Construction of sanitary sewage system, storm-water sewage system and mains in Koniecfield (Q124257): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 7,643,589.0 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,834,461.3599999999 Euro / rank | |||||||||||||||
Property / budget: 1,834,461.3599999999 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 1,834,461.3599999999 Euro / qualifier | |||||||||||||||
|
Revision as of 22:11, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of sanitary sewage system, storm-water sewage system and mains in Koniecfield |
Project in Poland financed by DG Regio |
Statements
4,573,064.24 zloty
0 references
76.48 percent
0 references
15 January 2018
0 references
28 June 2019
0 references
GMINA KONIECPOL
0 references
Projekt polega na budowie systemu wodno - ściekowego w mieście Koniecpol w dzielnicy Słowik, w tym: • budowie kanalizacji sanitarnej grawitacyjnej, kanalizacji sanitarnej tłocznej, przepompowni ścieków wraz z zasilaniem energetycznym (3 szt.); • budowie sieci wodociągowej wraz z przyłączami (stanowiącymi koszt kwalifikowany) i przebudowie istniejącej sieci wodociągowej; • budowie kanalizacji deszczowej; • wykonaniu robót drogowych i odtworzeniowych. Celem projektu jest zwiększony odsetek ludności gminy Koniecpol korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych poprzez rozwój systemu kanalizacji sanitarnej w gminie Koniecpol. W wyniku realizacji przedsięwzięcia zwiększy się liczba osób korzystających z systemu kanalizacji. Docelowo nasta?pi ograniczenie presji na s´rodowisko naturalne poprzez zmniejszenie ilos´ci s´cieko´w nieoczyszczonych wprowadzanych do środowiska, a takz˙e zwie?kszenie odsetka oczyszczonych s´cieko´w komunalnych. (Polish)
0 references
The project consists of a water waste water system in the town of Koniecpol in the Słok district, including: • construction of the gravity sewer, the sanitary sewage system, the pumping station along with the power supply (3 items); • construction of the water supply network along with the connecting costs (eligible costs) and the upgrading of the existing water supply network; • construction of a storm-water system; • implementation of road works and restoration works. The aim of the project is to increase the percentage of the population of Koniecpol benefiting from a wastewater treatment system compliant with the Urban Waste Water Directive through the development of a sewage system in the municipality of Koniecpol. As a result of the project, there will be an increase in the number of people using the sewerage system. The objective of the PI is to reduce the pressure on s’ natural environment by reducing the ratio of the number of those seconds’ in the raw material entering the environment, and the reduction of the percentage of the percentage of purified s’ in the urban area. (English)
0 references
Identifiers
RPSL.05.01.02-24-0795/16
0 references