RES investments in KORAL (Q131820): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 163,590.0 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 39,261.6 Euro / rank | |||||||||||||||
Property / budget: 39,261.6 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 39,261.6 Euro / qualifier | |||||||||||||||
|
Revision as of 23:05, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES investments in KORAL |
Project in Poland financed by DG Regio |
Statements
113,050.0 zloty
0 references
85.0 percent
0 references
16 March 2020
0 references
30 September 2020
0 references
ZAKŁAD KRAWIECKI "KORAL" AGNIESZKA ŚWIĄTEK
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Barczewo ul. Wojska Polskiego 50b dz. nr 47/7. W ramach projektu zaplanowano budowę nadachowej instalacji fotowoltaicznej o łącznej mocy zainstalowanych paneli 26,60 kWp Instalacja będzie posadowiona na dachu budynku. Projektowana instalacja składa się z 95 szt. polikrystalicznych paneli fotowoltaicznych o mocy 280 W, wyposażonych w optymalizatory mocy oraz 2 inwertery. Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
0 references
The applicant plans to carry out an investment consisting of installing solar panels in the existing infrastructure of the Applicant in the location of Barczewo ul. Polish Army 50b ref. no 47/7. The project is designed to construct an overserved photovoltaic installation with the total installed capacity of 26,60 kWp. the installation will be placed on the roof of the building. The design of the installation consists of 95 polycrystalline PV panels with a power of 280 W, equipped with power optimisation optimisation and 2 inverters. The phases of the implementation of the project: — submission of the grant application — signing of the grant agreement — selecting the contractor in accordance with the principle of competitiveness — conclusion of the agreement with the contractor and start of works — implementation of works in accordance with the planned timetable — Completion of the project and signature of the final protocol — Final bill of bill for implementation of the project: Signature — implementation of the contract — delivery of works — final acceptance and signature of the final protocol Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the firm through the use of indigenous renewable energy sources. The costs associated with energy consumption will be reduced as a result of the investment. (English)
0 references
Identifiers
RPWM.04.01.00-28-0186/17
0 references