Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy (Q84414): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 62.54 percentage) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(10 intermediate revisions by 2 users not shown) | |||||||||||||||
label / fr | label / fr | ||||||||||||||
Construction de la station | Construction de la station 110/15 kV Skwierzyna II pour permettre le développement des énergies renouvelables | ||||||||||||||
label / de | label / de | ||||||||||||||
Bau | Bau der 110/15 kV Station Skwierzyna II zur Ermöglichung der Entwicklung erneuerbarer Energien | ||||||||||||||
label / nl | label / nl | ||||||||||||||
Bouw van | Bouw van 110/15 kV Skwierzyna II-station om de ontwikkeling van hernieuwbare energie mogelijk te maken | ||||||||||||||
label / it | label / it | ||||||||||||||
Costruzione | Costruzione della stazione Skwierzyna II 110/15 kV per consentire lo sviluppo di energie rinnovabili | ||||||||||||||
label / el | label / el | ||||||||||||||
Κατασκευή σταθμού 110/15 kV | Κατασκευή του σταθμού Skwierzyna II 110/15 kV για την ανάπτυξη ανανεώσιμων πηγών ενέργειας | ||||||||||||||
label / hr | label / hr | ||||||||||||||
Izgradnja stanice 110/15 kV Skwierzyna II kako bi se omogućio razvoj | Izgradnja stanice 110/15 kV Skwierzyna II kako bi se omogućio razvoj obnovljivih izvora energije | ||||||||||||||
label / ro | label / ro | ||||||||||||||
Construcția stației 110/15 kV Skwierzyna II pentru a permite dezvoltarea energiei | Construcția stației 110/15 kV Skwierzyna II pentru a permite dezvoltarea energiei regenerabile | ||||||||||||||
label / sk | label / sk | ||||||||||||||
Výstavba 110/15 kV stanice Skwierzyna II s cieľom umožniť rozvoj | Výstavba 110/15 kV stanice Skwierzyna II s cieľom umožniť rozvoj obnoviteľných zdrojov energie | ||||||||||||||
label / mt | label / mt | ||||||||||||||
Bini ta’ 110/15 kV stazzjon ta’ Skwierzyna II biex jippermetti l-iżvilupp ta’ enerġija rinnovabbli | |||||||||||||||
label / pt | label / pt | ||||||||||||||
Construção | Construção de uma estação Skwierzyna II de 110/15 kV para permitir o desenvolvimento de energias renováveis | ||||||||||||||
label / fi | label / fi | ||||||||||||||
110/15 kV Skwierzyna II -aseman rakentaminen uusiutuvan energian | 110/15 kV:n Skwierzyna II -aseman rakentaminen uusiutuvan energian kehittämisen mahdollistamiseksi | ||||||||||||||
label / sl | label / sl | ||||||||||||||
Gradnja 110/15 kV | Gradnja postaje 110/15 kV Skwierzyna II za razvoj obnovljivih virov energije | ||||||||||||||
label / cs | label / cs | ||||||||||||||
Výstavba stanice 110/15 kV Skwierzyna II s cílem umožnit rozvoj | Výstavba stanice 110/15 kV Skwierzyna II s cílem umožnit rozvoj obnovitelných zdrojů energie | ||||||||||||||
label / bg | label / bg | ||||||||||||||
Изграждане на станция | Изграждане на станция 110/15 kV Skwierzyna II, за да се даде възможност за развитие на възобновяема енергия | ||||||||||||||
Property / EU contribution | Property / EU contribution | ||||||||||||||
| 14,384,965.65 zloty
| ||||||||||||||
Property / EU contribution | Property / EU contribution | ||||||||||||||
| 3,197,777.86 Euro
| ||||||||||||||
Property / summary: The aim of the project is to increase the possibility of connecting sources of RES electricity generation without simultaneously reducing the parameters of the supplied energy and minimising the risk of failures and interruptions in the supply of energy (relevant barriers to the development of renewable energy will be removed). As a result of the project, the possibility of connecting electricity generators from RES will be increased. In addition, the conditions for powering those affected by the station will be improved. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures 1.1.2 of the OP. The project covers the construction of a new power station GPZ Skwierzyna II 110/15 kV consisting of a 110 kV switchgear and a 15 kV switchgear. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV with a supply line of 110 kV and outputs of 15 kV. (English) / qualifier | |||||||||||||||
readability score: 0.634102995804212
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
L’objectif du projet est d’accroître la possibilité de connecter des sources de production d’électricité à partir de sources d’énergie renouvelables sans réduire simultanément les paramètres de l’énergie fournie et de réduire au minimum les risques de défaillances et d’interruptions de l’approvisionnement en énergie (les obstacles importants au développement des énergies renouvelables seront supprimés). À la suite du projet, la possibilité de connecter des producteurs d’électricité à des sources d’énergie renouvelables augmentera. En outre, les conditions d’approvisionnement des clients couverts par l’impact de la station s’amélioreront. L’objectif direct, et donc le projet, est conforme aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et de la sous-mesure 1.1.2 de l’OPI & E. Le projet porte sur la construction d’une nouvelle centrale électrique GPZ Skwierzyna II 110/15 kV composée d’un appareillage de commutation de 110 kV et d’un appareillage de commutation de 15 kV. La station fait partie d’un réseau de distribution à 110 kV, où l’électricité est convertie en 15 kV avec une ligne électrique de 110 kV et des sorties de 15 kV. (French) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Ziel des Projekts ist es, die Möglichkeit zu erhöhen, Quellen der Stromerzeugung aus erneuerbaren Quellen zu verbinden, ohne gleichzeitig die Parameter der gelieferten Energie zu senken und das Risiko von Ausfällen und Unterbrechungen der Energieversorgung zu minimieren (erhebliche Hindernisse für die Entwicklung erneuerbarer Energien werden beseitigt). Als Ergebnis des Projekts wird sich die Möglichkeit erhöhen, Stromerzeuger mit EE zu verbinden. Darüber hinaus werden sich die Bedingungen für die Versorgung der Kunden, die unter die Auswirkungen der Station fallen, verbessern. Das direkte Ziel und damit das Projekt stehen im Einklang mit den Zielen des operationellen Programms, der Prioritätsachse sowie der Maßnahme und Teilmaßnahme 1.1.2 des OPI & E. Das Projekt umfasst den Bau eines neuen Kraftwerks GPZ Skwierzyna II 110/15 kV bestehend aus 110 kV Schaltanlagen und 15 kV Schaltanlagen. Die Station ist Teil eines Verteilernetzes mit 110 kV, wo Strom in 15 kV mit 110 kV Stromleitung und 15 kV Ausgänge umgewandelt wird. (German) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Het doel van het project is de mogelijkheid te vergroten om bronnen van elektriciteitsopwekking uit hernieuwbare bronnen met elkaar te verbinden zonder tegelijkertijd de parameters van de geleverde energie te verlagen en het risico van storingen en onderbrekingen in de energievoorziening tot een minimum te beperken (aanzienlijke belemmeringen voor de ontwikkeling van hernieuwbare energie zullen worden weggenomen). Als gevolg van het project zal de mogelijkheid om elektriciteitsgeneratoren aan te sluiten op RES toenemen. Bovendien zullen de voorwaarden voor het leveren van klanten die onder de impact van het station vallen, verbeteren. De rechtstreekse doelstelling, en dus het project, strookt met de doelstellingen van het operationele programma, de prioritaire as en de actie en submaatregel 1.1.2 van het OPI & E. Het project omvat de bouw van een nieuwe krachtcentrale GPZ Skwierzyna II 110/15 kV bestaande uit 110 kV schakelapparatuur en 15 kV schakelapparatuur. Het station maakt deel uit van een distributienetwerk bij 110 kV, waar elektriciteit wordt omgezet naar 15 kV met 110 kV-voedingsleiding en 15 kV uitgangen. (Dutch) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
L'obiettivo del progetto è quello di aumentare la possibilità di collegare le fonti di generazione di elettricità FER senza contemporaneamente abbassare i parametri dell'energia fornita e ridurre al minimo il rischio di guasti e interruzioni nell'approvvigionamento energetico (saranno rimossi significativi ostacoli allo sviluppo dell'energia rinnovabile). A seguito del progetto, la possibilità di collegare i generatori di energia elettrica con le energie rinnovabili aumenterà. Inoltre, le condizioni per l'approvvigionamento dei clienti coperti dall'impatto della stazione miglioreranno. L'obiettivo diretto, e quindi il progetto, è coerente con gli obiettivi del programma operativo, l'asse prioritario e l'azione e la sottomisura 1.1.2 delle OPI & E. Il progetto riguarda la costruzione di una nuova centrale elettrica GPZ Skwierzyna II 110/15 kV composta da quadri da 110 kV e da 15 kV. La stazione fa parte di una rete di distribuzione a 110 kV, dove l'elettricità viene convertita in 15 kV con 110 kV di alimentazione e 15 kV uscite. (Italian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
El objetivo del proyecto es aumentar la posibilidad de conectar fuentes de generación de electricidad FER sin reducir simultáneamente los parámetros de la energía suministrada y minimizar el riesgo de fallos e interrupciones en el suministro de energía (se eliminarán barreras significativas al desarrollo de energías renovables). Como resultado del proyecto, aumentará la posibilidad de conectar generadores de electricidad con FER. Además, mejorarán las condiciones para abastecer a los clientes cubiertos por el impacto de la estación. El objetivo directo, y por lo tanto el proyecto, es coherente con los objetivos del programa operativo, el eje prioritario y la acción y la submedida 1.1.2 del OPI & E. El proyecto cubre la construcción de una nueva central eléctrica GPZ Skwierzyna II 110/15 kV que consta de conmutadores de 110 kV y conmutadores de 15 kV. La estación forma parte de una red de distribución a 110 kV, donde la electricidad se convierte a 15 kV con una línea de alimentación de 110 kV y salidas de 15 kV. (Spanish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Formålet med projektet er at øge muligheden for at forbinde vedvarende energikilder uden samtidig at sænke parametrene for den leverede energi og minimere risikoen for svigt og afbrydelser i energiforsyningen (væsentlige hindringer for udviklingen af vedvarende energi vil blive fjernet). Som følge af projektet vil muligheden for at forbinde elektricitetsgeneratorer med vedvarende energikilder øges. Desuden vil betingelserne for forsyning af kunder, der er omfattet af virkningen af stationen, forbedres. Det direkte mål og dermed projektet er i overensstemmelse med målene for det operationelle program, prioritetsaksen og aktionen og delforanstaltning 1.1.2 i OPI & E. Projektet omfatter opførelse af et nyt kraftværk GPZ Skwierzyna II 110/15 kV bestående af 110 kV koblingsanlæg og 15 kV koblingsanlæg. Stationen er en del af et distributionsnet ved 110 kV, hvor elektricitet konverteres til 15 kV med 110 kV elledning og 15 kV udgange. (Danish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Στόχος του έργου είναι η αύξηση της δυνατότητας σύνδεσης των πηγών παραγωγής ηλεκτρικής ενέργειας από ΑΠΕ χωρίς ταυτόχρονη μείωση των παραμέτρων της παρεχόμενης ενέργειας και η ελαχιστοποίηση του κινδύνου αστοχιών και διακοπών στον ενεργειακό εφοδιασμό (θα αρθούν σημαντικά εμπόδια στην ανάπτυξη ανανεώσιμων πηγών ενέργειας). Ως αποτέλεσμα του έργου, θα αυξηθεί η δυνατότητα σύνδεσης των παραγωγών ηλεκτρικής ενέργειας με ΑΠΕ. Επιπλέον, θα βελτιωθούν οι όροι εφοδιασμού των πελατών που καλύπτονται από τις επιπτώσεις του σταθμού. Ο άμεσος στόχος, και συνεπώς το έργο, είναι σύμφωνος με τους στόχους του Επιχειρησιακού Προγράμματος, τον άξονα προτεραιότητας και τη δράση και το υπομέτρο 1.1.2 του OPI & E. Το έργο καλύπτει την κατασκευή ενός νέου σταθμού ηλεκτροπαραγωγής GPZ Skwierzyna II 110/15 kV που αποτελείται από 110 kV διακόπτες και 15 kV διακόπτες. Ο σταθμός αποτελεί μέρος ενός δικτύου διανομής 110 kV, όπου η ηλεκτρική ενέργεια μετατρέπεται σε 15 kV με γραμμή ισχύος 110 kV και εξόδους 15 kV. (Greek) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Cilj projekta je povećati mogućnost povezivanja izvora proizvodnje električne energije iz obnovljivih izvora bez istodobnog snižavanja parametara isporučene energije i minimiziranja rizika od kvarova i prekida u opskrbi energijom (uklonit će se značajne prepreke razvoju obnovljive energije). Kao rezultat projekta povećat će se mogućnost povezivanja generatora električne energije s obnovljivim izvorima energije. Osim toga, poboljšat će se uvjeti za opskrbu kupaca obuhvaćenih utjecajem stanice. Izravni cilj, a time i projekt, u skladu je s ciljevima operativnog programa, prioritetnom osi te djelovanjem i podmjerom 1.1.2. OPI-ja & E. Projekt obuhvaća izgradnju nove elektrane GPZ Skwierzyna II 110/15 kV koja se sastoji od 110 kV rasklopnih uređaja i 15 kV rasklopnih uređaja. Stanica je dio distribucijske mreže 110 kV, gdje se električna energija pretvara u 15 kV sa 110 kV i 15 kV izlaza. (Croatian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Scopul proiectului este de a crește posibilitatea conectării surselor de energie electrică din surse regenerabile fără a reduce simultan parametrii energiei furnizate și de a reduce la minimum riscul de defecțiuni și întreruperi în aprovizionarea cu energie (vor fi eliminate barierele semnificative din calea dezvoltării energiei din surse regenerabile). Ca urmare a proiectului, va crește posibilitatea conectării generatoarelor de energie electrică la sursele regenerabile de energie. În plus, condițiile de furnizare a clienților vizați de impactul stației se vor îmbunătăți. Obiectivul direct și, prin urmare, proiectul este în concordanță cu obiectivele programului operațional, ale axei prioritare și ale acțiunii și submăsurii 1.1.2 din OPI & E. Proiectul acoperă construcția unei noi centrale electrice GPZ Skwierzyna II 110/15 kV, compusă din comutație de 110 kV și dispozitiv de comutație de 15 kV. Stația face parte dintr-o rețea de distribuție de 110 kV, unde energia electrică este convertită la 15 kV cu o linie electrică de 110 kV și 15 kV ieșiri. (Romanian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Cieľom projektu je zvýšiť možnosť pripojenia zdrojov elektrickej energie z obnoviteľných zdrojov bez súčasného zníženia parametrov dodávanej energie a minimalizovať riziko porúch a prerušenia dodávok energie (odstránia sa významné prekážky rozvoja energie z obnoviteľných zdrojov). V dôsledku projektu sa zvýši možnosť pripojenia výrobcov elektrickej energie s OZE. Okrem toho sa zlepšia podmienky pre zásobovanie odberateľov, na ktorých sa vzťahuje vplyv stanice. Priamy cieľ, a teda projekt, je v súlade s cieľmi operačného programu, prioritnou osou a akciou a čiastkovým opatrením 1.1.2 OPI & E. Projekt zahŕňa výstavbu novej elektrárne GPZ Skwierzyna II 110/15 kV, ktorá pozostáva z rozvádzačov 110 kV a 15 kV rozvádzačov. Stanica je súčasťou distribučnej siete s 110 kV, kde sa elektrina premieňa na 15 kV s elektrickým vedením 110 kV a 15 kV výstupmi. (Slovak) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
L-għan tal-proġett huwa li tiżdied il-possibbiltà li jiġu konnessi sorsi ta’ ġenerazzjoni tal-elettriku minn sorsi ta’ enerġija rinnovabbli mingħajr ma fl-istess ħin jitnaqqsu l-parametri tal-enerġija fornuta u jitnaqqas kemm jista’ jkun ir-riskju ta’ fallimenti u interruzzjonijiet fil-provvista tal-enerġija (se jitneħħew ostakli sinifikanti għall-iżvilupp tal-enerġija rinnovabbli). Bħala riżultat tal-proġett, se tiżdied il-possibbiltà li l-ġeneraturi tal-elettriku jiġu konnessi mas-SER. Barra minn hekk, il-kundizzjonijiet għall-forniment tal-klijenti koperti mill-impatt tal-istazzjon se jitjiebu. L-objettiv dirett, u għalhekk il-proġett, huwa konsistenti mal-objettivi tal-Programm Operazzjonali, l-assi prijoritarju u l-azzjoni u s-submiżura 1.1.2 tal-OPI & E. Il-proġett ikopri l-kostruzzjoni ta’ impjant tal-enerġija ġdid GPZ Skwierzyna II 110/15 kV li jikkonsisti fi switchgear ta’ 110 kV u switchgear ta’ 15 kV. L-istazzjon huwa parti minn netwerk ta’ distribuzzjoni ta’ 110 kV, fejn l-elettriku jiġi kkonvertit għal 15 kV b’linja tal-elettriku ta’ 110 kV u b’outputs ta’ 15 kV. (Maltese) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
O objetivo do projeto é aumentar a possibilidade de ligar fontes de produção de eletricidade FER sem reduzir simultaneamente os parâmetros da energia fornecida e minimizar o risco de falhas e interrupções no fornecimento de energia (os obstáculos pertinentes ao desenvolvimento das energias renováveis serão eliminados). Em resultado do projeto, será aumentada a possibilidade de ligar os produtores de eletricidade a partir de FER. Além disso, as condições para alimentar as pessoas afetadas pela estação serão melhoradas. O objetivo direto e, por conseguinte, o projeto, está em consonância com os objetivos do programa operacional, o eixo prioritário e as ações e submedidas 1.1.2 do PO. O projeto abrange a construção de uma nova central elétrica GPZ Skwierzyna II 110/15 kV, composta por uma aparelhagem de 110 kV e uma aparelhagem de 15 kV. A estação faz parte de uma rede de distribuição com uma tensão de 110 kV, onde a eletricidade é transformada numa tensão de 15 kV com uma linha de alimentação de 110 kV e saídas de 15 kV. (Portuguese) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Hankkeen tavoitteena on lisätä mahdollisuuksia yhdistää uusiutuvista energialähteistä tuotetun sähkön tuotantolähteitä heikentämättä samanaikaisesti toimitetun energian parametreja ja minimoimatta energiatoimitusten epäonnistumis- ja keskeytymisriskiä (uusiutuvan energian kehittämisen merkittävät esteet poistetaan). Hankkeen myötä mahdollisuus liittää sähköntuottajat uusiutuviin energialähteisiin kasvaa. Lisäksi aseman vaikutuksen piiriin kuuluvien asiakkaiden toimitusehdot paranevat. Suora tavoite ja siten hanke ovat johdonmukaisia toimenpideohjelman, toimintalinjan sekä OPI & E:n toimen ja alatoimenpiteen 1.1.2 tavoitteiden kanssa. Hanke kattaa uuden voimalaitoksen GPZ Skwierzyna II 110/15 kV rakentamisen, joka koostuu 110 kV:n kytkinlaitteista ja 15 kV:n kytkinlaitteista. Asema on osa 110 kV:n jakeluverkkoa, jossa sähkö muunnetaan 15 kV:ksi 110 kV:n voimajohdolla ja 15 kV:n ulostulolla. (Finnish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Cilj projekta je povečati možnost povezovanja virov proizvodnje električne energije iz obnovljivih virov, ne da bi hkrati znižali parametre dobavljene energije in zmanjšali tveganje izpadov in prekinitev oskrbe z energijo (odstranili bodo znatne ovire za razvoj obnovljivih virov energije). Zaradi projekta se bo povečala možnost povezovanja proizvajalcev električne energije z OVE. Poleg tega se bodo izboljšali pogoji za oskrbo odjemalcev, ki jih pokriva vpliv postaje. Neposredni cilj in s tem projekt je skladen s cilji operativnega programa, prednostno osjo ter ukrepom in podukrepom 1.1.2 OPI & E. Projekt zajema gradnjo nove elektrarne GPZ Skwierzyna II 110/15 kV, ki je sestavljena iz 110 kV stikalnih naprav in 15 kV stikalnih naprav. Postaja je del distribucijskega omrežja pri 110 kV, kjer se električna energija pretvori v 15 kV s 110 kV električnim vodom in 15 kV izhodi. (Slovenian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Cílem projektu je zvýšit možnost propojení zdrojů výroby elektřiny z obnovitelných zdrojů bez současného snížení parametrů dodané energie a minimalizovat riziko poruch a přerušení dodávek energie (odstraní se významné překážky rozvoje energie z obnovitelných zdrojů). V důsledku projektu se zvýší možnost propojení výrobců elektřiny s obnovitelnými zdroji energie. Kromě toho se zlepší podmínky dodávek zákazníkům, na něž se vztahuje dopad stanice. Přímý cíl, a tedy projekt, je v souladu s cíli operačního programu, prioritní osy a akce a podopatření 1.1.2 OPI & E. Projekt zahrnuje výstavbu nové elektrárny GPZ Skwierzyna II 110/15 kV sestávající ze 110 kV rozvaděčů a 15 kV rozvaděčů. Stanice je součástí distribuční sítě 110 kV, kde je elektřina přeměněna na 15 kV s napájecím vedením 110 kV a 15 kV výstupy. (Czech) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Projekto tikslas – padidinti galimybę sujungti AEI elektros energijos gamybos šaltinius tuo pačiu metu nesumažinant tiekiamos energijos parametrų ir kuo labiau sumažinant energijos tiekimo gedimų ir pertrūkių riziką (bus pašalintos reikšmingos kliūtys atsinaujinančios energijos plėtrai). Dėl projekto padidės galimybė prijungti elektros energijos gamintojus su AEI. Be to, pagerės tiekimo vartotojams, kuriems daromas stoties poveikis, sąlygos. Tiesioginis tikslas, taigi ir projektas, atitinka OPI ir E veiksmų programos tikslus, prioritetinę kryptį ir veiksmą bei 1.1.2 papriemonę. Projektas apima naujos elektrinės GPZ Skwierzyna II 110/15 kV, kurią sudaro 110 kV skirstomieji įrenginiai ir 15 kV skirstomieji įrenginiai, statybą. Stotis yra 110 kV skirstomojo tinklo dalis, kurioje elektros energija konvertuojama į 15 kV su 110 kV elektros linija ir 15 kV išėjimais. (Lithuanian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Projekta mērķis ir palielināt iespēju savienot AER elektroenerģijas ražošanas avotus, vienlaikus nepazeminot piegādātās enerģijas parametrus un samazinot energoapgādes traucējumu un pārtraukumu risku (novērsīs būtiskus šķēršļus atjaunojamās enerģijas attīstībai). Projekta rezultātā palielināsies iespēja savienot elektroenerģijas ražotājus ar AER. Turklāt uzlabosies nosacījumi to klientu apgādei, uz kuriem attiecas stacijas ietekme. Tiešais mērķis un tādējādi projekts atbilst darbības programmas mērķiem, OPI & E prioritārajam virzienam un 1.1.2. apakšpasākumam. Projekts attiecas uz jaunas spēkstacijas GPZ Skwierzyna II 110/15 kV būvniecību, kas sastāv no 110 kV komutācijas iekārtām un 15 kV sadales iekārtām. Stacija ir daļa no 110 kV sadales tīkla, kur elektroenerģija tiek pārveidota par 15 kV ar 110 kV elektrolīniju un 15 kV izejām. (Latvian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Целта на проекта е да се увеличи възможността за свързване на източници за производство на електроенергия от ВЕИ, без едновременно да се понижават параметрите на доставената енергия и да се сведе до минимум рискът от повреди и прекъсвания в енергийните доставки (ще бъдат премахнати значителни пречки пред развитието на енергията от възобновяеми източници). В резултат на проекта ще се увеличи възможността за свързване на генераторите на електроенергия с ВЕИ. Освен това условията за доставка на клиенти, обхванати от въздействието на станцията, ще се подобрят. Пряката цел и следователно проектът е в съответствие с целите на оперативната програма, приоритетната ос и действието и подмярка 1.1.2 на ОПИ и Д. Проектът обхваща изграждането на нова електроцентрала GPZ Skwierzyna II 110/15 kV, състояща се от 110 kV комутационна апаратура и 15 kV комутационна апаратура. Станцията е част от разпределителна мрежа при 110 kV, където електроенергията се преобразува в 15 kV с електропровод 110 kV и изходи 15 kV. (Bulgarian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
A projekt célja, hogy növelje a megújuló energiaforrások villamosenergia-termelési forrásainak összekapcsolásának lehetőségét anélkül, hogy egyidejűleg csökkentené a szolgáltatott energia paramétereit, és minimálisra csökkentené az energiaellátás meghibásodásának és megszakadásának kockázatát (a megújuló energia fejlesztésének jelentős akadályai megszűnnek). A projekt eredményeként nő a villamosenergia-termelők megújuló energiaforrásokkal való összekapcsolásának lehetősége. Emellett javulni fognak az állomás hatása által érintett ügyfelek ellátásának feltételei is. A közvetlen célkitűzés és így a projekt összhangban van az operatív program célkitűzéseivel, a prioritási tengelysel, valamint az OPI & E 1.1.2. intézkedésével és 1.1.2. alintézkedésével. A projekt egy új GPZ Skwierzyna II 110/15 kV-os erőmű építésére terjed ki, amely 110 kV-os kapcsolóberendezésekből és 15 kV-os kapcsolóberendezésekből áll. Az állomás egy 110 kV-os elosztóhálózat része, ahol a villamos energiát 15 kV-ra alakítják át 110 kV-os elektromos vezetékkel és 15 kV kimenettel. (Hungarian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Is é is aidhm don tionscadal méadú a dhéanamh ar an bhféidearthacht foinsí giniúna leictreachais RES a nascadh gan paraiméadair an fhuinnimh arna sholáthar a ísliú ag an am céanna agus an baol go dteipfeadh ar an soláthar fuinnimh agus go mbrisfidh sé a íoslaghdú (cuirfear deireadh le bacainní suntasacha ar fhorbairt an fhuinnimh in-athnuaite). Mar thoradh ar an tionscadal, tiocfaidh méadú ar an bhféidearthacht gineadóirí leictreachais a nascadh le RES. Ina theannta sin, feabhsóidh na coinníollacha maidir le soláthar custaiméirí atá clúdaithe ag tionchar an stáisiúin. Tá an cuspóir díreach, agus dá bhrí sin, an tionscadal, comhsheasmhach le cuspóirí an Chláir Oibríochtúil, leis an ais tosaíochta agus le gníomhaíocht agus fobheart 1.1.2 OPI & E. Clúdaíonn an tionscadal tógáil stáisiún cumhachta nua GPZ Skwierzyna II 110/15 kV ina bhfuil lascthrealamh 110 kV agus lascthrealamh 15 kV. Tá an stáisiún mar chuid de ghréasán dáileacháin ag 110 kV, áit a ndéantar leictreachas a thiontú go 15 kV le líne chumhachta 110 kV agus aschuir 15 kV. (Irish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Syftet med projektet är att öka möjligheten att ansluta källor till elproduktion från förnybara energikällor utan att samtidigt sänka parametrarna för den levererade energin och minimera risken för fel och avbrott i energiförsörjningen (betydande hinder för utvecklingen av förnybar energi kommer att avlägsnas). Som ett resultat av projektet kommer möjligheten att ansluta elproducenter med förnybara energikällor att öka. Dessutom kommer villkoren för leverans av kunder som omfattas av effekten av stationen att förbättras. Det direkta målet, och därmed projektet, är förenligt med målen för det operativa programmet, det prioriterade området och åtgärden och delåtgärden 1.1.2 i OPI & E. Projektet omfattar byggandet av ett nytt kraftverk GPZ Skwierzyna II 110/15 kV bestående av 110 kV ställverk och 15 kV ställverk. Stationen är en del av ett distributionsnät på 110 kV, där el omvandlas till 15 kV med 110 kV kraftledning och 15 kV utgångar. (Swedish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Projekti eesmärk on suurendada taastuvatest energiaallikatest elektrienergia tootmise allikate ühendamise võimalust, vähendamata samal ajal tarnitava energia parameetreid ning vähendamata energiavarustuse rikke ja katkestuse ohtu (taastuvenergia arengut takistavad olulised takistused kõrvaldatakse). Projekti tulemusena suureneb võimalus ühendada elektritootjaid taastuvate energiaallikatega. Lisaks paranevad jaama mõjuga hõlmatud klientide varustamise tingimused. Otsene eesmärk ja seega projekt on kooskõlas rakenduskava eesmärkidega, prioriteetse suunaga ning OPI ja E osameetmega 1.1.2. Projekt hõlmab uue elektrijaama GPZ Skwierzyna II 110/15 kV ehitamist, mis koosneb 110 kV ja 15 kV jaotusseadmetest. Jaam on osa jaotusvõrgust 110 kV juures, kus elektrienergia muundatakse 110 kV elektriliini ja 15 kV väljundvõimsusega 15 kV-ks. (Estonian) | |||||||||||||||
Property / fund | |||||||||||||||
Property / fund: Cohesion Fund / rank | |||||||||||||||
Property / budget | Property / budget | ||||||||||||||
| 23,000,000.0 zloty
| ||||||||||||||
Property / budget | Property / budget | ||||||||||||||
| 5,112,900.0 Euro
| ||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Międzyrzecz / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in Local Administrative Unit: Międzyrzecz / qualifier | |||||||||||||||
Property / location (string) | |||||||||||||||
WOJ.: LUBUSKIE, POW.: międzyrzecki | |||||||||||||||
Property / location (string): WOJ.: LUBUSKIE, POW.: międzyrzecki / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: I. Decarbonisation of the economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
62.54 percent
| |||||||||||||||
Property / co-financing rate: 62.54 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
52°29'58.78"N, 15°34'49.55"E
| |||||||||||||||
Property / coordinate location: 52°29'58.78"N, 15°34'49.55"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 52°29'58.78"N, 15°34'49.55"E / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Gorzowski / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS: Gorzowski / qualifier | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
24 May 2023
| |||||||||||||||
Property / date of last update: 24 May 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 22:03, 12 October 2024
Project Q84414 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy |
Project Q84414 in Poland |
Statements
14,384,965.65 zloty
0 references
23,000,000.0 zloty
0 references
62.54 percent
0 references
22 March 2019
0 references
30 September 2021
0 references
ENEA OPERATOR SP. Z O.O.
0 references
Celem projektu jest zwiększenie możliwości przyłączenia źródeł wytwarzania energii elektrycznej OZE bez jednoczesnego obniżania parametrów dostarczanej energii oraz przy minimalizowaniu ryzyka wystąpienia awarii i przerw w dostawie energii (zniesione zostaną istotne bariery dla rozwoju energetyki odnawialnej). W wyniku realizacji projektu zwiększy się możliwość przyłączenia wytwórców energii elektrycznej z OZE. Ponadto, poprawie ulegną warunki zasilania odbiorców objętych zasięgiem oddziaływania stacji. Cel bezpośredni, a tym samym projekt, jest zgodny z celami Programu Operacyjnego, osi priorytetowej oraz działania i poddziałania 1.1.2 POIiŚ. Projekt obejmuje swoim zakresem budowę nowej stacji elektroenergetycznej GPZ Skwierzyna II 110/15 kV składającej się z rozdzielni 110 kV i rozdzielnicy 15 kV. Stacja stanowi element sieci dystrybucyjnej na napięciu 110 kV, na której odbywa się transformacja energii elektrycznej na napięcie 15 kV wraz z linią zasilającą 110 kV oraz wyprowadzeniami 15 kV. (Polish)
0 references
The aim of the project is to increase the possibility of connecting sources of RES electricity generation without simultaneously reducing the parameters of the supplied energy and minimising the risk of failures and interruptions in the supply of energy (relevant barriers to the development of renewable energy will be removed). As a result of the project, the possibility of connecting electricity generators from RES will be increased. In addition, the conditions for powering those affected by the station will be improved. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures 1.1.2 of the OP. The project covers the construction of a new power station GPZ Skwierzyna II 110/15 kV consisting of a 110 kV switchgear and a 15 kV switchgear. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV with a supply line of 110 kV and outputs of 15 kV. (English)
14 October 2020
0.634102995804212
0 references
L’objectif du projet est d’accroître la possibilité de connecter des sources de production d’électricité à partir de sources d’énergie renouvelables sans réduire simultanément les paramètres de l’énergie fournie et de réduire au minimum les risques de défaillances et d’interruptions de l’approvisionnement en énergie (les obstacles importants au développement des énergies renouvelables seront supprimés). À la suite du projet, la possibilité de connecter des producteurs d’électricité à des sources d’énergie renouvelables augmentera. En outre, les conditions d’approvisionnement des clients couverts par l’impact de la station s’amélioreront. L’objectif direct, et donc le projet, est conforme aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et de la sous-mesure 1.1.2 de l’OPI & E. Le projet porte sur la construction d’une nouvelle centrale électrique GPZ Skwierzyna II 110/15 kV composée d’un appareillage de commutation de 110 kV et d’un appareillage de commutation de 15 kV. La station fait partie d’un réseau de distribution à 110 kV, où l’électricité est convertie en 15 kV avec une ligne électrique de 110 kV et des sorties de 15 kV. (French)
30 November 2021
0 references
Ziel des Projekts ist es, die Möglichkeit zu erhöhen, Quellen der Stromerzeugung aus erneuerbaren Quellen zu verbinden, ohne gleichzeitig die Parameter der gelieferten Energie zu senken und das Risiko von Ausfällen und Unterbrechungen der Energieversorgung zu minimieren (erhebliche Hindernisse für die Entwicklung erneuerbarer Energien werden beseitigt). Als Ergebnis des Projekts wird sich die Möglichkeit erhöhen, Stromerzeuger mit EE zu verbinden. Darüber hinaus werden sich die Bedingungen für die Versorgung der Kunden, die unter die Auswirkungen der Station fallen, verbessern. Das direkte Ziel und damit das Projekt stehen im Einklang mit den Zielen des operationellen Programms, der Prioritätsachse sowie der Maßnahme und Teilmaßnahme 1.1.2 des OPI & E. Das Projekt umfasst den Bau eines neuen Kraftwerks GPZ Skwierzyna II 110/15 kV bestehend aus 110 kV Schaltanlagen und 15 kV Schaltanlagen. Die Station ist Teil eines Verteilernetzes mit 110 kV, wo Strom in 15 kV mit 110 kV Stromleitung und 15 kV Ausgänge umgewandelt wird. (German)
7 December 2021
0 references
Het doel van het project is de mogelijkheid te vergroten om bronnen van elektriciteitsopwekking uit hernieuwbare bronnen met elkaar te verbinden zonder tegelijkertijd de parameters van de geleverde energie te verlagen en het risico van storingen en onderbrekingen in de energievoorziening tot een minimum te beperken (aanzienlijke belemmeringen voor de ontwikkeling van hernieuwbare energie zullen worden weggenomen). Als gevolg van het project zal de mogelijkheid om elektriciteitsgeneratoren aan te sluiten op RES toenemen. Bovendien zullen de voorwaarden voor het leveren van klanten die onder de impact van het station vallen, verbeteren. De rechtstreekse doelstelling, en dus het project, strookt met de doelstellingen van het operationele programma, de prioritaire as en de actie en submaatregel 1.1.2 van het OPI & E. Het project omvat de bouw van een nieuwe krachtcentrale GPZ Skwierzyna II 110/15 kV bestaande uit 110 kV schakelapparatuur en 15 kV schakelapparatuur. Het station maakt deel uit van een distributienetwerk bij 110 kV, waar elektriciteit wordt omgezet naar 15 kV met 110 kV-voedingsleiding en 15 kV uitgangen. (Dutch)
16 December 2021
0 references
L'obiettivo del progetto è quello di aumentare la possibilità di collegare le fonti di generazione di elettricità FER senza contemporaneamente abbassare i parametri dell'energia fornita e ridurre al minimo il rischio di guasti e interruzioni nell'approvvigionamento energetico (saranno rimossi significativi ostacoli allo sviluppo dell'energia rinnovabile). A seguito del progetto, la possibilità di collegare i generatori di energia elettrica con le energie rinnovabili aumenterà. Inoltre, le condizioni per l'approvvigionamento dei clienti coperti dall'impatto della stazione miglioreranno. L'obiettivo diretto, e quindi il progetto, è coerente con gli obiettivi del programma operativo, l'asse prioritario e l'azione e la sottomisura 1.1.2 delle OPI & E. Il progetto riguarda la costruzione di una nuova centrale elettrica GPZ Skwierzyna II 110/15 kV composta da quadri da 110 kV e da 15 kV. La stazione fa parte di una rete di distribuzione a 110 kV, dove l'elettricità viene convertita in 15 kV con 110 kV di alimentazione e 15 kV uscite. (Italian)
16 January 2022
0 references
El objetivo del proyecto es aumentar la posibilidad de conectar fuentes de generación de electricidad FER sin reducir simultáneamente los parámetros de la energía suministrada y minimizar el riesgo de fallos e interrupciones en el suministro de energía (se eliminarán barreras significativas al desarrollo de energías renovables). Como resultado del proyecto, aumentará la posibilidad de conectar generadores de electricidad con FER. Además, mejorarán las condiciones para abastecer a los clientes cubiertos por el impacto de la estación. El objetivo directo, y por lo tanto el proyecto, es coherente con los objetivos del programa operativo, el eje prioritario y la acción y la submedida 1.1.2 del OPI & E. El proyecto cubre la construcción de una nueva central eléctrica GPZ Skwierzyna II 110/15 kV que consta de conmutadores de 110 kV y conmutadores de 15 kV. La estación forma parte de una red de distribución a 110 kV, donde la electricidad se convierte a 15 kV con una línea de alimentación de 110 kV y salidas de 15 kV. (Spanish)
19 January 2022
0 references
Formålet med projektet er at øge muligheden for at forbinde vedvarende energikilder uden samtidig at sænke parametrene for den leverede energi og minimere risikoen for svigt og afbrydelser i energiforsyningen (væsentlige hindringer for udviklingen af vedvarende energi vil blive fjernet). Som følge af projektet vil muligheden for at forbinde elektricitetsgeneratorer med vedvarende energikilder øges. Desuden vil betingelserne for forsyning af kunder, der er omfattet af virkningen af stationen, forbedres. Det direkte mål og dermed projektet er i overensstemmelse med målene for det operationelle program, prioritetsaksen og aktionen og delforanstaltning 1.1.2 i OPI & E. Projektet omfatter opførelse af et nyt kraftværk GPZ Skwierzyna II 110/15 kV bestående af 110 kV koblingsanlæg og 15 kV koblingsanlæg. Stationen er en del af et distributionsnet ved 110 kV, hvor elektricitet konverteres til 15 kV med 110 kV elledning og 15 kV udgange. (Danish)
26 July 2022
0 references
Στόχος του έργου είναι η αύξηση της δυνατότητας σύνδεσης των πηγών παραγωγής ηλεκτρικής ενέργειας από ΑΠΕ χωρίς ταυτόχρονη μείωση των παραμέτρων της παρεχόμενης ενέργειας και η ελαχιστοποίηση του κινδύνου αστοχιών και διακοπών στον ενεργειακό εφοδιασμό (θα αρθούν σημαντικά εμπόδια στην ανάπτυξη ανανεώσιμων πηγών ενέργειας). Ως αποτέλεσμα του έργου, θα αυξηθεί η δυνατότητα σύνδεσης των παραγωγών ηλεκτρικής ενέργειας με ΑΠΕ. Επιπλέον, θα βελτιωθούν οι όροι εφοδιασμού των πελατών που καλύπτονται από τις επιπτώσεις του σταθμού. Ο άμεσος στόχος, και συνεπώς το έργο, είναι σύμφωνος με τους στόχους του Επιχειρησιακού Προγράμματος, τον άξονα προτεραιότητας και τη δράση και το υπομέτρο 1.1.2 του OPI & E. Το έργο καλύπτει την κατασκευή ενός νέου σταθμού ηλεκτροπαραγωγής GPZ Skwierzyna II 110/15 kV που αποτελείται από 110 kV διακόπτες και 15 kV διακόπτες. Ο σταθμός αποτελεί μέρος ενός δικτύου διανομής 110 kV, όπου η ηλεκτρική ενέργεια μετατρέπεται σε 15 kV με γραμμή ισχύος 110 kV και εξόδους 15 kV. (Greek)
26 July 2022
0 references
Cilj projekta je povećati mogućnost povezivanja izvora proizvodnje električne energije iz obnovljivih izvora bez istodobnog snižavanja parametara isporučene energije i minimiziranja rizika od kvarova i prekida u opskrbi energijom (uklonit će se značajne prepreke razvoju obnovljive energije). Kao rezultat projekta povećat će se mogućnost povezivanja generatora električne energije s obnovljivim izvorima energije. Osim toga, poboljšat će se uvjeti za opskrbu kupaca obuhvaćenih utjecajem stanice. Izravni cilj, a time i projekt, u skladu je s ciljevima operativnog programa, prioritetnom osi te djelovanjem i podmjerom 1.1.2. OPI-ja & E. Projekt obuhvaća izgradnju nove elektrane GPZ Skwierzyna II 110/15 kV koja se sastoji od 110 kV rasklopnih uređaja i 15 kV rasklopnih uređaja. Stanica je dio distribucijske mreže 110 kV, gdje se električna energija pretvara u 15 kV sa 110 kV i 15 kV izlaza. (Croatian)
26 July 2022
0 references
Scopul proiectului este de a crește posibilitatea conectării surselor de energie electrică din surse regenerabile fără a reduce simultan parametrii energiei furnizate și de a reduce la minimum riscul de defecțiuni și întreruperi în aprovizionarea cu energie (vor fi eliminate barierele semnificative din calea dezvoltării energiei din surse regenerabile). Ca urmare a proiectului, va crește posibilitatea conectării generatoarelor de energie electrică la sursele regenerabile de energie. În plus, condițiile de furnizare a clienților vizați de impactul stației se vor îmbunătăți. Obiectivul direct și, prin urmare, proiectul este în concordanță cu obiectivele programului operațional, ale axei prioritare și ale acțiunii și submăsurii 1.1.2 din OPI & E. Proiectul acoperă construcția unei noi centrale electrice GPZ Skwierzyna II 110/15 kV, compusă din comutație de 110 kV și dispozitiv de comutație de 15 kV. Stația face parte dintr-o rețea de distribuție de 110 kV, unde energia electrică este convertită la 15 kV cu o linie electrică de 110 kV și 15 kV ieșiri. (Romanian)
26 July 2022
0 references
Cieľom projektu je zvýšiť možnosť pripojenia zdrojov elektrickej energie z obnoviteľných zdrojov bez súčasného zníženia parametrov dodávanej energie a minimalizovať riziko porúch a prerušenia dodávok energie (odstránia sa významné prekážky rozvoja energie z obnoviteľných zdrojov). V dôsledku projektu sa zvýši možnosť pripojenia výrobcov elektrickej energie s OZE. Okrem toho sa zlepšia podmienky pre zásobovanie odberateľov, na ktorých sa vzťahuje vplyv stanice. Priamy cieľ, a teda projekt, je v súlade s cieľmi operačného programu, prioritnou osou a akciou a čiastkovým opatrením 1.1.2 OPI & E. Projekt zahŕňa výstavbu novej elektrárne GPZ Skwierzyna II 110/15 kV, ktorá pozostáva z rozvádzačov 110 kV a 15 kV rozvádzačov. Stanica je súčasťou distribučnej siete s 110 kV, kde sa elektrina premieňa na 15 kV s elektrickým vedením 110 kV a 15 kV výstupmi. (Slovak)
26 July 2022
0 references
L-għan tal-proġett huwa li tiżdied il-possibbiltà li jiġu konnessi sorsi ta’ ġenerazzjoni tal-elettriku minn sorsi ta’ enerġija rinnovabbli mingħajr ma fl-istess ħin jitnaqqsu l-parametri tal-enerġija fornuta u jitnaqqas kemm jista’ jkun ir-riskju ta’ fallimenti u interruzzjonijiet fil-provvista tal-enerġija (se jitneħħew ostakli sinifikanti għall-iżvilupp tal-enerġija rinnovabbli). Bħala riżultat tal-proġett, se tiżdied il-possibbiltà li l-ġeneraturi tal-elettriku jiġu konnessi mas-SER. Barra minn hekk, il-kundizzjonijiet għall-forniment tal-klijenti koperti mill-impatt tal-istazzjon se jitjiebu. L-objettiv dirett, u għalhekk il-proġett, huwa konsistenti mal-objettivi tal-Programm Operazzjonali, l-assi prijoritarju u l-azzjoni u s-submiżura 1.1.2 tal-OPI & E. Il-proġett ikopri l-kostruzzjoni ta’ impjant tal-enerġija ġdid GPZ Skwierzyna II 110/15 kV li jikkonsisti fi switchgear ta’ 110 kV u switchgear ta’ 15 kV. L-istazzjon huwa parti minn netwerk ta’ distribuzzjoni ta’ 110 kV, fejn l-elettriku jiġi kkonvertit għal 15 kV b’linja tal-elettriku ta’ 110 kV u b’outputs ta’ 15 kV. (Maltese)
26 July 2022
0 references
O objetivo do projeto é aumentar a possibilidade de ligar fontes de produção de eletricidade FER sem reduzir simultaneamente os parâmetros da energia fornecida e minimizar o risco de falhas e interrupções no fornecimento de energia (os obstáculos pertinentes ao desenvolvimento das energias renováveis serão eliminados). Em resultado do projeto, será aumentada a possibilidade de ligar os produtores de eletricidade a partir de FER. Além disso, as condições para alimentar as pessoas afetadas pela estação serão melhoradas. O objetivo direto e, por conseguinte, o projeto, está em consonância com os objetivos do programa operacional, o eixo prioritário e as ações e submedidas 1.1.2 do PO. O projeto abrange a construção de uma nova central elétrica GPZ Skwierzyna II 110/15 kV, composta por uma aparelhagem de 110 kV e uma aparelhagem de 15 kV. A estação faz parte de uma rede de distribuição com uma tensão de 110 kV, onde a eletricidade é transformada numa tensão de 15 kV com uma linha de alimentação de 110 kV e saídas de 15 kV. (Portuguese)
26 July 2022
0 references
Hankkeen tavoitteena on lisätä mahdollisuuksia yhdistää uusiutuvista energialähteistä tuotetun sähkön tuotantolähteitä heikentämättä samanaikaisesti toimitetun energian parametreja ja minimoimatta energiatoimitusten epäonnistumis- ja keskeytymisriskiä (uusiutuvan energian kehittämisen merkittävät esteet poistetaan). Hankkeen myötä mahdollisuus liittää sähköntuottajat uusiutuviin energialähteisiin kasvaa. Lisäksi aseman vaikutuksen piiriin kuuluvien asiakkaiden toimitusehdot paranevat. Suora tavoite ja siten hanke ovat johdonmukaisia toimenpideohjelman, toimintalinjan sekä OPI & E:n toimen ja alatoimenpiteen 1.1.2 tavoitteiden kanssa. Hanke kattaa uuden voimalaitoksen GPZ Skwierzyna II 110/15 kV rakentamisen, joka koostuu 110 kV:n kytkinlaitteista ja 15 kV:n kytkinlaitteista. Asema on osa 110 kV:n jakeluverkkoa, jossa sähkö muunnetaan 15 kV:ksi 110 kV:n voimajohdolla ja 15 kV:n ulostulolla. (Finnish)
26 July 2022
0 references
Cilj projekta je povečati možnost povezovanja virov proizvodnje električne energije iz obnovljivih virov, ne da bi hkrati znižali parametre dobavljene energije in zmanjšali tveganje izpadov in prekinitev oskrbe z energijo (odstranili bodo znatne ovire za razvoj obnovljivih virov energije). Zaradi projekta se bo povečala možnost povezovanja proizvajalcev električne energije z OVE. Poleg tega se bodo izboljšali pogoji za oskrbo odjemalcev, ki jih pokriva vpliv postaje. Neposredni cilj in s tem projekt je skladen s cilji operativnega programa, prednostno osjo ter ukrepom in podukrepom 1.1.2 OPI & E. Projekt zajema gradnjo nove elektrarne GPZ Skwierzyna II 110/15 kV, ki je sestavljena iz 110 kV stikalnih naprav in 15 kV stikalnih naprav. Postaja je del distribucijskega omrežja pri 110 kV, kjer se električna energija pretvori v 15 kV s 110 kV električnim vodom in 15 kV izhodi. (Slovenian)
26 July 2022
0 references
Cílem projektu je zvýšit možnost propojení zdrojů výroby elektřiny z obnovitelných zdrojů bez současného snížení parametrů dodané energie a minimalizovat riziko poruch a přerušení dodávek energie (odstraní se významné překážky rozvoje energie z obnovitelných zdrojů). V důsledku projektu se zvýší možnost propojení výrobců elektřiny s obnovitelnými zdroji energie. Kromě toho se zlepší podmínky dodávek zákazníkům, na něž se vztahuje dopad stanice. Přímý cíl, a tedy projekt, je v souladu s cíli operačního programu, prioritní osy a akce a podopatření 1.1.2 OPI & E. Projekt zahrnuje výstavbu nové elektrárny GPZ Skwierzyna II 110/15 kV sestávající ze 110 kV rozvaděčů a 15 kV rozvaděčů. Stanice je součástí distribuční sítě 110 kV, kde je elektřina přeměněna na 15 kV s napájecím vedením 110 kV a 15 kV výstupy. (Czech)
26 July 2022
0 references
Projekto tikslas – padidinti galimybę sujungti AEI elektros energijos gamybos šaltinius tuo pačiu metu nesumažinant tiekiamos energijos parametrų ir kuo labiau sumažinant energijos tiekimo gedimų ir pertrūkių riziką (bus pašalintos reikšmingos kliūtys atsinaujinančios energijos plėtrai). Dėl projekto padidės galimybė prijungti elektros energijos gamintojus su AEI. Be to, pagerės tiekimo vartotojams, kuriems daromas stoties poveikis, sąlygos. Tiesioginis tikslas, taigi ir projektas, atitinka OPI ir E veiksmų programos tikslus, prioritetinę kryptį ir veiksmą bei 1.1.2 papriemonę. Projektas apima naujos elektrinės GPZ Skwierzyna II 110/15 kV, kurią sudaro 110 kV skirstomieji įrenginiai ir 15 kV skirstomieji įrenginiai, statybą. Stotis yra 110 kV skirstomojo tinklo dalis, kurioje elektros energija konvertuojama į 15 kV su 110 kV elektros linija ir 15 kV išėjimais. (Lithuanian)
26 July 2022
0 references
Projekta mērķis ir palielināt iespēju savienot AER elektroenerģijas ražošanas avotus, vienlaikus nepazeminot piegādātās enerģijas parametrus un samazinot energoapgādes traucējumu un pārtraukumu risku (novērsīs būtiskus šķēršļus atjaunojamās enerģijas attīstībai). Projekta rezultātā palielināsies iespēja savienot elektroenerģijas ražotājus ar AER. Turklāt uzlabosies nosacījumi to klientu apgādei, uz kuriem attiecas stacijas ietekme. Tiešais mērķis un tādējādi projekts atbilst darbības programmas mērķiem, OPI & E prioritārajam virzienam un 1.1.2. apakšpasākumam. Projekts attiecas uz jaunas spēkstacijas GPZ Skwierzyna II 110/15 kV būvniecību, kas sastāv no 110 kV komutācijas iekārtām un 15 kV sadales iekārtām. Stacija ir daļa no 110 kV sadales tīkla, kur elektroenerģija tiek pārveidota par 15 kV ar 110 kV elektrolīniju un 15 kV izejām. (Latvian)
26 July 2022
0 references
Целта на проекта е да се увеличи възможността за свързване на източници за производство на електроенергия от ВЕИ, без едновременно да се понижават параметрите на доставената енергия и да се сведе до минимум рискът от повреди и прекъсвания в енергийните доставки (ще бъдат премахнати значителни пречки пред развитието на енергията от възобновяеми източници). В резултат на проекта ще се увеличи възможността за свързване на генераторите на електроенергия с ВЕИ. Освен това условията за доставка на клиенти, обхванати от въздействието на станцията, ще се подобрят. Пряката цел и следователно проектът е в съответствие с целите на оперативната програма, приоритетната ос и действието и подмярка 1.1.2 на ОПИ и Д. Проектът обхваща изграждането на нова електроцентрала GPZ Skwierzyna II 110/15 kV, състояща се от 110 kV комутационна апаратура и 15 kV комутационна апаратура. Станцията е част от разпределителна мрежа при 110 kV, където електроенергията се преобразува в 15 kV с електропровод 110 kV и изходи 15 kV. (Bulgarian)
26 July 2022
0 references
A projekt célja, hogy növelje a megújuló energiaforrások villamosenergia-termelési forrásainak összekapcsolásának lehetőségét anélkül, hogy egyidejűleg csökkentené a szolgáltatott energia paramétereit, és minimálisra csökkentené az energiaellátás meghibásodásának és megszakadásának kockázatát (a megújuló energia fejlesztésének jelentős akadályai megszűnnek). A projekt eredményeként nő a villamosenergia-termelők megújuló energiaforrásokkal való összekapcsolásának lehetősége. Emellett javulni fognak az állomás hatása által érintett ügyfelek ellátásának feltételei is. A közvetlen célkitűzés és így a projekt összhangban van az operatív program célkitűzéseivel, a prioritási tengelysel, valamint az OPI & E 1.1.2. intézkedésével és 1.1.2. alintézkedésével. A projekt egy új GPZ Skwierzyna II 110/15 kV-os erőmű építésére terjed ki, amely 110 kV-os kapcsolóberendezésekből és 15 kV-os kapcsolóberendezésekből áll. Az állomás egy 110 kV-os elosztóhálózat része, ahol a villamos energiát 15 kV-ra alakítják át 110 kV-os elektromos vezetékkel és 15 kV kimenettel. (Hungarian)
26 July 2022
0 references
Is é is aidhm don tionscadal méadú a dhéanamh ar an bhféidearthacht foinsí giniúna leictreachais RES a nascadh gan paraiméadair an fhuinnimh arna sholáthar a ísliú ag an am céanna agus an baol go dteipfeadh ar an soláthar fuinnimh agus go mbrisfidh sé a íoslaghdú (cuirfear deireadh le bacainní suntasacha ar fhorbairt an fhuinnimh in-athnuaite). Mar thoradh ar an tionscadal, tiocfaidh méadú ar an bhféidearthacht gineadóirí leictreachais a nascadh le RES. Ina theannta sin, feabhsóidh na coinníollacha maidir le soláthar custaiméirí atá clúdaithe ag tionchar an stáisiúin. Tá an cuspóir díreach, agus dá bhrí sin, an tionscadal, comhsheasmhach le cuspóirí an Chláir Oibríochtúil, leis an ais tosaíochta agus le gníomhaíocht agus fobheart 1.1.2 OPI & E. Clúdaíonn an tionscadal tógáil stáisiún cumhachta nua GPZ Skwierzyna II 110/15 kV ina bhfuil lascthrealamh 110 kV agus lascthrealamh 15 kV. Tá an stáisiún mar chuid de ghréasán dáileacháin ag 110 kV, áit a ndéantar leictreachas a thiontú go 15 kV le líne chumhachta 110 kV agus aschuir 15 kV. (Irish)
26 July 2022
0 references
Syftet med projektet är att öka möjligheten att ansluta källor till elproduktion från förnybara energikällor utan att samtidigt sänka parametrarna för den levererade energin och minimera risken för fel och avbrott i energiförsörjningen (betydande hinder för utvecklingen av förnybar energi kommer att avlägsnas). Som ett resultat av projektet kommer möjligheten att ansluta elproducenter med förnybara energikällor att öka. Dessutom kommer villkoren för leverans av kunder som omfattas av effekten av stationen att förbättras. Det direkta målet, och därmed projektet, är förenligt med målen för det operativa programmet, det prioriterade området och åtgärden och delåtgärden 1.1.2 i OPI & E. Projektet omfattar byggandet av ett nytt kraftverk GPZ Skwierzyna II 110/15 kV bestående av 110 kV ställverk och 15 kV ställverk. Stationen är en del av ett distributionsnät på 110 kV, där el omvandlas till 15 kV med 110 kV kraftledning och 15 kV utgångar. (Swedish)
26 July 2022
0 references
Projekti eesmärk on suurendada taastuvatest energiaallikatest elektrienergia tootmise allikate ühendamise võimalust, vähendamata samal ajal tarnitava energia parameetreid ning vähendamata energiavarustuse rikke ja katkestuse ohtu (taastuvenergia arengut takistavad olulised takistused kõrvaldatakse). Projekti tulemusena suureneb võimalus ühendada elektritootjaid taastuvate energiaallikatega. Lisaks paranevad jaama mõjuga hõlmatud klientide varustamise tingimused. Otsene eesmärk ja seega projekt on kooskõlas rakenduskava eesmärkidega, prioriteetse suunaga ning OPI ja E osameetmega 1.1.2. Projekt hõlmab uue elektrijaama GPZ Skwierzyna II 110/15 kV ehitamist, mis koosneb 110 kV ja 15 kV jaotusseadmetest. Jaam on osa jaotusvõrgust 110 kV juures, kus elektrienergia muundatakse 110 kV elektriliini ja 15 kV väljundvõimsusega 15 kV-ks. (Estonian)
26 July 2022
0 references
WOJ.: LUBUSKIE, POW.: międzyrzecki
0 references
24 May 2023
0 references
Identifiers
POIS.01.01.02-00-0003/19
0 references