Energy renovation of a workshop building a professional and social rehabilitation workshop for disabled people at a job or social activity in Nowa Sarnie (Q118668): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,335,947.0 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 320,627.27999999997 Euro / rank | |||||||||||||||
Property / budget: 320,627.27999999997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 320,627.27999999997 Euro / qualifier | |||||||||||||||
|
Revision as of 20:55, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of a workshop building a professional and social rehabilitation workshop for disabled people at a job or social activity in Nowa Sarnie |
Project in Poland financed by DG Regio |
Statements
796,126.6 zloty
0 references
85.0 percent
0 references
21 December 2015
0 references
21 December 2018
0 references
STOWARZYSZENIE "DOBRY DOM"
0 references
Głównym celem projektu jest zmniejszenie zużycia energii potrzebnej do funkcjonowania budynku warsztatów rehabilitacji zawodowej i społecznej. W przypadku przedmiotowego budynku projekt dotyczy ograniczenia zużycia energii cieplnej do ogrzewania budynku oraz zużycia energii elektrycznej na potrzeby oświetlenia budynku. Dodatkowym celem projektu jest zwiększenie udziału odnawialnych źródeł energii w produkcji energii elektrycznej poprzez wykonanie instalacji fotowoltaicznej na potrzeby własne budynku. W związku z realizacją zakresu rzeczowego projektu zostaną zmniejszone koszty za dostarczaną do budynku energię cieplną oraz elektryczną. Przedmiotowy budynek zlokalizowany jest w Nowej Sarzynie przy ulicy Łukasiewicza 3A, posiada powierzchnię ogrzewaną 792,44 m2. W obecnym stanie budynek wymaga modernizacji, gdyż przegrody budowlane oraz stolarka okienna i drzwiowa nie spełniają obowiązujących warunków technicznych co do izolacyjności cieplnej. Ponadto instalacja grzewcza jest skorodowana bez regulacji miejscowej, a wentylacja grawitacyjna nie spełnia swojej funkcji. Instalacja elektryczna i oświetlenie budynku wymagają wymiany. W ramach rzeczowej realizacji projektu planuje się wykonać szereg modernizacji polegających na: ociepleniu ścian zewnętrznych i fundamentowych budynku, ociepleniu stropodachów budynku, wymianę całej stolarki okiennej i drzwiowej (z bramą), wymianę instalacji centralnego ogrzewania oraz montaż wentylacji mechanicznej z odzyskiem ciepła. Dodatkowo planuje się wykonanie nowej instalacji elektrycznej oświetleniowej, a na stropodachach budynku montaż instalacji fotowoltaicznej PV o mocy zainstalowanej ok 40 kW. Wykonanie omówionych prac budowlanych i instalacyjnych przyniesie efekt w postaci zmodernizowanego energetycznie budynku, zmniejszenie zużycia energii finalnej o 166,81 MWh/rok, a tym samym ograniczenie emisji CO2 do atmosfery w ilości 74,03 ton /rok. Koszty za energię spadną o 45 127,44 zł rocznie. (Polish)
0 references
The main objective of the project is to reduce the energy consumption needed for the functioning of the building’s vocational and social rehabilitation workshops. In the case of the building in question, the project concerns the limitation of the use of heating to heating the building and the electricity consumption for the lighting needs of the building. The project’s additional objective is to increase the share of renewable energy sources in electricity generation through the installation of a photovoltaic for its own building. In connection with the implementation of the material scope of the project, the costs will be reduced for the heat and electricity supplied to the building. The building in question is located in Nowa Szyna, ul. Łukasiewicz 3A, with a heated floor area of 792.44 m². In the current state of the building, the building needs to be modernised, as the building blocks and window and door joinery do not fulfil the applicable technical conditions for thermal insulation. In addition, the heating system is corroded without local regulation and the gravity ventilation does not fulfil its function. The electrical installation and lighting of the building shall be replaced. In the context of the project’s objective implementation, a number of upgrades are planned: warming up the external walls and foundations, warming up the interior of the building, replacing all window and door frames (with gates), replacing the central heating system and installing mechanical ventilation with heat recovery. In addition, the installation of a new lighting electrical installation is planned and the installation of the photovoltaic installation PV with an installed capacity of about 40 kW is being installed on the roof of the building. The implementation of the construction and installation works discussed will result in an energy modernised building, a reduction in final energy consumption of 166.81 MWh/year and thus a reduction of 74,03 tonnes/year of CO2 emissions into the atmosphere. Energy costs will fall by PLN 45 127,44 per year. (English)
0 references
Identifiers
RPPK.03.02.00-18-0033/16
0 references