Błota, no distrito de Bydgoszcz, voivodia de Kujawsko-Pomorskie. O projeto é executado numa área menos desenvolvida. (Portuguese) / rank
 
Normal rank
Property / summary: O projeto incluiu a construção de uma linha de duas vias de 400 kV Bydgoszcz West – Piła Krzewina e a expansão da estação de Bydgoszcz West. O traçado da linha situa-se nos voivodatos: Wielkopolskie e Kujawsko-Pomorskie, comunas: Lama branca, Sicienko, Caderno, Escuro, Sadki, Wyrzysk, Białośliwie, Alto, Cidade de Krajeńskie, Patos. A central elétrica 220/110 kV Bydgoszcz West está localizada em Lipniki, na comuna de Białe Błota, no distrito de Bydgoszcz, voivodia de Kujawsko-Pomorskie. O projeto é executado numa área menos desenvolvida. (Portuguese) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Osana hanketta kaksiraiteisen linjan rakentaminen 400 kV Bydgoszcz Zachód – Piła Krzewina ja Bydgoszcz Zachódin aseman laajennus. Linjan reitti sijaitsee voivodialuksilla: Wielkopolski ja Kujawsko-Pomorskie, kunnat: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Voimalaitos 220/110 kV Bydgoszcz Zachód sijaitsee Lipnikissa Białe Błotassa, Bydgoszczin alueella Kujawsko-Pomorskien voivodikunnassa. Hanketta toteutetaan vähemmän kehittyneellä alueella. (Finnish)
Property / summary: Osana hanketta kaksiraiteisen linjan rakentaminen 400 kV Bydgoszcz Zachód – Piła Krzewina ja Bydgoszcz Zachódin aseman laajennus. Linjan reitti sijaitsee voivodialuksilla: Wielkopolski ja Kujawsko-Pomorskie, kunnat: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Voimalaitos 220/110 kV Bydgoszcz Zachód sijaitsee Lipnikissa Białe Błotassa, Bydgoszczin alueella Kujawsko-Pomorskien voivodikunnassa. Hanketta toteutetaan vähemmän kehittyneellä alueella. (Finnish) / rank
 
Normal rank
Property / summary: Osana hanketta kaksiraiteisen linjan rakentaminen 400 kV Bydgoszcz Zachód – Piła Krzewina ja Bydgoszcz Zachódin aseman laajennus. Linjan reitti sijaitsee voivodialuksilla: Wielkopolski ja Kujawsko-Pomorskie, kunnat: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Voimalaitos 220/110 kV Bydgoszcz Zachód sijaitsee Lipnikissa Białe Błotassa, Bydgoszczin alueella Kujawsko-Pomorskien voivodikunnassa. Hanketta toteutetaan vähemmän kehittyneellä alueella. (Finnish) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
V okviru projekta je bila zgrajena dvotirna proga 400 kV Bydgoszcz Zachód – Piła Krzewina in razširitev postaje Bydgoszcz Zachód. Pot proge se nahaja v vojvodstvu: Wielkopolski in Kujawsko-Pomorskie, občini: Belo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, race. Elektrarna 220/110 kV Bydgoszcz Zachód se nahaja v Lipnikih v občini Białe Błota, v okrožju Bydgoszcz, v Kujavsko-Pomorjanskem vojvodstvu. Projekt se izvaja na manj razvitem območju. (Slovenian)
Property / summary: V okviru projekta je bila zgrajena dvotirna proga 400 kV Bydgoszcz Zachód – Piła Krzewina in razširitev postaje Bydgoszcz Zachód. Pot proge se nahaja v vojvodstvu: Wielkopolski in Kujawsko-Pomorskie, občini: Belo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, race. Elektrarna 220/110 kV Bydgoszcz Zachód se nahaja v Lipnikih v občini Białe Błota, v okrožju Bydgoszcz, v Kujavsko-Pomorjanskem vojvodstvu. Projekt se izvaja na manj razvitem območju. (Slovenian) / rank
 
Normal rank
Property / summary: V okviru projekta je bila zgrajena dvotirna proga 400 kV Bydgoszcz Zachód – Piła Krzewina in razširitev postaje Bydgoszcz Zachód. Pot proge se nahaja v vojvodstvu: Wielkopolski in Kujawsko-Pomorskie, občini: Belo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, race. Elektrarna 220/110 kV Bydgoszcz Zachód se nahaja v Lipnikih v občini Białe Błota, v okrožju Bydgoszcz, v Kujavsko-Pomorjanskem vojvodstvu. Projekt se izvaja na manj razvitem območju. (Slovenian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Součástí projektu je výstavba dvoukolejné trati 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšíření stanice Bydgoszcz Zachód. Trasa trati se nachází v voivodships: Wielkopolski a Kujawsko-Pomorskie, obce: Bílé bláto, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektrárna 220/110 kV Bydgoszcz Zachód se nachází v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorském vojvodství. Projekt je realizován v méně rozvinuté oblasti. (Czech)
Property / summary: Součástí projektu je výstavba dvoukolejné trati 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšíření stanice Bydgoszcz Zachód. Trasa trati se nachází v voivodships: Wielkopolski a Kujawsko-Pomorskie, obce: Bílé bláto, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektrárna 220/110 kV Bydgoszcz Zachód se nachází v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorském vojvodství. Projekt je realizován v méně rozvinuté oblasti. (Czech) / rank
 
Normal rank
Property / summary: Součástí projektu je výstavba dvoukolejné trati 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšíření stanice Bydgoszcz Zachód. Trasa trati se nachází v voivodships: Wielkopolski a Kujawsko-Pomorskie, obce: Bílé bláto, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektrárna 220/110 kV Bydgoszcz Zachód se nachází v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorském vojvodství. Projekt je realizován v méně rozvinuté oblasti. (Czech) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Kaip projekto dalis, dviejų bėgių linijos 400 kV Bydgoszcz Zachód – Piła Krzewina statyba ir Bydgoszcz Zachód stoties pratęsimas. Linijos maršrutas yra vaivadijose: Wielkopolski ir Kujawsko-Pomorskie savivaldybės: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, antys. Elektrinė 220/110 kV Bydgoszcz Zachód yra Lipnikyje, Białe Błota savivaldybėje, Bydgoščiaus rajone, Kujavijos Pamario vaivadijoje. Projektas įgyvendinamas mažiau išsivysčiusioje srityje. (Lithuanian)
Property / summary: Kaip projekto dalis, dviejų bėgių linijos 400 kV Bydgoszcz Zachód – Piła Krzewina statyba ir Bydgoszcz Zachód stoties pratęsimas. Linijos maršrutas yra vaivadijose: Wielkopolski ir Kujawsko-Pomorskie savivaldybės: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, antys. Elektrinė 220/110 kV Bydgoszcz Zachód yra Lipnikyje, Białe Błota savivaldybėje, Bydgoščiaus rajone, Kujavijos Pamario vaivadijoje. Projektas įgyvendinamas mažiau išsivysčiusioje srityje. (Lithuanian) / rank
 
Normal rank
Property / summary: Kaip projekto dalis, dviejų bėgių linijos 400 kV Bydgoszcz Zachód – Piła Krzewina statyba ir Bydgoszcz Zachód stoties pratęsimas. Linijos maršrutas yra vaivadijose: Wielkopolski ir Kujawsko-Pomorskie savivaldybės: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, antys. Elektrinė 220/110 kV Bydgoszcz Zachód yra Lipnikyje, Białe Błota savivaldybėje, Bydgoščiaus rajone, Kujavijos Pamario vaivadijoje. Projektas įgyvendinamas mažiau išsivysčiusioje srityje. (Lithuanian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekta ietvaros divu sliežu ceļu līnijas būvniecība 400 kV Bydgoszcz Zachód — Piła Krzewina un Bydgoszcz Zachód stacijas paplašināšana. Līnijas maršruts atrodas vojevodistē: Wielkopolski un Kujawsko-Pomorskie pašvaldības: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Pīles. Elektrostacija 220/110 kV Bydgoszcz Zachód atrodas Lipniki Błota pašvaldībā, Bydgoszcz rajonā Kujawsko-Pomorskie vojevodistē. Projekts tiek īstenots mazāk attīstītā teritorijā. (Latvian)
Property / summary: Projekta ietvaros divu sliežu ceļu līnijas būvniecība 400 kV Bydgoszcz Zachód — Piła Krzewina un Bydgoszcz Zachód stacijas paplašināšana. Līnijas maršruts atrodas vojevodistē: Wielkopolski un Kujawsko-Pomorskie pašvaldības: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Pīles. Elektrostacija 220/110 kV Bydgoszcz Zachód atrodas Lipniki Błota pašvaldībā, Bydgoszcz rajonā Kujawsko-Pomorskie vojevodistē. Projekts tiek īstenots mazāk attīstītā teritorijā. (Latvian) / rank
 
Normal rank
Property / summary: Projekta ietvaros divu sliežu ceļu līnijas būvniecība 400 kV Bydgoszcz Zachód — Piła Krzewina un Bydgoszcz Zachód stacijas paplašināšana. Līnijas maršruts atrodas vojevodistē: Wielkopolski un Kujawsko-Pomorskie pašvaldības: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Pīles. Elektrostacija 220/110 kV Bydgoszcz Zachód atrodas Lipniki Błota pašvaldībā, Bydgoszcz rajonā Kujawsko-Pomorskie vojevodistē. Projekts tiek īstenots mazāk attīstītā teritorijā. (Latvian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Като част от проекта, изграждането на двупистна линия 400 kV Bydgoszcz Zachód — Piła Krzewina и разширение на гара Bydgoszcz Zachód. Маршрутът на линията се намира във воеводствата: Wielkopolski и Kujawsko-Pomorskie, общини: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Електроцентрала 220/110 kV Bydgoszcz Zachód се намира в Липники, община Białe Błota, в областта Bydgoszcz, в Kujawsko-Pomorskie Voivodeship. Проектът се изпълнява в по-слабо развита област. (Bulgarian)
Property / summary: Като част от проекта, изграждането на двупистна линия 400 kV Bydgoszcz Zachód — Piła Krzewina и разширение на гара Bydgoszcz Zachód. Маршрутът на линията се намира във воеводствата: Wielkopolski и Kujawsko-Pomorskie, общини: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Електроцентрала 220/110 kV Bydgoszcz Zachód се намира в Липники, община Białe Błota, в областта Bydgoszcz, в Kujawsko-Pomorskie Voivodeship. Проектът се изпълнява в по-слабо развита област. (Bulgarian) / rank
 
Normal rank
Property / summary: Като част от проекта, изграждането на двупистна линия 400 kV Bydgoszcz Zachód — Piła Krzewina и разширение на гара Bydgoszcz Zachód. Маршрутът на линията се намира във воеводствата: Wielkopolski и Kujawsko-Pomorskie, общини: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Електроцентрала 220/110 kV Bydgoszcz Zachód се намира в Липники, община Białe Błota, в областта Bydgoszcz, в Kujawsko-Pomorskie Voivodeship. Проектът се изпълнява в по-слабо развита област. (Bulgarian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A projekt részeként egy 400 kV-os Bydgoszcz Zachód – Piła Krzewina vonal építése és a Bydgoszcz Zachód állomás bővítése. A vonal útvonala a vajdaságban található: Wielkopolski és Kujawsko-Pomorskie települések: Fehér iszap, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, kacsa. A Bydgoszcz Zachód 220/110 kV-os erőmű Białe Błota településen, Lipnikiben, Bydgoszcz kerületben, a Kujawsko-Pomorskie vajdaságban található. A projektet egy kevésbé fejlett területen valósítják meg. (Hungarian)
Property / summary: A projekt részeként egy 400 kV-os Bydgoszcz Zachód – Piła Krzewina vonal építése és a Bydgoszcz Zachód állomás bővítése. A vonal útvonala a vajdaságban található: Wielkopolski és Kujawsko-Pomorskie települések: Fehér iszap, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, kacsa. A Bydgoszcz Zachód 220/110 kV-os erőmű Białe Błota településen, Lipnikiben, Bydgoszcz kerületben, a Kujawsko-Pomorskie vajdaságban található. A projektet egy kevésbé fejlett területen valósítják meg. (Hungarian) / rank
 
Normal rank
Property / summary: A projekt részeként egy 400 kV-os Bydgoszcz Zachód – Piła Krzewina vonal építése és a Bydgoszcz Zachód állomás bővítése. A vonal útvonala a vajdaságban található: Wielkopolski és Kujawsko-Pomorskie települések: Fehér iszap, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, kacsa. A Bydgoszcz Zachód 220/110 kV-os erőmű Białe Błota településen, Lipnikiben, Bydgoszcz kerületben, a Kujawsko-Pomorskie vajdaságban található. A projektet egy kevésbé fejlett területen valósítják meg. (Hungarian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Mar chuid den tionscadal, tógáil líne dhá rian 400 kV Bydgoszcz Zachód — Piła Krzewina agus síneadh ar stáisiún Bydgoszcz Zachód. Tá bealach na líne suite sna voivodships: Wielkopolski agus Kujawsko-Pomorskie, bardais: An Mud Bán, Sicienko, Nakło nad Noteció, Dark, Sadki, Wyrzysk, Białośliwie, Ard, Baile Tuaithe, Duganna. Tá stáisiún cumhachta 220/110 kV Bydgoszcz Zachód lonnaithe i Lipniki i mbardas Białe Błota, i gceantar Bydgoszcz, sa Kujawsko-Pomorskie Voivodeship. Tá an tionscadal á chur i bhfeidhm i gceantar nach bhfuil chomh forbartha sin. (Irish)
Property / summary: Mar chuid den tionscadal, tógáil líne dhá rian 400 kV Bydgoszcz Zachód — Piła Krzewina agus síneadh ar stáisiún Bydgoszcz Zachód. Tá bealach na líne suite sna voivodships: Wielkopolski agus Kujawsko-Pomorskie, bardais: An Mud Bán, Sicienko, Nakło nad Noteció, Dark, Sadki, Wyrzysk, Białośliwie, Ard, Baile Tuaithe, Duganna. Tá stáisiún cumhachta 220/110 kV Bydgoszcz Zachód lonnaithe i Lipniki i mbardas Białe Błota, i gceantar Bydgoszcz, sa Kujawsko-Pomorskie Voivodeship. Tá an tionscadal á chur i bhfeidhm i gceantar nach bhfuil chomh forbartha sin. (Irish) / rank
 
Normal rank
Property / summary: Mar chuid den tionscadal, tógáil líne dhá rian 400 kV Bydgoszcz Zachód — Piła Krzewina agus síneadh ar stáisiún Bydgoszcz Zachód. Tá bealach na líne suite sna voivodships: Wielkopolski agus Kujawsko-Pomorskie, bardais: An Mud Bán, Sicienko, Nakło nad Noteció, Dark, Sadki, Wyrzysk, Białośliwie, Ard, Baile Tuaithe, Duganna. Tá stáisiún cumhachta 220/110 kV Bydgoszcz Zachód lonnaithe i Lipniki i mbardas Białe Błota, i gceantar Bydgoszcz, sa Kujawsko-Pomorskie Voivodeship. Tá an tionscadal á chur i bhfeidhm i gceantar nach bhfuil chomh forbartha sin. (Irish) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Som en del av projektet, byggandet av en tvåspårig linje 400 kV Bydgoszcz Zachód – Piła Krzewina och utbyggnad av Bydgoszcz Zachód station. Linjens rutt ligger i vovodskeppen: Wielkopolski och Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Kraftverk 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota, i distriktet Bydgoszcz, i Kujawsko-Pomorskie Voivodeship. Projektet genomförs i ett mindre utvecklat område. (Swedish)
Property / summary: Som en del av projektet, byggandet av en tvåspårig linje 400 kV Bydgoszcz Zachód – Piła Krzewina och utbyggnad av Bydgoszcz Zachód station. Linjens rutt ligger i vovodskeppen: Wielkopolski och Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Kraftverk 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota, i distriktet Bydgoszcz, i Kujawsko-Pomorskie Voivodeship. Projektet genomförs i ett mindre utvecklat område. (Swedish) / rank
 
Normal rank
Property / summary: Som en del av projektet, byggandet av en tvåspårig linje 400 kV Bydgoszcz Zachód – Piła Krzewina och utbyggnad av Bydgoszcz Zachód station. Linjens rutt ligger i vovodskeppen: Wielkopolski och Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Kraftverk 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota, i distriktet Bydgoszcz, i Kujawsko-Pomorskie Voivodeship. Projektet genomförs i ett mindre utvecklat område. (Swedish) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekti raames ehitati kaherajaline liin 400 kV Bydgoszcz Zachód – Piła Krzewina ja laiendati Bydgoszcz Zachódi jaama. Liini marsruut asub vojevoodkondades: Wielkopolski ja Kujawsko-Pomorskie, omavalitsusüksused: Valge Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Bucks. Elektrijaam 220/110 kV Bydgoszcz Zachód asub Lipnikis Białe Błota omavalitsusüksuses Bydgoszczi piirkonnas Kujawsko-Pomorskie vojevoodkonnas. Projekti rakendatakse vähem arenenud piirkonnas. (Estonian)
Property / summary: Projekti raames ehitati kaherajaline liin 400 kV Bydgoszcz Zachód – Piła Krzewina ja laiendati Bydgoszcz Zachódi jaama. Liini marsruut asub vojevoodkondades: Wielkopolski ja Kujawsko-Pomorskie, omavalitsusüksused: Valge Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Bucks. Elektrijaam 220/110 kV Bydgoszcz Zachód asub Lipnikis Białe Błota omavalitsusüksuses Bydgoszczi piirkonnas Kujawsko-Pomorskie vojevoodkonnas. Projekti rakendatakse vähem arenenud piirkonnas. (Estonian) / rank
 
Normal rank
Property / summary: Projekti raames ehitati kaherajaline liin 400 kV Bydgoszcz Zachód – Piła Krzewina ja laiendati Bydgoszcz Zachódi jaama. Liini marsruut asub vojevoodkondades: Wielkopolski ja Kujawsko-Pomorskie, omavalitsusüksused: Valge Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Bucks. Elektrijaam 220/110 kV Bydgoszcz Zachód asub Lipnikis Białe Błota omavalitsusüksuses Bydgoszczi piirkonnas Kujawsko-Pomorskie vojevoodkonnas. Projekti rakendatakse vähem arenenud piirkonnas. (Estonian) / qualifier
 
point in time: 26 July 2022
Timestamp+2022-07-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / location (string)
 
WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski
Property / location (string): WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski / rank
 
Normal rank
Property / location (string)
 
WOJ.: KUJAWSKO-POMORSKIE, POW.: nakielski
Property / location (string): WOJ.: KUJAWSKO-POMORSKIE, POW.: nakielski / rank
 
Normal rank
Property / location (string)
 
WOJ.: WIELKOPOLSKIE, POW.: pilski
Property / location (string): WOJ.: WIELKOPOLSKIE, POW.: pilski / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: I. Decarbonisation of the economy / rank
 
Normal rank
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / coordinate location
 
53°11'31.78"N, 17°49'31.80"E
Latitude53.19216065
Longitude17.825496146759
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 53°11'31.78"N, 17°49'31.80"E / rank
 
Normal rank
Property / coordinate location: 53°11'31.78"N, 17°49'31.80"E / qualifier
 
Property / coordinate location
 
53°5'41.42"N, 17°35'50.64"E
Latitude53.09484255
Longitude17.597400406629
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 53°5'41.42"N, 17°35'50.64"E / rank
 
Normal rank
Property / coordinate location: 53°5'41.42"N, 17°35'50.64"E / qualifier
 
Property / coordinate location
 
53°9'27.83"N, 16°53'34.84"E
Latitude53.1577254
Longitude16.893007809005
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 53°9'27.83"N, 16°53'34.84"E / rank
 
Normal rank
Property / coordinate location: 53°9'27.83"N, 16°53'34.84"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Bydgosko-toruński / rank
 
Normal rank
Property / contained in NUTS: Bydgosko-toruński / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Inowrocławski / rank
 
Normal rank
Property / contained in NUTS: Inowrocławski / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Pilski / rank
 
Normal rank
Property / contained in NUTS: Pilski / qualifier
 
Property / thematic objective
 
Property / thematic objective: Low-carbon economy / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: Q4611912 / rank
 
Normal rank
Property / beneficiary name (string)
 
POLSKIE SIECI ELEKTROENERGETYCZNE S.A
Property / beneficiary name (string): POLSKIE SIECI ELEKTROENERGETYCZNE S.A / rank
 
Normal rank
Property / date of last update
 
6 July 2023
Timestamp+2023-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 6 July 2023 / rank
 
Normal rank

Latest revision as of 15:42, 13 October 2024

Project Q84409 in Poland
Language Label Description Also known as
English
Construction of the Bydgoszcz West – Piła Krzewina line with the extension of the station in this line
Project Q84409 in Poland

    Statements

    0 references
    71,352,158.3 zloty
    0 references
    15,861,584.79 Euro
    13 January 2020
    0 references
    71,352,158.3 zloty
    0 references
    15,861,584.79 Euro
    13 January 2020
    0 references
    100.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    POLSKIE SIECI ELEKTROENERGETYCZNE S.A
    0 references
    0 references
    0 references

    53°11'31.78"N, 17°49'31.80"E
    0 references

    53°5'41.42"N, 17°35'50.64"E
    0 references

    53°9'27.83"N, 16°53'34.84"E
    0 references
    W ramach Projektu przewidziano budowę dwutorowej linii 400 kV Bydgoszcz Zachód – Piła Krzewina oraz rozbudowę stacji Bydgoszcz Zachód. Trasa linii zlokalizowana jest na terenie województw: wielkopolskiego oraz kujawsko – pomorskiego, gmin: Białe Błota, Sicienko, Nakło nad Notecią, Mrocza, Sadki, Wyrzysk, Białośliwie, Wysoka, Miasteczko Krajeńskie, Kaczory. Stacja elektroenergetyczna 220/110 kV Bydgoszcz Zachód położona jest na terenie miejscowości Lipniki w gminie Białe Błota, w powiecie bydgoskim, w województwie kujawsko-pomorskim. Projekt realizowany jest na obszarze słabiej rozwiniętym. (Polish)
    0 references
    The project included the construction of a two-track line 400 kV Bydgoszcz West – Piła Krzewina and the expansion of Bydgoszcz West station. The line route is located in the voivodships: Wielkopolskie and Kujawsko-Pomorskie, communes: White Mud, Sicienko, Notebook, Dark, Sadki, Wyrzysk, Białośliwie, High, Krajeńskie Town, Ducks. Power station 220/110 kV Bydgoszcz West is located in Lipniki in the Białe Błota commune, in Bydgoszcz County, Kujawsko-Pomorskie Voivodeship. The project is implemented in a less developed area. (English)
    14 October 2020
    0.7181822574081379
    0 references
    Dans le cadre du projet, la construction d’une ligne à deux voies de 400 kV Bydgoszcz Zachód — Piła Krzewina et l’extension de la station Bydgoszcz Zachód. L’itinéraire de la ligne est situé dans les voïvodies: Wielkopolski et Kujawsko-Pomorskie, municipalités: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La centrale électrique 220/110 kV Bydgoszcz Zachód est située à Lipniki, dans la municipalité de Białe Błota, dans le district de Bydgoszcz, dans la voïvodie de Kujawsko-Pomorskie. Le projet est mis en œuvre dans une zone moins développée. (French)
    30 November 2021
    0 references
    Im Rahmen des Projekts wurde der Bau einer zweigleisigen Linie 400 kV Bydgoszcz Zachód – Piła Krzewina und der Ausbau des Bahnhofs Bydgoszcz Zachód durchgeführt. Die Strecke befindet sich in den Woiwodschaften: Wielkopolski und Kujawsko-Pomorskie, Gemeinden: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Enten. Das Kraftwerk 220/110 kV Bydgoszcz Zachód befindet sich in Lipniki in der Gemeinde Białe Błota, im Bezirk Bydgoszcz, in der Woiwodschaft Kujawsko-Pomorskie. Das Projekt wird in einem weniger entwickelten Bereich umgesetzt. (German)
    7 December 2021
    0 references
    Als onderdeel van het project, de bouw van een twee-spoor lijn 400 kV Bydgoszcz Zachód — Piła Krzewina en uitbreiding van het station Bydgoszcz Zachód. De route van de lijn bevindt zich in de voivodships: Wielkopolski en Kujawsko-Pomorskie, gemeenten: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Bydgoszcz Zachód is gelegen in Lipniki in de gemeente Białe Błota, in het district Bydgoszcz, in het woiwodschap Kujawsko-Pomorskie. Het project wordt uitgevoerd in een minder ontwikkeld gebied. (Dutch)
    16 December 2021
    0 references
    Nell'ambito del progetto, la costruzione di una linea a due binari da 400 kV Bydgoszcz Zachód — Piła Krzewina e l'ampliamento della stazione di Bydgoszcz Zachód. Il percorso della linea si trova nei voivodati: Wielkopolski e Kujawsko-Pomorskie, comuni: Fango bianco, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Città di campagna, Anatra. La centrale elettrica 220/110 kV Bydgoszcz Zachód si trova a Lipniki nel comune di Białe Błota, nel distretto di Bydgoszcz, nel Voivodato di Kujawsko-Pomorskie. Il progetto è in fase di realizzazione in un'area meno sviluppata. (Italian)
    16 January 2022
    0 references
    Como parte del proyecto, la construcción de una línea de dos vías 400 kV Bydgoszcz Zachód — Piła Krzewina y ampliación de la estación de Bydgoszcz Zachód. La ruta de la línea se encuentra en los voivodatos: Wielkopolski y Kujawsko-Pomorskie, municipios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La central eléctrica 220/110 kV Bydgoszcz Zachód se encuentra en Lipniki, en el municipio de Białe Błota, en el distrito de Bydgoszcz, en el Voivodato de Kujawsko-Pomorskie. El proyecto se está ejecutando en un área menos desarrollada. (Spanish)
    19 January 2022
    0 references
    Som en del af projektet, opførelsen af en tosporet linje 400 kV Bydgoszcz Zachód — Piła Krzewina og udvidelse af Bydgoszcz Zachód station. Linjens rute er placeret i voivodskaberne: Wielkopolski og Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ands. Kraftværket 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota i bydelen Bydgoszcz i Kujawsko-Pomorskie Voivodeship. Projektet gennemføres i et mindre udviklet område. (Danish)
    26 July 2022
    0 references
    Στο πλαίσιο του έργου, η κατασκευή μιας διπλής γραμμής γραμμής 400 kV Bydgoszcz Zachód — Piła Krzewina και η επέκταση του σταθμού Bydgoszcz Zachód. Η διαδρομή της γραμμής βρίσκεται στα βοεβοδάτα: Wielkopolski και Kujawsko-Pomorskie, δήμοι: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Ο σταθμός παραγωγής ηλεκτρικής ενέργειας 220/110 kV Bydgoszcz Zachód βρίσκεται στο Lipniki του δήμου Białe Błota, στην περιφέρεια Bydgoszcz, στο Voivodeship Kujawsko-Pomorskie. Το έργο υλοποιείται σε λιγότερο ανεπτυγμένη περιοχή. (Greek)
    26 July 2022
    0 references
    Kao dio projekta, izgradnja dvokolosiječne linije 400 kV Bydgoszcz Zachód – Piła Krzewina i proširenje postaje Bydgoszcz Zachód. Ruta linije nalazi se u voivodships: Wielkopolski i Kujawsko-Pomorskie, općine: Bijelo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Visoka, Country Town, Patke. Elektrana 220/110 kV Bydgoszcz Zachód nalazi se u mjestu Lipniki u općini Białe Błota, u okrugu Bydgoszcz, u Kujawsko-pomorskom vojvodstvu. Projekt se provodi u manje razvijenim područjima. (Croatian)
    26 July 2022
    0 references
    Ca parte a proiectului, construirea unei linii cu două linii 400 kV Bydgoszcz Zachód – Piła Krzewina și extinderea stației Bydgoszcz Zachód. Traseul liniei este situat în voievodate: Wielkopolski și Kujawsko-Pomorskie, comune: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Centrala electrică 220/110 kV Bydgoszcz Zachód este situată în Lipniki, în comuna Białe Błota, în districtul Bydgoszcz, în Voievodatul Kujawsko-Pomorskie. Proiectul este implementat într-o zonă mai puțin dezvoltată. (Romanian)
    26 July 2022
    0 references
    Súčasťou projektu je výstavba dvojkoľajovej trate 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšírenie stanice Bydgoszcz Zachód. Trasa linky sa nachádza vo vojvodstvách: Wielkopolski a Kujawsko-Pomorskie, obce: Biely bahno, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektráreň 220/110 kV Bydgoszcz Zachód sa nachádza v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorskom vojvodstve. Projekt sa realizuje v menej rozvinutej oblasti. (Slovak)
    26 July 2022
    0 references
    Bħala parti mill-proġett, il-kostruzzjoni ta’ linja b’żewġ linji 400 kV Bydgoszcz Zachód — Piła Krzewina u l-estensjoni tal-istazzjon Bydgoszcz Zachód. Ir-rotta tal-linja tinsab fil-voivodships: Wielkopolski u Kujawsko-Pomorskie, muniċipalitajiet: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Pajjiż Town, Ducks. L-impjant tal-enerġija 220/110 kV Bydgoszcz Zachód jinsab f’Lipniki fil-muniċipalità ta’ Białe Błota, fid-distrett ta’ Bydgoszcz, fil-Kujawsko-Pomorskie Voivodeship. Il-proġett qed jiġi implimentat f’żona inqas żviluppata. (Maltese)
    26 July 2022
    0 references
    O projeto incluiu a construção de uma linha de duas vias de 400 kV Bydgoszcz West – Piła Krzewina e a expansão da estação de Bydgoszcz West. O traçado da linha situa-se nos voivodatos: Wielkopolskie e Kujawsko-Pomorskie, comunas: Lama branca, Sicienko, Caderno, Escuro, Sadki, Wyrzysk, Białośliwie, Alto, Cidade de Krajeńskie, Patos. A central elétrica 220/110 kV Bydgoszcz West está localizada em Lipniki, na comuna de Białe Błota, no distrito de Bydgoszcz, voivodia de Kujawsko-Pomorskie. O projeto é executado numa área menos desenvolvida. (Portuguese)
    26 July 2022
    0 references
    Osana hanketta kaksiraiteisen linjan rakentaminen 400 kV Bydgoszcz Zachód – Piła Krzewina ja Bydgoszcz Zachódin aseman laajennus. Linjan reitti sijaitsee voivodialuksilla: Wielkopolski ja Kujawsko-Pomorskie, kunnat: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Voimalaitos 220/110 kV Bydgoszcz Zachód sijaitsee Lipnikissa Białe Błotassa, Bydgoszczin alueella Kujawsko-Pomorskien voivodikunnassa. Hanketta toteutetaan vähemmän kehittyneellä alueella. (Finnish)
    26 July 2022
    0 references
    V okviru projekta je bila zgrajena dvotirna proga 400 kV Bydgoszcz Zachód – Piła Krzewina in razširitev postaje Bydgoszcz Zachód. Pot proge se nahaja v vojvodstvu: Wielkopolski in Kujawsko-Pomorskie, občini: Belo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, race. Elektrarna 220/110 kV Bydgoszcz Zachód se nahaja v Lipnikih v občini Białe Błota, v okrožju Bydgoszcz, v Kujavsko-Pomorjanskem vojvodstvu. Projekt se izvaja na manj razvitem območju. (Slovenian)
    26 July 2022
    0 references
    Součástí projektu je výstavba dvoukolejné trati 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšíření stanice Bydgoszcz Zachód. Trasa trati se nachází v voivodships: Wielkopolski a Kujawsko-Pomorskie, obce: Bílé bláto, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektrárna 220/110 kV Bydgoszcz Zachód se nachází v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorském vojvodství. Projekt je realizován v méně rozvinuté oblasti. (Czech)
    26 July 2022
    0 references
    Kaip projekto dalis, dviejų bėgių linijos 400 kV Bydgoszcz Zachód – Piła Krzewina statyba ir Bydgoszcz Zachód stoties pratęsimas. Linijos maršrutas yra vaivadijose: Wielkopolski ir Kujawsko-Pomorskie savivaldybės: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, antys. Elektrinė 220/110 kV Bydgoszcz Zachód yra Lipnikyje, Białe Błota savivaldybėje, Bydgoščiaus rajone, Kujavijos Pamario vaivadijoje. Projektas įgyvendinamas mažiau išsivysčiusioje srityje. (Lithuanian)
    26 July 2022
    0 references
    Projekta ietvaros divu sliežu ceļu līnijas būvniecība 400 kV Bydgoszcz Zachód — Piła Krzewina un Bydgoszcz Zachód stacijas paplašināšana. Līnijas maršruts atrodas vojevodistē: Wielkopolski un Kujawsko-Pomorskie pašvaldības: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Pīles. Elektrostacija 220/110 kV Bydgoszcz Zachód atrodas Lipniki Błota pašvaldībā, Bydgoszcz rajonā Kujawsko-Pomorskie vojevodistē. Projekts tiek īstenots mazāk attīstītā teritorijā. (Latvian)
    26 July 2022
    0 references
    Като част от проекта, изграждането на двупистна линия 400 kV Bydgoszcz Zachód — Piła Krzewina и разширение на гара Bydgoszcz Zachód. Маршрутът на линията се намира във воеводствата: Wielkopolski и Kujawsko-Pomorskie, общини: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Електроцентрала 220/110 kV Bydgoszcz Zachód се намира в Липники, община Białe Błota, в областта Bydgoszcz, в Kujawsko-Pomorskie Voivodeship. Проектът се изпълнява в по-слабо развита област. (Bulgarian)
    26 July 2022
    0 references
    A projekt részeként egy 400 kV-os Bydgoszcz Zachód – Piła Krzewina vonal építése és a Bydgoszcz Zachód állomás bővítése. A vonal útvonala a vajdaságban található: Wielkopolski és Kujawsko-Pomorskie települések: Fehér iszap, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, kacsa. A Bydgoszcz Zachód 220/110 kV-os erőmű Białe Błota településen, Lipnikiben, Bydgoszcz kerületben, a Kujawsko-Pomorskie vajdaságban található. A projektet egy kevésbé fejlett területen valósítják meg. (Hungarian)
    26 July 2022
    0 references
    Mar chuid den tionscadal, tógáil líne dhá rian 400 kV Bydgoszcz Zachód — Piła Krzewina agus síneadh ar stáisiún Bydgoszcz Zachód. Tá bealach na líne suite sna voivodships: Wielkopolski agus Kujawsko-Pomorskie, bardais: An Mud Bán, Sicienko, Nakło nad Noteció, Dark, Sadki, Wyrzysk, Białośliwie, Ard, Baile Tuaithe, Duganna. Tá stáisiún cumhachta 220/110 kV Bydgoszcz Zachód lonnaithe i Lipniki i mbardas Białe Błota, i gceantar Bydgoszcz, sa Kujawsko-Pomorskie Voivodeship. Tá an tionscadal á chur i bhfeidhm i gceantar nach bhfuil chomh forbartha sin. (Irish)
    26 July 2022
    0 references
    Som en del av projektet, byggandet av en tvåspårig linje 400 kV Bydgoszcz Zachód – Piła Krzewina och utbyggnad av Bydgoszcz Zachód station. Linjens rutt ligger i vovodskeppen: Wielkopolski och Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Kraftverk 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota, i distriktet Bydgoszcz, i Kujawsko-Pomorskie Voivodeship. Projektet genomförs i ett mindre utvecklat område. (Swedish)
    26 July 2022
    0 references
    Projekti raames ehitati kaherajaline liin 400 kV Bydgoszcz Zachód – Piła Krzewina ja laiendati Bydgoszcz Zachódi jaama. Liini marsruut asub vojevoodkondades: Wielkopolski ja Kujawsko-Pomorskie, omavalitsusüksused: Valge Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Bucks. Elektrijaam 220/110 kV Bydgoszcz Zachód asub Lipnikis Białe Błota omavalitsusüksuses Bydgoszczi piirkonnas Kujawsko-Pomorskie vojevoodkonnas. Projekti rakendatakse vähem arenenud piirkonnas. (Estonian)
    26 July 2022
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: nakielski
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: pilski
    0 references
    6 July 2023
    0 references

    Identifiers

    POIS.01.01.02-00-0001/18
    0 references