Management of the ‘Ewingi lake in Zalesie’ (Q132635): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item) |
||||||||||||||
Property / budget | |||||||||||||||
996,236.3 zloty
| |||||||||||||||
Property / budget: 996,236.3 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
239,096.71 Euro
| |||||||||||||||
Property / budget: 239,096.71 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 239,096.71 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 239,096.71 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 23:24, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Management of the ‘Ewingi lake in Zalesie’ |
Project in Poland financed by DG Regio |
Statements
796,989.04 zloty
0 references
996,236.3 zloty
0 references
80.0 percent
0 references
10 December 2018
0 references
31 October 2019
0 references
GMINA ZALEWO
0 references
Inwestycja została zaplanowana w odpowiedzi na potrzeby mieszkańców, turystów oraz przedsiębiorców w zakresie poprawy potencjału turystycznego gminy Zalewo, w tym główną potrzebę obsługi ruchu turystycznego przy jeziorze Ewingi w Zalewie. Zadanie obejmuje zagospodarowanie terenu rekreacyjnego na działkach nr 51/8, 51/10, 51/11 obręb 2 Zalewo oraz 233/1 obręb 1 Zalewo. Projekt w swych założeniach uwzględnia ochronę środowiska naturalnego, w tym podniesienie bioróżnorodności gatunkowej. Zakres projektu: 1. Zagospodarowanie terenu rekreacyjnego nad jeziorem Ewingi w Zalewie: - gospodarka istniejącą szatą roślinną, - prace rozbiórkowe i demontaż elementów małej architektury, - przygotowanie terenu i uprawa gleby, - wykonanie nawierzchni i obrzeży: - wykonanie nawierzchni utwardzonych - wykonanie nawierzchni mineralnych - wykonanie nawierzchni piaskowych placu zabaw - wykonanie nawierzchni utwardzonych(chodnik z desek drewnianych, ciąg pieszo-jezdny z kostki betonowej, chodnik z kostki granitowej) - obrzeża (obrzeża granitowe do nawierzchni mineralnych, obrzeża platikowe do rabat, obrzeża betonowe) -elementy małej architektury: •PERGOLA WIERZBINOWA 22m długości x 3m szerokości-1szt. •PERGOLA DREWNIANA 5m x 3,5m (+4 drewniane drabinki na pnącza) -1szt. •ZESTAW MEBLI ZEWNĘTRZNYCH (2 stoły i 4 ławki)-2 szt. •ŁAWKI Z OPARCIEM-3 szt. •ŁAWKI PÓŁOKRĄGŁE BEZ OPARCIA (przy placu zabaw, z tej samej deski co nawierzchnia) -4szt. •ŁAWKA OKRĄGŁA WOKÓŁ DRZEWA-1szt. •KOSZE NA ŚMIECI-3szt •TABLICA EDUKACYJNA -1 szt. •LATARNIE WYSOKIE -OPRAWY+SŁUPY-9szt. •SŁUPKI OŚWIETLENIOWE -23szt. •REFLEKTORY (PODŚWIETLENIE DRZEW LED)-36 szt. •ZESTAW ZABAWOWY -1 szt. •HUŚTAWKA 'PTASIE GNIAZDO'-1szt. •HUŚTAWKA PODWÓJNA-1szt. •LINARIUM-1szt. •KAMIENIE/GŁAZY DO SIEDZENIA-16 szt. -wykonanie nasadzeń roślinnych, polan i łąk kwietnych 2. Wykonanie instalacji oświetlenia terenu rekreacyjnego przy jeziorze Ewingi w Zalewie. (Polish)
0 references
The investment was planned in response to the needs of residents, tourists and businesses in improving the tourism potential of the municipality of Zalewo, including the main need for tourist traffic at Lake Ewinze lake in the Recommendation. The task covers the management of the recreational site on plots Nos 51/8, 51/10, 51/11 and, and 233/1 of 2. The project takes into account the protection of the environment, including the enhancement of biodiversity. Scope of the project: 1. Management of the ‘Ewingi lake in Zalesie’: — an existing plant, — demolition works and dismantling of the elements of small-scale architecture, — site preparation and soil cultivation, — completion of the surface and edges of the soil: Construction of paved surfaces — construction of a paved surface — surface of the hub of the playground — pavement of the paved surfaced (pavement of the wooden boards, gustatory thrust from a concrete pavement, a pavement with a granite stone) — the perimeter (margin of granite to the mineral surface, and the perimeter of the platform for the rebate, and concrete margins) — small architecture elements: • PERGOLA ANIMAL 22 m length x 3 m latitudes 1szt. • PERGOLA, wooden, 5 m x 3.5 m (+ 4 pennant trees) -1k. • intra muros MEBLI (2 tables and 4 benches) -2 units • benches Z OPARCIEM-3 • Basket without backrest (at a playground, with the same seat as the road surface) -4h. • town hall WOKÓŁA DRZEWA-1szt. • Travelling on ŚMIECI-3szt• Educational ICA TABLES — 1 items • TOWARDS TOGETHER HOUSE + SLAV + ŁUPY-9szt. • stripline (s) -23unit (s). • Headlamps (DRZEW LED lighting) -36 units • SUTAW — 1 items • swings ‘PTASIE socket’ -1/tonne. • WARSZWÓJNA-1szt. • LINARIUM-1 t. • Killing/bouldering TO 16 pcs. — the planting of plant trees, poulars and meadows in April 2. Installation of the lighting installation of the ‘Ewini lake in Zalesie’. (English)
0 references
Identifiers
RPWM.06.02.03-28-0009/17
0 references