Energy renovation of municipal public buildings (Q112267): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item)
Property / budget
 
1,581,791.64 zloty
Amount1,581,791.64 zloty
Unitzloty
Property / budget: 1,581,791.64 zloty / rank
 
Normal rank
Property / budget
 
379,629.99 Euro
Amount379,629.99 Euro
UnitEuro
Property / budget: 379,629.99 Euro / rank
 
Preferred rank
Property / budget: 379,629.99 Euro / qualifier
 
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
Property / budget: 379,629.99 Euro / qualifier
 
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:47, 22 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of municipal public buildings
Project in Poland financed by DG Regio

    Statements

    0 references
    949,074.98 zloty
    0 references
    227,777.99519999998 Euro
    13 January 2020
    0 references
    1,581,791.64 zloty
    0 references
    379,629.99 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    30 December 2015
    0 references
    31 March 2019
    0 references
    GMINA KORZENNA
    0 references
    W projekcie przewidziano wykonanie 3 zadań: Przygotowanie projektu, Modernizacja energetyczna budynków użyteczności publicznej oraz Promocja. Zakres rzeczowy projektu, w szczegól. zad. nr 2 wynika z opracowanych audytów energet. W SP Jasienna obejmuje: modern. instalacji c.o., wyminę drzwi zewn., modernizację instalacji c.w.u., wymianę okien, ocieplenie stropu na poddaszu, ociepl. ścian zewnętrznych, wyk. inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W SP Miłkowa: modernizację instalacji c.o., wyminę drzwi zewn., montaż nawiewników, ocieplenie stropu na poddaszu, modernizację instalacji c.w.u., ocieplenie ścian zewnętrznych, wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spustowych. W OW Bukowiec: modernizację instalacji c.o., wyminę okien i drzwi zewn., montaż nawiewników, modern. instalacji c.w.u., ocieplenie stropu na poddaszu wraz z jego wyminą, ocieplenie ścian zewn., w tym fundament., wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W wyniku realizacji projektu wystąpi: 1.Poprawa efektywności energetycznej o 64%. 2.Zastosowanie indywidualnych liczników ciepła i c.w.u. 3.Montaż termostatów i zaworów podpionowych (wg audytu energetycznego). fXLISD0XlSclcQUFJtjrlPV5KRB56u2B0U4zOn5J 11 4.Redukcja emisji CO2 o 77%. 5.Obniżenie emisji pyłów (PM 10 i PM 2,5) o 94%. Wskaźniki produktu: Liczba zmodernizowanych energetycznie budynków-3szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 3 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych - 0,006 MWt Wskaźniki rezultatu: Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów – 2 188 GJ/rok Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych – 728 476 kWh/rok Ilość zaoszczędzonej energii cieplnej - 2 192 GJ/rok Szacowany roczny spadek gazów cieplarnianych – 179,9 t CO2/rok Produkcja energii cieplnej z nowo wybudowanych instalacj (Polish)
    0 references
    The project foresees 3 tasks: Project preparation, energy renovation of public buildings and promotion. The scope of the project, in particular Regulation 2, results from the energy audits. The following covers the following: moderation of secondary heating installations, local doors, replacement of windows, insulation of the floor on the loft side, insulation of outer walls. refurbishment of an external wall, construction of new gutters and pipes, installation of new guttering and pipes, and the installation of new entrants and pipes. In SP Milkova: modernisation of the central heating system, the removal of the doors, the mounting of the toll doors, the insulation of the roof ceiling, the modernisation of the hot water system, the insulation of external walls, the extract of the ramp., the renovation of stairs and chimneys, the installation of new gutters and pipes, and the installation of new gutters and trigger pipes. W Bukowiec: modernisation of the central heating system, the clearance of windows and external doors, the installation of conditions, etc., the installation of a ventilation system, the heating of the water system, the heating of the floor on the loft, the insulation of the walls of the wall, the insulation of the walls, including the foundation., the refurbishment of stairs and chimneys, the installation of new guttering and pipes, the installation of new guttering and pipes and the lowering of new pipes and pipes. The project will result in: 1.Improving energy efficiency by 64 %. 2.Use of individual heat meters and hot service hot water meters. 3.Assembly of thermostats and sub-vertical valves (according to the energy audit). fXLISD0XlclcQUFJtjlPV5KRB56U2B0U4zOn5J 11 4.Reduction of CO2 emissions by 77 %. 5.Reduction of particulate matter (PM 10 and PM 2,5) by 94 %. Product indicators: Number of energy modernised buildings — 3st. Number of units of generation of thermal energy produced from RES to be built: 3 Additional renewable heat generation capacity — 0,006 MWt Result indicators: Reduction in final energy consumption of projects — 2 188 GJ/year Reduction of annual primary energy consumption in public buildings — 728 476 kWh/year Amount of heat energy saved — 2 192 GJ/year Estimated annual decrease of GHG — 179.9 t CO2/rok (English)
    0 references

    Identifiers

    RPMP.04.03.02-12-0269/16
    0 references